INTERNSHIP REPORT
SIEMENS PAKISTAN
ENGINEERING .CO. LIMITED
HUMAN RESOURSE
MANAGEMENT
Submitted to :
HR DEPARTMENT OF SIEMENS
Submitted by :
Name : Saima Ahsan
Roll # w588478
Reg #: 07SKI 0080
Mailing Address: R 330 Block No. 14 F.B Area
Karachi
Contact No: 021-36323261 cell No: 0332-3005425
Student of : Allama Iqbal Open University Karachi
Roll # W588478
Roll # W588478
Roll # W588478
Roll # W588478
Roll # W588478
Roll # W588478
Roll # W588478
TABLE OF CONTENTS
1. Summary of the Organization.
10
2. Objectives of studying the
organization..11
3. overview of the
organization.13
3.1.
Brief history of the
organization..15
3.2.
Nature of the
organization20
3.3.
Business volume
25
3.4.
Number of employees
...28
3.5.
product
lines...29
4. (i) organizational structure of HR
department34
4. (ii) Human resources Management process in the Siemens
organization.35
4.1(a). Human Resource Planning and
forecasting...36
HRP process..37
Forecasting HR Requirement
.38
Methods to forecast HR
needs.39
4.1(b). Employee recruitment and
selection...40
Sources of
candidates...42
Internal sources45
External
sources...46
Employment
selection..47
4.1( c ). Training and
Development.50
8
Roll # W588478
Roll # W588478
28
10
Roll # W588478
7. Capital investment
.
8. Balance sheet
11.
Revenue
..
12.
Statement of changes of equity .
13.
No of employees
.
14.
cash flow
.
15.
Organizational chart .
16.
Org chart of Hr dept
.
17.
Recruitment application form
18.
Employee requisition form
19.
Job profile form
20.
Employee orientation form .
21.
Internship attendance sheet .
22.
Internship request form ..
23.
Std appraisal form
24.
Std evaluation form
29
29
30
30
31
33
34
36
37
38
52
54
67
71
72
74
76
86
87
88
89
SUMMARY
11
Roll # W588478
I am very thankful to all of the siemens organizational members and employees .they
help me in each step and give me guidance whenever I was entangles in different
stages. Firstly they give the opportunity to learn from the STP department here .Here
Sir Nabeel Rafique give me the guidance then he reference me to Mr. Zeeshan Adil
.Mr. Zeeshan Adil is a Sales Manager. He told me of all the stages of Sales
department firstly refer me Sir Sajjid Jamil who is a purchase manager .he give me
proper guide and told me all of the functions of Purchase department. In siemens
trading through Germany then orders conduct from different organization and then
purchaser team arranged the orders .then after arranging the orders the sales
mangers takes enquiry after that enquiry is complete then they purchase orders
makes. Then requisition of purchasing after requisition Management approval
through signature to sales manager .after that sales team they break up the orders in
business wise into IA and DT. After spirit purchase orders making through EDP. After
that SAP spirit on Purchase orders approval through managers then finally sends out
through EDI. Delivery date they gives them .order confirmation from Germany they
checkout orders wise. If substitute they inform to Germany then Okay .some time
Germany cancel the orders because of DAMEX or other reason after order
confirmation bank statement and bank counter establish then they receive the
GR{ good receive } .
Then after that I was go to HR department of SIEMENS .Here I meet to Mr. Fahad
Rasheed .He is a HR Personnel Officer. Basically work for student liaison program and
arrange the training and he gives me a lot of knowledge according to human
resource. He gives me all procedures of HR department .Here an organizational
structure is decentralized. He told me the recruitment and selection process .firstly
vacancy are comes then there are different method to fill this vacancy internal and
external .then the process of recruitment and selection is through job analysis, job
specification then HR review the Salary ,location job profile, verify HR , MD approve
through internal And external candidate they conduct through panel HR assessment
and test .they offer the selected people then employee joining and orientation start
.they also conduct the training and development .local and foreign firstly they assess
the training need and after that other one also the responsibility of HR department
Performance Management .performance Management is also a part of training and
development through performance management they easily understood whose need
the training what are benefits of this this personal if I give the training .in future what
we will get the benefits. Here the compensation program is so higher than other
organization they gives a lot of benefit to employees as well as workers .job changes
also conduct also here promotion , transfer, demotion all process are dealing properly
and honestly .here the Labour management relation are so good all benefits they
gives them .I am very thankful to all HR management team who give me a lot of time
and give me practically knowledge.
12
Roll # W588478
Thanking
Regards:
For: Siemens Pakistan Engineering Co. Limited
.
13
Roll # W588478
ORGANIZATION SUMMARY
Siemens Pakistan plays an integral part in the development and progress of the national economy
with a strong sense of responsibility to society and the environment. As a Corporate Citizen and
conscious of our Social and Environmental responsibilities, we function in a manner that protects
and preserves the environment for our future generations, ensures the health and safety of our
stakeholders and exerts a positive influence in the community. We regard environmental and
social aspects cardinal to sustainable economic development. We believe in the efficient use of
natural
resources and reduction and prevention of pollution. We also assess health, safety and
environmental aspects and impacts in the early stages of Product and Process development. With
these commitments, we at Siemens Pakistan:
Place our continuous and concerted efforts towards minimizing the impacts on the
environment and use of energy and natural resources.
Control monitor and minimize the generation of waste, emissions to air, water and land; and
are committed to comply with all applicable legal requirements
.
Ensure adequate controls to prevent any adverse effect on the environment and to reduce or
eliminate Health and Safety hazards.
Practice efficient energy management with resource conservation and promote recycling,
reuse, reduction and replacement wherever possible.
Promote awareness, responsibility and commitment for the conservation of the global
environment as well as health, safety and protection amongst all levels of employees.
Educate the employees on the issues of Health, Safety and Environment.
Work in a spirit of cooperation with the relevant authorities. We ensure full commitment to
these at all levels of management and conduct regular assessments and reviews to ensure the
continuance of improved Health, Safety and environmental conditions and to confirm the
effectiveness of the Companys policy, objectives, targets and programs in this regard.
Roll # W588478
.In siemens I study here How we can Recruiting the new employees , their
requisition , how can manage the training and development . What are the procedures of performance
appraisals .what are the qualities of Human resource manager .what are the responsibilities of human
Resource manager. How we can manage the compensation management. I am very thankful to
Siemens management who gives me opportunities to learn from practically.
Yes obviously I got my achievement because I had to theoretically study of all related to HR. but
practically I was nil. I have no idea how they can manage that long procedures in each and every
department HR is concern there are a lot of responsibilities of HR Management and team members.
So definitely I am heartful thankful to HR team of SIEMENS Organization who gives the opportunity
to learn through practically and always help me to complete my report.
15
Roll # W588478
Generating
Sets
,Health
Care
Solutions
,Medical
Solutions
,Technical
Services ,Hospital Solution, Hospital Projects, Med Tech., Services and the recently added
factory that will produce for the first time 220kV power transformers in Pakistan but also the
head office of the Company.
Siemens over all involvement in the region dates back more than 30 years .the company s name
first become known through the construction of the indo European telegraph line from London to
Calcutta in 870 .Siemens first office in Lahore ,what is now Pakistan ,opened in 1922 .
Siemens Pakistan Engineering company ltd, was founded in 953 s Private Company, and in 1953
s private company n d in 1963, the company .Our Top ranking in Karachi stock exchange is the
true testament of our leading position .Globally 475,000 employees working to develop and
manufacture products and install complex system and project and tailor wide range of services
for individual requirement .Siemens provide innovative technologies and comprehensive know
how to customer benefits to overall 190 countries.
16
Roll # W588478
History
Operational Siemens AG 170 kW hydropower generator built and installed in 1912 in Tsarska
Bistritsa Palace, Bulgaria Siemens was founded by Werner von Siemens on 12 October 1847.
based on the telegraph, his invention used a needle to point to the sequence of letters, instead of
using Morse code. The company, then called Telegraphen-Bauanstalt von Siemens & Halske,
opened its first workshop on Oct. 12.
In 1848, the company built the first long-distance telegraph line in Europe; 500 km from Berlin to
Frankfurt am Main. In 1850 the founder's younger brother, Carl Wilhelm Siemens started to
represent the company in London. In the 1850s, the company was involved in building long
distance telegraph networks in Russia. In 1855, a company branch headed by another brother,
17
Roll # W588478
Carl Heinrich von Siemens, opened in St Petersburg, Russia. In 1867, Siemens completed the
monumental Indo-European (Calcutta to London) telegraph line.
In 1881, a Siemens AC Alternator driven by a watermill was used to power the world's first
electric street lighting in the town of Godalming, United Kingdom. The company continued to
grow and diversified into electric trains and light bulbs. In 1890, the founder retired and left the
company to his brother Carl and sons Arnold and Wilhelm. Siemens & Halske (S&H) was
incorporated in 1897. In 1907 Siemens had 34,324 employees and was the seventh-largest
company in the German empire by number of employees. In 1919, S&H and two other companies
jointly formed the Osram light bulb company. A Japanese subsidiary was established in
1923.During the 1920s and 1930s, S&H started to manufacture radios, television sets, and
electron microscopes.
ARDNACRUSHA HYDRO POWER STATION
In the 1930s Siemens constructed the Ardnacrusha Hydro Power station on the River Shannon in
the then Irish Free State, and it was a world first for its design. The company is remembered for
its desire to raise the wages of its under-paid workers only to be overruled by the Cumannnan
Gaedhael government.[
WORLD WAR II ERA
Roll # W588478
contributed to the war effort and participated in the "Notification" of the economy. Siemens had
many factories in and around notorious concentration camps
[8][9]
military uses. In one example, almost 100,000 men and women from Auschwitz worked in a
Siemens factory inside the camp, supplying the electricity to the camp. The Siemens logo is still
visible above the gas chambers at Buchenwald concentration camp
POST-WAR
In the 1950s and from their new base in Bavaria, S&H started to manufacture computers,
semiconductor devices, washing machines, and pacemakers. Siemens AG was incorporated in
1966. The company's first digital telephone exchange was produced in 1980. In 1988 Siemens and
GEC acquired the UK defense and technology company Plessey. Plessey's holdings were split,
and Siemens took over the avionics, radar and traffic control businesses as Siemens Plessey.
In 1991, Siemens acquired Nixdorf Computer AG and renamed it Siemens Nixdorf Informations
system In October 1991, Siemens acquired the Industrial Systems Division of Texas Instruments,
Inc, based in Johnson City, Tennessee. This division was organized as Siemens Industrial
Automation, Inc., and was later absorbed by Siemens Energy and Automation, Inc.
In 1997 Siemens introduced the first GSM cellular phone with colour display. Also in 1997
Siemens agreed to sell the defense arm of Siemens Plessey to British Aerospace (BAe) and a UK
government agency, the Defence Analytical Services Agency (DASA). BAe and DASA acquired
the British and German divisions of the operation respectively.
In 1999, Siemens' semiconductor operations were spun off into a new company known as Inline
on Technologies. Also, Siemens Nixdorf Information system AG formed part of Fujitsu Siemens
Computers AG in that year. The retail banking technology group became Wincor Nixdorf.
In February 2003, Siemens reopened its office in Kabul
In 2005 Siemens sold the Siemens mobile manufacturing business to BenQ, forming the BenQSiemens division.
19
Roll # W588478
In 2006, Siemens announced the purchase of Bayer Diagnostics, which was incorporated into the
Medical Solutions Diagnostics division on 1 January 2007.
In March 2007 a Siemens board member was temporarily arrested and accused of illegally
financing a business-friendly labour association which competes against the union IG Metal. He
has been released on bail. Offices of the labour union and of Siemens have been searched.
Siemens denies any wrongdoing.
In April 2007, the Fixed Networks, Mobile Networks and Carrier Services divisions of Siemens
merged with Nokias Network Business Group in a 50/50 joint venture, creating a fixed and
mobile network company called Nokia Siemens Networks. Nokia delayed the merger . due to
bribery investigations against Siemens
In October 2007, a court in Munich found that the company had bribed public officials in Libya,
Russia, and Nigeria in return for the awarding of contracts; four former Nigerian Ministers of
Communications were among those named as recipients of the payments. The company admitted
to having paid the bribes and agreed to pay a fine of 201 million euros. In December 2007, the
Nigerian government canceled a contract with Siemens due to the bribery findings.
In July 2008, Siemens AG announced a joint venture of the Enterprise Communications business
with the Gores Group. The Gores Group holding a majority interest of 51% stake, with Siemens
AG holding a minority interest of 49%
In April 2009, Fujitsu Siemens Computers became Fujitsu Technology Solutions as a result of
Fujitsu buying out Siemens' share of the company.
CONTROVERSY
Siemens was part of a joint venture with Nokia in 2008 to provide Iran's monopoly telecom
company with technology that allowed it to intercept the internet communications of its citizens to
an unprecedented degree. The technology reportedly allowed it to use 'deep packet inspection' to
read and even change the content of everything from "emails and internet phone calls to images
and messages on social-networking sites such as Face book and Twitter". The technology "enables
20
Roll # W588478
authorities to not only block communication but to monitor it to gather information about
individuals, as well as alter it for disinformation purposes" expert insiders told the Wall Street
Journal. During the post-election protests in Iran in June 2009, Iran's internet access was reported
to have slowed to less than a tenth of its normal speeds, and experts suspected this was due to the
use of the interception technology. The joint venture company, Nokia-Siemens Networks, asserted
in a press release that it provided Iran only with a 'lawful intercept capability' "solely for
monitoring of local voice calls". "Nokia Siemens Networks has not provided any deep packet
inspection, web censorship or Internet filtering capability to Iran,"
Power Generation
Oil & Gas
High Voltage Substations
Transformer
Switch boards
Energy Automation
PID services
Solar
INDUSTRIAL SOLUTION
Infrastructure solution
21
Roll # W588478
Medical solution
Technical services
Hospital solution
Hospital projects
Med tech services
BUSINESS VOLUME
ENERGY
In the area of turnover and profitability, the Energy segment outperformed all other segments,
with turnover of Rs. 28,306 million and before tax profit t of Rs. 1,906 million. This achievement
is mainly attributable to High Voltage substations business in Dubai, UAE. The current years
profitability was also affected significantly due to unfavorable exchange rate fluctuations. In the
area of order intake the segment could not achieve the desired results. The major orders received
during the year include:
220KvGrid station
Roll # W588478
FUTURE PROSPECTS:
With the overall gap between the demand and supply situation of energy in Pakistan and the
Governments commitment to overcome the shortage in the near future, the Energy Sector offers
remarkable opportunities which never existed before. Moreover, with the increased environmental
concerns, Pakistan is looking for alternative methods of electricity generation including Wind
power. The willingness of private sector to invest in Wind power in Pakistan particularly GharoKeti-Bandar area along with the expertise of Siemens bring the Energy Sector at an advantage to
capture this segment in future.
SEGMENT PERFORMANCE
INDUSTRY
Industry Solutions
Industry Automation
Drive Technologies
The Industry Segment was able to secure new orders of Rs 6,755 million during the year. The
major orders include:
175MW Combined Cycle Power Plant for Doosan Heavy Industries and Construction
23
Roll # W588478
The segment achieved a turnover during the year of Rs. 6,860 million up by 24% as compared to
the previous year. The major turnover is coming from underground Electrification of Defense
Housing Authority, mechanical, electrical and instrumentation services for ABB SPA, supply of
MV/LV switchgears, transformers and SCADA system for Atlas Power plant and supply of diesel
generating sets to Water and Sanitation Agency. The segment profit t declined by 35% and stood
at Rs. 335.580 million. The profitability of the segment was affected mainly due to default in
payment by some customers. In addition to the significant projects mentioned above, the Industry
segment .offered a wide spectrum of products, services and solutions for customers in the areas of
process and manufacturing industries, transport, buildings and utilities. In view of the power crisis
in the country, we were also able to serve the industrial and corporate customers with our Diesel
Generating Sets.
FUTURE PROSPECTS
The Industry segment is well placed for securing sizable market share in future.
The Public Sector Development Program has been budgeted to the tune of Rs 646
billion in 2009-2010 an increase of Rs 227 billion as compared to revised budget
of last year. This huge investment in infrastructure by the government together
with expected industrial growth in future, promises better prospects for Industry
segment of the Company.
HEALTHCARE
Diagnostic Products
Special Products
SEGMENT PERFORMANCE
The Healthcare segment was able to achieve a significant growth in order intake and turnover
with volume of Rs. 1,017 million and Rs. 984 million, respectively. However, the segment could
not achieve the targets set for profitability. The major new orders include
24
Roll # W588478
FUTURE PROSPECTS
Pakistans health indicators, health funding, and health and sanitation infrastructure are generally
poor, particularly in rural areas. The current state of healthcare facilities, the size of population
and its growth, open the door of opportunities for this segment of the Company. The keen interest
of private groups is expected to improve the quality of life of common man as well as more
business opportunities for the Company.
Roll # W588478
The ordinary share of Rs 10 each of the company is valued at Rs 1,415 as at September 30, 2009,
signifying not only the sound base of the Company built over years of continuous success but also
the confidence of our members on the Company. The members of the company have benefit from
investing in the Company and have witnessed manifold increase in worth of their holdings over
decades.
26
Roll # W588478
27
Roll # W588478
28
Roll # W588478
NEW ORDERS:
New orders of Rs. 16 billion have been received during the year showing a diminution of
69% over last year. This significant reduction in new order value is mainly attributable to two
factors. Firstly, in the previous year we were able to secure extraordinary order intake due to
boom in the UAE market. In the current year we were not able to secure any major order.
Secondly, the local market also witnessed a dull situation not only because of the financial crisis
but also due to the domestic economic and political conditions.
SALES TURNOVER
The Company was able to achieve the highest turnover volume in its history as the
turnover reached to Rs 36 billion showing an increase of 34% over previous year mainly duet
projects being undertaken in the energy sector. The total
Turnover includes business of Rs. 21.5 billion (2008: Rs. 12.4billion) conducted in Dubai, UAE
and in Afghanistan in the area of construction of High Voltage substations, registering growth of
74% over last year. This increase was attributable to execution of orders received in the previous
year.
29
Roll # W588478
PROFITABILITY:
Despite all the odds in UAE and Pakistan market and the unfavorable business conditions,
the Company has managed to achieve profit t before tax of Rs. 2.1 billion, showing a decline of
16% as compared to the corresponding previous year. Inline with profit t before tax, profit t after
tax also recorded a decrease of 19%. The main contribution of erosion of profit stabilitys the
unfavorable exchange rate movement.
30
Roll # W588478
31
Roll # W588478
32
Roll # W588478
BALANCE SHEET
33
Roll # W588478
BALANCE SHEET
34
Roll # W588478
35
Roll # W588478
36
Roll # W588478
REVENUE:
37
Roll # W588478
38
Roll # W588478
NO OF EMPLOYEES IN SIEMENS
There are lot of employees work over their like Human resource department,, energy sector, health care,
finance department , Information technology department , Sales department, Purchase department, etc and
also working in Lobar department .there re lot of labor work over their and got lot of benefits .
Here employees are based on
a. Permanent employees
b. contractual employees
b.1. Trainees
c. Business unit contract Local contract
d. Third party contract
39
Roll # W588478
PRODUCT LINES
Products
Industrial
Telecommunications
Transportation
Siemens-Adtranz LRV
Duewag/Siemens 1435 mm Combino Low Flr LRV
MX3000 Metro car for Oslo (SGP Wien works) - Oslo T-bane, Norway
CAF S4000 Metro - Barcelona Metro
Schindler/Fiat-SIG/Adtranz Cobra Be 4/6 Low Floor LRV - Zurich VBZ
Class H Metro 5001 - Berlin BVG
SWBSiemensr NGT 6D LRV - Bonn, Germany
40
Roll # W588478
Control Systems
SIMATIC PCS 7 Process Automation System for Process and Hybrid industries
Siemens SPPA-T2000 Control System (formerly Teleperm XP)
Siemens SPPA-T3000 Control System (For Electrical Power Generation Control)
Healthcare
41
Roll # W588478
responsible actions
Excellent Achieving high performance and
excellent results
Innovative Being innovative to create
sustainable values
42
Roll # W588478
To remain
market leader and technology pace
setter in the engineering and
electronics industry by utilizing the
high-tech engineering expertise of
the Siemens Group worldwide. To
maintain our strong and prominent
local presence.
43
Roll # W588478
Roll # W588478
To
contribute
to
the
national
economy ,whilst realizing
strong
sense of responsibilities to society
and the environment
To enhance the investment of our
customers
through
human
Excellence,
our
technology,
our
processes, our high standards of
quality and financial strength.
To support and strive for technology
transfer to Pakistan through our
global resource and local presence.
MISSION
1. CUSTOMER
1.1 To determine and hire the right person for the right job
1.2. Deliver on Shared Services Roles
1.3. Manage and deliver on HR Calendar of Events
1.4. Completion of Organization Targets
GOALS/TARGET
1.CUSTOMER
1.1 Specific Job Profiles completed as identified in Company targets.
1.2 Integrate delivery time and turn around as per e-mail from CFO
1.3 Constantly monitor HR calendar
1.4 Monitor completion of targets and escalate for assistance as necessary.
1.5 Improve service delivery & quality rating.
45
Roll # W588478
STRATEGY
1. CUSTOMER
1.1 Appropriate Job Profiles with clear job descriptions and skill set
1.2 To comply with HR Calendar of Events
1.3 To achieve targets derived from Customer Satisfaction Survey
MISSION
2. FINANCIAL
2.1 Develop and deliver efficient and competitive SLA
2.2 Enhance Productivity
2.3 Reduce Costs
GOALS/TARGET
2. Financial
2.1 SLA delivery under the new structure of SMD
2.2 Improve time and timelines of delivery
STRATEGY
2. Financial
2.1 Cover service areas through SLA and maintain productivity
2.2 To provide Customers economical services and to be benchmarked as
The lowest in the regional cluster
2.3 Approx 8 Mio Indirect savings through payroll, travel, recruitment
and training related services
MISSION
3. EMPLOYEES
3.1 Determine and fulfill on Competency Development
3.2. Enhance creativity and job satisfaction
GOALS/TARGET:
46
Roll # W588478
3. EMPLOYEES:
3.1 Deliver according to People Strategy Competency development program
3.2 Determine KPIs from Customer Satisfaction Survey
STRETEGY:
3. EMPLOYEES
3.1 People Strategy fulfillment
3.1 Orientation and Open Sessions
3.2 Development of Action Plans
MISSION
4. PROCESSES
4.1 DQS Audit
4.2 HR Policy Manual
4.3 Alignment with global HR policies / procedures
GOALS/TARGET
4. PROCESSES
4.1 Rigorous follow up plan as per audit findings
4.2 Improve policy manual to reflect both transparency and quality.
4.3 Improve existing processes & Policies
STRATEGY
4. Processes
4.1 As per HR Schedule of Events
47
Roll # W588478
48
Roll # W588478
49
Roll # W588478
Industry Sector
o
Drive Technology
Industry Automation
Building Technologies
Security Solutions
Building Automation
Industry Solutions
Water Technologies
Mobility
Osram
Financial Solutions
Communication Networks
Energy Sector
o
Renewable Energy
Power Transmission
Power Distribution
Financial Solutions
50
Roll # W588478
Healthcare Sector
o
Laboratory Diagnostics
Infrastructure Solutions
Hearing Instruments
Financial Solutions
51
Roll # W588478
FINANCIAL MANAGEMENT
Siemens is committed to a strong financial profile, which gives us the financial fl edibility to
achieve our growth and portfolio optimization goals. Our principal source of Company financing
is cash inflows from operating activities. Our Treasury generally manages cash and cash
equivalents for the entire
Company and has primary responsibility for keeping funds available as and when required. In
addition to excess liquidity the Company has more than Rs. 4.7 billion credit lines with various
banks .At September 30, 2009 the Company held Rs. 1.403 billion in cash in various currencies
which were managed by Treasury. Treasury carefully manages investments of cash and cash
equivalents to optimize profits subject to strict risk and credit requirements.
Cash Flow
52
Roll # W588478
53
Roll # W588478
HIERARCHYOF SIEMENS
54
Roll # W588478
55
Roll # W588478
Function
Director HR
Mr. Amin Bandhani
amin.bandhani@siemens.com
Director
Secretary
Birthday Cards
Departmental Support
Personnel Development
Mr. Naukhez Arslan
naukhez.arslan@siemens.com
Mr. Syed Ghazanfar Ali
ali.ghazanfar@siemens.com
HR IT Landscape
PMP
SCD
GID
IDD
SMR
eRecruitment
Organization Chart
56
Roll # W588478
QMR
57
Roll # W588478
Outstation Allowance
Personnel Administration
Mr. Rashid Iftikhar
rashid.iftikhar@siemens.com
Contract Renewals
Taxation
Contract EOBI & Final Settlements
Company Cars
Business Cards
Long Service Jubilee Certificates
58
Roll # W588478
zafar.ahmed@siemens.com
zeeshan.anis@siemens.com
Bonus
Budget
Final Dues
Deputations
SLA Charging
Payroll Administration
Taxation
Medical Reimbursement
Salary Certificates
Salary Advances
EOBI
Group Insurance
ahmed.imran@siemens.com
59
Roll # W588478
Bank Loans
nasir.soomro@siemens.com
Filing
Personnel Records
Dispatches
Roll # W588478
61
Roll # W588478
62
Roll # W588478
63
Roll # W588478
OBJECTIVES
PLANNING
To determine future needs
To recruit and retain human resources
64
Roll # W588478
65
Roll # W588478
SUPPLY FORECASTING
1. Existing human resources
2. Potential losses to existing resources through employee wastage.
3. Potential changes to existing resources through internal promotion.
4. Sources of supply siemens from within org
5. Sources of Siemens supply from outside the org.
DEMAND FORECASTING
Process of estimating future people required Its basis must be the annual budget and long-term
Corporate plan. Considers:
1. External factors: competition, change in technology, laws and regulatory bodies.
2. Internal factors: budget, organizational structure, production levels etc.
66
Roll # W588478
HR FUNCTION OF SIEMENS
RECRUITMENT & SELECTION
The recruitment and selection of employees are driven by qualification, merit and fitness.
Progress within the company depends very much on employees ability, dedication and loyalty
towards the company. Employees who engage themselves in continuous learning and
consistently strive for improvement in their knowledge, skills and attributes excel with the
Organization. It is the company's practice to promote its own staff to higher positions whenever
possible. Our managers set clear, ambitious and inspiring goals. By leading on the basis of trust,
we empower our people to make their own decisions. We demonstrate courage and conviction
when introducing necessary changes. We expect out managers to serve as role models in
everything they do. The company reserves the right to transfer the employee within the
organization as and when the need arises. Employment is subject to obtaining a satisfactory
medical report from the company appointed doctor and presentation of previous employer
reference and/or resignation acceptance, wherever applicable. The Sourcing and Recruitment
policy aims to define a uniform framework of standards that support the presence of Siemens as
a technology leader in the market. These policies structure our internal standards and processes
for excellence in selection and recruiting.
WHAT IS THE PROCEDURE OF RECRUITMENT AND SELECTION?
1. Job Analysis
1.1 : Job Specification
1.2 : Job Description
2. Orientation
3. Selection
67
Roll # W588478
SIEMENS
RECRUITMENT APPLICATION FORM
POSITION APPLIED FOR:
APP. NO.:
I. Name:
II. Marital Status:
III. Nationality:
PHOTOGRAPH
Duration
FROM
TO
Position
NO
PARTIALLY
XI. Do you have any relatives working in siemens or who have worked in siemens?
YES
NO
If Yes, provide details
XII. Are you willing to work in other cities or towns in Pakistan?
YES
NO
XIII. How many working members are there in your family?....
XIV. Why Siemens?
Roll # W588478
c. ..
II. Your weaknesses:
a.
b.
EMPLOYEE REQUISITION
Employee Requisition Form is used when a new hiring is required for a unit. This form applies to
Permanent, Contract and Trainee positions. It is also used for conversion of Contract to Permanent
employees, Trainee to Permanent or Trainee to Contract.
The form is forwarded to HR, Recruitment Services with associated documents and signatures
as stated on the ERF.
EMPLOYEE REQUISITION FORM
Receiving Date
: ___________ months
Roll # W588478
Cost Centre:
Contract to Permanent
70
Roll # W588478
Function: Engineering
Design
Production
Sales
I.T / OI
QA
Finance/Accounts
Business Administration
Projects
HR
Audit
Others __________________________________
JOB PROFILE
Job Profile Form is used for all new employees to prepare a structured description of the
individual tasks and the skills necessary for the position. The form assists in clearly outlining the
job
responsibilities
of
the
position
and
the
skills
and
knowledge
required.
The form is used for discussion of supervisor with the new employee in order to have clarity of
role. It can also be used for recruitment for the position as well as analysis of competencies and
subsequent gap analysis.
Basi
c Da
Job
Profile
vali
d
fro
m:
Name of
Function
responsi
ble:
Org.
Unit
Country
71
Roll # W588478
Job Family
ta
C orporate
Division/Group
Division/G roupCorporate
Division/GroupSales Regions
Regio
ns
C ustomers/Partner/Associat i
ons
Position
Level
Nation
al
Internat io
nal
Product Business
System Business
Solution Business
Mission
of
Function
Dimensi
ons
of
Function
Contacts
(internal /
external)
Areas
Responsibility
Tasks
Responsibil
ity
Mnt
criteria
(Optional)
Tasks
Priorit
y
of
Knowledge
C o m p e t e n c i e s
Techniques (Technologies / Mthodologies /
Professional Knowledge)
Level
B/A/E
Business
Relevant.
72
Roll # W588478
Experience
Project /
Process
Variety of Function
Areas
Leadership
Variety of Function
Types
Intercultural
Variety of Cultures
ENERGY
ENERGYZE
EXECUT
E
Unlimited
thinking
Initiative
Communicati
on Skills
Analytics
Customer
Focus
Entrepreneu
rial spirit
Change
orientatio
n
Network built
on trust
Decision
making
Profession
al ethics
Self
determinati
on
Learning
Coaching &
Mentoring
Result
and
quality
orientatio
n
Siemens
values
Strategic
judgment
Business
compete
nce
Team player
Capabilities
EDGE
PASSION
Roll # W588478
Receiving Date
: _________________________
Basic Salary
House Rent
Conveyance Allowance
Utilities Allowance
Other
TOTAL
: Rs. _________________per month
-------------------------------------------
SELECTION ADVICE
74
Roll # W588478
Selection Advise is sent in by the business unit after an employee has been selected to be hired.
The
Entry
selection
of
Level
Tests
candidate
at
can
Universities,
take
place
through
e-Recruitment,
Job
number
of
advertisements
avenues:
external.
The hiring decision takes place upon use of the Interview Evaluation Forms (see below for further
details on Interviews).Only interviews conducted by DGM Level and above are acceptable. It is
mandatory to have 3 interviews conducted prior to selection: BU raising the ERF, Neutral BU and
Human Resources. The form is also used for Trainee to Permanent employees or Contract to
Permanent employees.
ERF TRACKER
ERF Tracker provides the status of all requisitions open in the system. The ERF Identifier is a
unique number assigned to a requisition and provides a mechanism of tracking each requisition
from receipt at HR Recruitment Services (complete ERF), approvals at each step and hiring
status. It is therefore very important to receive Interview results as soon as interviews are
conducted. The tracker is mailed to BU Heads each week
E-RECRUITMENT
E-Recruitment is an application of internet used to recruit / hire the right employee for each
position. The objective of this application to have a one stop information center for each
potential candidate as per hiring guidelines of Siemens AG and Siemens Pakistan.
With the approval of each ERF, a Job is opened on e-Recruitment in order to receive applications
against the required Job Position, track CVs short-list candidates, call for tests and interviews.
Test scores are also maintained in this application. The Interview status is also available for the
Key Account Officers to view and follow the status of each interview.
How to access the application: Passwords and demonstrations of the system have been offered to
business units. For further enquiries, please contact the HR IT Coordinator for access to this
systems
New Employee Integration - The purpose of this method is to describe a set of activities to be
performed in order to integrate new employees in as fast and efficient a manner as possible.
75
Roll # W588478
Employee Joining Package The purpose of this package is to provide new employees with all
the required information and documents to facilitate a safe and successful transition into new
working environment.
EMPLOYEE JOINING PACKAGE
A
few
of
the
documents
present
in
the
Joining
Packet
are:
Target agreements is an agreement form that is filled up by the concerned supervisor and the
employee. It comprises of targets and deadlines that need to be set for the responsibilities and
tasks concerned employee. This form is your achievement catalog and is used for final
performance evaluation at the end of the year.
TARGETAGREEMENTFORM
EMPLOYEE HANDBOOK The purpose of the Employee Handbook is to provide the
employee with comprehensive information about Siemens Pakistans rules and regulations.
PAYROLL NUMBERS: are issued upon receipt of completely filled documents in the Joining
Packet. Therefore it is compulsory to submit documents on time to your HR Coordinator
ORIENTATION PROGRAMS Orientation Programs are conducted for all new employees.
HR holds a session to describe the purpose and intent of the Joining Packet and the correct utility
of the enclosed forms.
Items covered:
Organization overview
HR Policies
INTEGRATION OF EMPLOYEES
The Orientation Program is held every month by HR on scheduled dates.
76
Roll # W588478
Please visit our Training and Development section to review our Internal and External Training
Calendars.
ASSESSMENT CENTERS NEW HIRING UNDER CONSTRUCTION
Assessment Centers are conducted for varying levels of employment in the business.
Level 1: Entry Level Entry Level Tests are conducted each Friday, 9:30 a.m. to 12:00 pm
INTERVIEW PROCESS
Intelligent and effective interviews form the cornerstone of good hiring techniques.
Interviewing is also an art that few people possess but most can master. Interview Evaluation
Form is used for the evaluation of candidates. It must be filled and returned to the Key Account
Officers once the interview has been conducted. Feedback from the interview is entered into the
E-Recruitment application in order to maintain track of the applicant while he/she goes the
various phases of selection. This is of benefit to both HR and the business units.
INTERVIEW EVALUATION FORM
Interview Evaluations Guidelines provide a list of questions as per the Siemens Leadership
Capabilities. Both condensed and details user guidelines are available on how to evaluate
candidates.
Roll # W588478
To develop the abilities of employees to satisfy the current and future needs of organization.
2. SCOPE:
All employees of Siemens Pakistan are covered under this procedure except trainees.
3. DEFINITIONS:
a) WHAT IS TRAINING?
Activities and programs that helps employees to perform their jobs effectively.
b) WHAT IS DEVELOPMENT?
PROCESS:
1. Training Need Analysis by BU / Dept. / Division
2. Local training plan and arrangement of training by HR
3. Foreign training plan and travel arrangements
EMPLOYEE DEVELOPMENT:
Roll # W588478
4. BU / Dept. / Division can also arrange interim training with the approval of Division
Head.
79
Roll # W588478
5. Travel arrangements including bond are made as per travel administration procedure (SP603).
6. Employee(s) are due to provide their feedback upon return.
7. It is the responsibility of BU / Dept. / Division to evaluate the effectiveness of training
course.
PERORMANCE MANAGEMENT
80
Roll # W588478
Confirmation of Service Upon completion of the probation period or the training period, HR
sends out an Advise to the business units. This is basically a confirmation, by the business unit,
that work thus far has been performed satisfactorily and the said employee or trainee may be
considered. To be made permanent (Satisfactory medical report and PEC mandatory)
To extend probation
To extend training
To separate
In the event of non-receipt of return advice from the BU, the employment/training stands
terminated. There is, hence, no employment contract between the company and the candidate
upon expiration of services.
1. PURPOSE:
To define the procedure for performance appraisals, increments and promotions of the
employees.
2. SCOPE:
The procedure is applicable for unionized (staff only) and non-unionized
Permanent Employees. Trainees, Contract employees, workers and those
Compensated through MBO are not covers in this process.
3. DEFINITIONS:
a) WHAT IS PERFORMANCE APPRAISAL?
Process of evaluating employees performance.
b) WHO ARE UNIONIZED EMPLOYEES?
Employees who are covered under union management agreement. In
Siemens Pakistan workers and staff from Grade 1 to Grade 16 are entitled
for union membership.
81
Roll # W588478
Roll # W588478
9. Final approval is granted by CFO and MD before the issuance of increment / promotion
letter. In case of disapproval it is sent back to HR. HR discusses it with Division Head and
revisions are made as per requirement of CFO and MD.
10. Once approved by CFO and MD, HR issues increment / promotion letters.
11. All the information is incorporated in payroll accordingly.
12. Increments and promotions
13. Granted subject to receiving of FD.
PROCEDURE (INCREMENT & PROMOTIONS NON-OFFICERS)
1. Increments to unionized employees are granted based on completion of one year from
previous increment. In case of new employees, increment is granted based on completion
of first year of service. A list of employees is generated one month prior to due increment
date through SAP.
2. These increments are granted based on union management agreement
3. Increment amount is specified on B Form and sent to Divisional management for approval
4. It is mandatory that employees BU / Dept. Head, Division Head and Director IR sign the
B form
5. Once received back, it is signed by Director HR
6. HR sends B Form to CFO and MD for signatures
7. HR issues increment letter to employee(s) and the information is incorporated in payroll
according.
TRAINING NEEDS LOCAL / INTERNATIONAL:
Training Request Form should be filled once the training has been identified between the supervisor
and the employee. Please ensure that the program you are requesting has been budgeted. If it has
not, a strong case will have to be presented in order for HR to approve the program. All
International programs require the approval of the CFO and MD do not recommend requests for
international programs outside the programs offered by Siemens Learning Campus. Costs budgeted
earlier (see above) play a vital role in approval of requested program.
83
Roll # W588478
TRAINING EVALUATION:
We offer a wide array of opportunities for employees to search, decide and attend. Please take a
proactive
approach
in
furthering
your
career
development.
Training Calendars provide an invaluable source for employees to select a program. These include InHouse Programs, External Programs and links to various institutes, .HR Trainings and Orientation
Programs as well as various initiatives such as Job Profile Training, Performance Review Training, and
Target Setting etc
INTERNSHIP:
In siemens the management gives the internship of universities students. Give opportunities to learn
something through practically
IN
TIME
OUT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
DATE
IN
TIME
OUT
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
______________
Cost Center____________________________
84
Roll # W588478
Extension: __________________________
Ending Date: __________
Fields
Fields
Engineering
Electrical
Electronics
Industrial Electronics
Telecommunication
Bio Medical
Industrial Engineering
Commercial
B. Com
M. Com
BBA
MBA
BCS
ACMA
INTERVIEW EVALUATION
Name of Candidate:
Position:
Attributes
Score
Ratings
Low
High
E.g.: Describe a situation in which you used your creativity and imagination to create a new product or
develop a new approach to things. How did it work? What was the outcome?
Initiative
E.g.: Tell me about time when you presented suggestions and ideas for improvement?
Communication
Skills
E.g.: English language proficiency. Give me an example of a time when you were able to communicate
successfully with another person, even when that individual may not have personally liked you.
Team Skills
E.g.: What do you share your work, experiences and ideas with your colleagues? Give a recent example.
E.g.: Sometimes we are confronted with people who have different attitudes or values from our own.
Describe a situation in which you had to work with people who had different values. Describe how you
handle the situation.
Situational
Sensitivity
Roll # W588478
Motivation &
Inspiration
E.g.: Strong intentions of joining Siemens. Has throughout reasons for it. Describe a situation where you
set challenging goals for yourself and others. Describe your though process when you did this. Describe
the roadmap you drew to achieve these goals.
E.g.: Educational background and academic achievements match with the requirement of the position.
E.g.: Has demonstrated leadership ability during his academic/ professional career. Has the ability to
handle/ resolve conflict.
E.g.: Has fair idea about major political, economic developments around the world.
General
Appearance
Academic
Knowledge
Leadership
Potential
General
Knowledge
Tel
1. ___________________________________________
1. ____________________________________________
2. ___________________________________________
2. ____________________________________________
3. ___________________________________________
3. ____________________________________________
4. ___________________________________________
4. ____________________________________________
Attribute skills
Ratings
Low
High
Creativity /Innovation
1
2
3
4
Initiative ( self Starter, Self Motivated )
1
2
3
4
Sense of Responsibility
1
2
3
4
Performance in teamwork
1
2
3
4
Communication Skills
1
2
3
4
Development potential
1
2
3
4
General Conduct / Behavior
1
2
3
4
Ratings:
1. Unsatisfactory (< 20); 2.Meets minimum expectations (21-40); 3. Meets expectations
(41-60);
4. Partially exceeds expectations (61-81); 5.Exceptional (81-100)
Recommendation:
Recommended for future hiring
86
Roll # W588478
Name of Appraiser
Date
Designation
Signature
Department Head
Creativity
E.g.: Describe a situation in which you used your creativity and imagination to create a new product or
develop a new approach to things. How did it work? What was the outcome?
Initiative
E.g.: Tell me about time when you presented suggestions and ideas for improvement?
E.g.: English language proficiency. Give me an example of a time when you were able to communicate
successfully with another person, even when that individual may not have personally liked you.
Team Skills
E.g.: What do you share your work, experiences and ideas with your colleagues? Give a recent example.
Situational
Sensitivity
E.g.: Sometimes we are confronted with people who have different attitudes or values from our own.
Describe a situation in which you had to work with people who had different values. Describe how you
handle the situation.
87
Roll # W588478
E.g.: Strong intentions of joining Siemens. Has throughout reasons for it. Describe a situation where you
set challenging goals for yourself and others. Describe your though process when you did this. Describe
the roadmap you drew to achieve these goals.
Appearance
Academic
Knowledge
E.g.: Educational background and academic achievements match with the requirement of the position.
Leadership
Potential
E.g.: Has demonstrated leadership ability during his academic/ professional career. Has the ability to
handle/ resolve conflict.
General
Knowledge
E.g.: Has fair idea about major political and economic developments around the world.
Motivation &
Inspiration
General
Ratings: 1-Unsatisfactory (< 20); 2-Meets minimum expectations (21-40); 3-Meets expectations (41-60);
4-Partially exceeds expectations (61-81); 5-Exceptional (81-100)
JOB CHANGES
PURPOSE:
To define a systematic procedure for the handling of separation process.
2. SCOPE:
This procedure encompasses all the activities related to separation process which includes
separation assessment & final settlement. Separation process is initiated through resignation,
retirement, termination / dismissal and death.
3. DEFINITIONS:
a) WHAT IS RESIGNATION?
Voluntary separation requested by employee.
b) WHAT IS RETIREMENT?
Separation on reaching superannuation age of 60 years.
c)
d)
WHAT IS PROMOTION?
88
Roll # W588478
Some examples of action against the Company's code of conduct are as follows:
a. Disobedience by an employee by refusing to carry out reasonable instruction.
b. Threatening, intimidating, provoking, assaulting, coercing other employees or
interfering with the work of other employees.
c. Behaving riotously, indecently or in a disorderly manner.
d. Slowing down or disputing the work or activities of the Company or influencing others
to do so.
e. Defacing or damaging the Company's property.
f. Involved in theft or fraud of the Company's, or other employees' money or property.
g. Possessing or selling drugs or harmful stimulants within the Company's premises.
h. Gambling in the Company's premises.
i. Attempting to defraud the Company.
j. Violation of clauses mentioned in employees appointment letter.
k. Any other act which is detrimental to the Company's image or which may disrupt the
peaceful working environment of the Company.
l. Sexual harassment.
89
Roll # W588478
PROCESS OVERVIEW
EMPLOYEE SEPARATION
Resignation
Termination / dismissal
Retirement
Death / obituary
Initial processing of separation / retirement
Exit interview
Final settlement
PROCEDURE (RESIGNATION ACCEPTANCE)
Employee willing to leave the company tenders his resignation, in writing to the immediate
supervisor he / she is reporting.
It is the responsibility of person in charge to the next higher manager in hierarchy within one day
of receiving. A copy should also be sent to HR.
BU / Dept. head upon receiving the resignation discusses his/her concerns and evaluates any
redress of grievances.
90
Roll # W588478
If employee agrees to withdraw resignation, it is sent to HR for personal file with comments.
If employee refuses to withdraw the resignation, the BU / Dept. head approves his resignation and
sends it to HR. A copy of accepted resignation should be sent to Division head for information.
HR issues separation letter to employee and sends a draft certificate to BU head to specify the
areas employee worked during his / her tenure.
Separation assessment (exit interview) is carried out as defined in procedure-separation
assessment (bullet-8).
Full and final settlement of dues is carried out and certificate is given to employee as defined in
procedure-final settlement (bullet-9). HR to ensure receipt of signed Statement of Non-disclosure
by leaving employee.
PROCEDURE (RETIREMENT):
A list of employees reaching superannuation age of 60 years is generated at the beginning of each
calendar year.
HR prepares retirement letter, retirement note and draft experience certificate of employee one
month prior to retirement. Retirement note specifies the amount that can be presented as a gift to
the employee on his / her farewell. The amount is calculated as per the following guidelines:
-
For staff and workers 50% of basic salary + 50% of cost of living allowance (COLA).
HR sends retirement letter, retirement note and draft certificate to BU / Dept. head.
After the certificate is received back from BU / Dept. HR prepares the experience certificate. This
certificate is given to employees at the time of final settlement.
Exit interview and final settlement are processed for retiring employee as defined in procedureseparation assessment (bullet-8) and procedure-final settlement (bullet-9) respectively.
91
Roll # W588478
* Incase of retirement of BU / Dept. or Division Head, the next higher hierarchical level would
assume the roles mentioned in 7.3 - 7.4.
PROCEDURE (SEPARATION ASSESSMENT):
A copy of separation letter is provided to concerned person for conducting exit interview.
Exit interviews are conducted for trainees and permanent employees. Based on employee
feedback, HR recommends necessary actions and sends a copy of exit interview form to
concerned BU, CFO and MD. Follow up on actions recommended is done on quarterly basis
through exit interview feedback status report. HR sends a quarterly report to the concerned BU,
CFO and MD on actions taken based on exit interview feedback.
Roll # W588478
Roll # W588478
subscriptions to the Fund are deducted every month from his/her salary and an amount equal to
that subscription is contributed by the Company to employees P.F account. Further details can
be seen in the booklet of P.F. guidelines which is provided to the employee upon confirmation.
.
4. GRATUITY
Above 6 months up to 5 years
15 working days basic salary per completed year of service or part thereof in
excess of six months.
Above 5 years up to
10 years
20 working days basic salary per completed year of service or part thereof in
excess of six months.
31 working days basic salary per completed year of service or part thereof in
excess of six months.
Above 15 years
35 working days basic salary per completed year of service or part thereof in
excess of six months
35 working days basic salary per completed year of service or part thereof in
excess of six months
40 working days basic salary per completed year of service or part thereof in
excess of six months
5 . E M P L O Y E E S O L D AG E B E N E F I T
This is a Government driven pension scheme. The maximum contribution per month is Rs.
300.00 per employee which is paid by the employer. In addition to the employers contribution,
the employee has to contribute Rs. 60.00 per month towards EOBI fund which is deducted from
his/her monthly salary. Under this scheme the government pays pension to those employees
who have retired after reaching the superannuation age of 60 years.
If the nature of job and function demands a mobile phone the same is allotted to them on the
basis of recommendations and bill limit from the concerned BU/Dept management and
approved by the respective Executive Director.
HR arranges for the mobile connection and the purchase of the Mobile set and subsequent
reimbursement is as per the Mobile phone policy. Payment of mobile bill is also routed through
94
Roll # W588478
HR for verification of the limit. In case of over limit, unless justified the excess amount is
deducted from employees salary.
This facility is strictly for official use and all personal & private calls must be paid by the
employee.
7 . AN N U AL B O N U S
Bonus is given to officers on the basis of the following:
The bonus, however, is not a part of salary, and hence it is not the legitimate right of an
employee. Its disbursement is at management discretion entirely.
8 . T R AN S F E R O F R E S I D E N C E
If the company requires the services of an employee at a different location from the present
place of employment, relocation expenses are paid. Should an employee, at his/her own request,
be transferred to another location and the company is able to accede to his/her request for the
transfer, no relocation expenses are paid by the company. Individual cases of hardship are
considered on their merit by the Human Resources and concerned Divisional heads or Executive
management.
9. OFFI C IA L BU S I N ES S TRI PS L OC A L AN D FOR E I GN
When an employee is required to travel for official business purposes, an Air Passage Request
Form (APR) available on Intranet, is required to initiate necessary travel arrangements. The
request is signed as per signature mandate. The rules, regulations and entitlements are
mentioned in the travel guidelines
However, to avoid discrepancies, employees traveling for official purposes are advised to
consult relevant travel consultant in HR before traveling. As per company rules employees are
obligated to plan their business trips rationally and economically.
95
Roll # W588478
1 0 . I N T E R N ATI O N A L D E L E G ATI O N S
Siemens, as a global employer, requires globally attuned and experienced employees as a
success factor for the company. Fundamental importance is therefore attached to globally
applicable delegation which supports the international transfer of employees.
T R AN S P O R T R E I M B U R S E M E N T
If the employee drives his/her own vehicle for official purposes, he/she may claim
mileage reimbursement and parking charges.
Staff members who work beyond 10.00 pm can claim taxi fare from office to place
of residence.
Staff members who attend office on non-working days can claim taxi fare or mileage
as per 11 a) and b) above from office to place of residence.
The employee is not eligible for the taxi fare reimbursement if he:
GROUP INSURANCE
All employees are insured under the Group Insurance policy, which provides protection and
compensation in case of injury and death during employment.
This Insurance Scheme provides partial or permanent disability and death benefits. The
quantum receivable in case of accident is assessable by the relevant authority (insurance
agency) through HR.
It is very important that the employee reports promptly to his/her superior of any accident
occurring in the course of employees work so that investigation can be carried out prior to the
filing of claims due to you.
96
Roll # W588478
L O N G S E R V I C E AWAR D
To recognize and reward loyalty of service to the Company, staff members who are employed
on local contract terms and who have completed at least 25 years of uninterrupted service are
eligible for long service awards
M E D I C AL B E N E F I T S
The Company provides medical health facilities in Pakistan and Azad Jammu and Kashmir to its
employees and their family members (family means spouse and up to4 children) as per their
category for consultation, hospitalization, laboratory tests, medication, vaccinations, dental
treatment and optometry treatment as and when required. In special consideration, the
management may elect to provide healthcare facility during the tenure of employment to those
who have temporary nature of job or have a contractual agreement with Siemens Pakistan.
Employees of Siemens Pakistan deputed in UAE will be covered under a separate file note for
medical services guidelines applicable at Siemens Branch Office Dubai as necessary. Employees
traveling on official trip shall be covered accordingly as explained in the traveling policy.
Anything not specifically covered in the guidelines, is not admissible for reimbursement and as
such does not give any right to the employee for lodging any claim whatsoever in this regard. The
detailed benefits under cover for each category are provided in the medical guidelines I benefit
documents attached as annexure and are available at the HRD web site. A hard copy of this
document may be downloaded for reference. Workers and Staff members, who are governed by
the Union Agreements, are provided healthcare facilities as per the agreement. Details of any such
agreement
are
available
with
Divisional
Director
Administration
and
Industrial
Relations.MD&CEO and CFO have the discretionary powers to provide, facilitate and authorize
expenses beyond the coverage of this policy for an employee or the family for healthcare
expenses which may be incurred outside this policy coverage, including foreign countries.
Siemens Pakistan reserves the right to add, amend or revoke any of the contained
rules, policies, regulations and instructions with notice as circumstances may require. All changes
are with immediate effect and will be applicable as per rules. This guideline supersedes all
previous file notes, circulars and guidelines issued on the subject of health benefits.
97
Roll # W588478
MEDICAL FACILITIES
SIEMENS Pakistan gives the medical facilities to their employees.
4. HOSPITALIZATION TREATMENT INCLUDING EMERGENCIES
Employees are required to use approved list of hospitals (as available in SP Offices and on HR
website) for hospitalization and get prior approval from CMO with regard to hospitalization and
dental treatment to avoid non-acceptance or disapproved claim. However, emergencies must be
attended to immediately and CMO must be informed within one working day accordingly.
Delayed communication of an emergency after one working day may result in non-acceptance or
disapproved claim.
5. MEDICAL TREATMENT - PRE~MANCY RELATED
Employees are advised to inform CMO in KHI or MO in LHE, ISB and QUE immediately after
confirmation of Pregnancy Test so that he can organize and take care of all future medical
treatment in this regard as per entitlement and applicable Limits. All employees have to ensure
that he/she has updated the status of family members to HR through Health Care Benefits
MEDICAL LEAVE
SICK LEAVE:
Employees in Category 'B' (SO) are granted sick leave as follows:
10 working days per year with full pay, and10 working days per year with half pay.
Employees in Category 'C' and 'D' (S1 and above) are granted sick leave as
Follows:
98
Roll # W588478
In case of prolonged sickness beyond the sick leave entitlement, the annual Leaves will be
adjusted. In case where both sick and annual leaves have exhausted, the employee may submit a
written application to the management through the healthcare committee through their respective
BU / Dept. for Special sick leave. The management may grant special sick leave depending upon
the nature of sickness. Payment of special sick leaves will, however, be only on the basis of basic
Salary. The employees are expected to inform HR through their respective BU / Dept.about
absence due to illness on the same day. If there is no possibility to do so, information is to be
given in writing within three (3) days. Sick leave for more than three days has to be certified by
CMO / MO and submitted to HR through their respective BU / Dept.
LEAVES
The employee is entitled to 21 working days annual leave during first two years of
employment and 27 working days subsequently.
In addition employee is entitled to 10 Casual leaves, 10 Sick leaves with half pay
annually.
Employees in grade S1 and above are entitled to 36 working days sick leave.
On duty accident leave is allowed with full pay but without conveyance allowance.
Every confirmed female employee shall be entitled to 84 calendar days maternity leave
for maximum two occasions during the service. Maternity leave shall only commence
after the seventh month of pregnancy. Any absence from work as a result of
miscarriage, or any other illness associated with pregnancy shall not be considered as
maternity leave but as normal sick leave or hospitalization leave whichever is
applicable. Application for maternity leave shall normally be made at least one (1)
month before the commencement date. It must be supported by a certificate from a
registered medical practitioner and duly approved by the healthcare representative.
Special Hajj leave is allowed for maximum 14 calendar days to maximum 2 officers
and 5 non-officers/workers through ballot only once during the service.
99
Roll # W588478
Leave earned during a year must be availed latest by the 31 st December of the following
year. If such leave is not availed by the stipulated date, it automatically lapses. Leave
encashment is not permissible.
A B S E N T E E I S M A N D TAR D I N E S S
It is the employees duty to avoid unnecessary absenteeism and tardiness. The employee is
expected to work on each work day, except for illness or approved absence. Absenteeism and
tardiness make proper work scheduling difficult and may cause extra hardship on fellow
colleagues who have to take over his/her responsibilities. The employee is required to inform
his/her Supervisor if he/she is unable to turn up for work or is unduly delayed for a long period.
Workers Incentives
Basic Salary
Cash incentives
Bonus
100
Roll # W588478
Yearly Increment
Medical allowance
Eid gifts
Leave
overtime
Medical allowance
Retirement
BASIC SALARY
The Siemens Pakistan gives the Basic Salary according to Pakistan Government policy.
BONUS
Whenever siemens got a profit so siemens Pakistan gives the bonuses to their workers and
employees and also gives the eid bonuses and other occasional bonuses. Bonus based on their
individual working repartition.
MEDICAL ALLOWANCES :
The Company provides medical health facilities to workers and their family members (family
means spouse and up to4 children) as per their category for consultation, hospitalization,
laboratory tests, medication, vaccinations, dental treatment and optometry treatment as and when
required. In special consideration, the management may elect to provide healthcare facility during
101
Roll # W588478
the tenure of employment rules, policies, regulations and instructions with notice as circumstances
may require. All changes are with immediate effect and will be applicable as per rules.
MEDICAL FACILITIES
SIEMENS Pakistan gives the medical facilities to their employees. Their treatment, their
vaccination and their children, spouse, injury case, accident case etc.
LUNCH FREE
In Siemens the lunch facility also available only for workers. And also the workers empowered
for making the MENU of weekend. Which types of menu they likes their union decides own self.
SCHOOL FEES FOR CHILDRENS
They are also providing the facility for educational purpose. children of workers got the
education and their expense from the side of siemens even if their child want to go for higher
studies to foreign country the Siemens take over the all expense of educational expense one of the
best facility whose siemens provide their workers .
CONVANCE FOR FEMALE
Another facility from Siemens side siemens give the facilities to their female workers free pick
and drop facility.
CONVANCE CHARGES FOR MALE
Siemens give the charges of convance to their Male workers.
102
Roll # W588478
monthly salary. Under this scheme the government pays pension to those employees who have
retired after reaching the superannuation age of 60 years.
RETIREMENT
Siemens also provide to their workers retirement Amount. After the 60 age siemens gives the
retirement amount.
RECOMMENDATION
103
Roll # W588478
As we seen siemens is a multinational and one of the top class company in all over Pakistan
Company .it is most difficult for me that I recommend something but I see here so I want to give
some suggestion
Time by time changing there structure the employee got mentally disturbs.
Here all employee have a lot of work so there employees do not give the proper time to
internees so I give the suggestion to management they higher the trainee for Internees so
internees will not facing problem and internees ask the question easily to the trainees.
The GCR size is so small and girls employees are more. In during prayers time the room
is so conjustised.
SWOT ANALYSIS
STRENGTH
104
Roll # W588478
competences, trust)
Siemens One
Cross-selling potential
SIEMENS is in a strong financial position. The business turned over more than 4 billion
in 2009.
leadership through scale with strong national and technological positions (top-3 market
positions)
WEAKNESSES:
105
Roll # W588478
Online advertising is a new income stream for organizations such as MSN, Yahoo! and
Goggle. Yes, today they are very, very profitable. However, as technology develops and
new unforeseen advertising media emerge, the future is uncertain for these income
streams. This is a weakness for Siemens and its competitors.
Low penetration on the market for consumer electronics and computers which is
dominated by Japanese competitors.
OPPORTUNITIES:
Growing IT service market
Establish regional service infrastructure and resource pools Cooperation
with large local partners
Acquisition of local company.
THREATS:
106
Roll # W588478
INTERNET REFRENCES
www.simens.com.pk
www.intra.siemens.com.pk
www.msn.com
www.wikipedia.com
www.scribd.com
www.ebusiness.com
www.google.com...
https://irc.siemens.de/proj/Reports/de/static_pag...
https://irc.siemens.de/proj/Reports/de/static_pag...
https://irc.siemens.de/proj/Reports/de/static_pag...
BOOKS REFRENCES :
Management
by Stephens
107
Roll # W588478
by Stephens
Compensation Management
CONCLUSION:
Siemens is future oriented group of engineering companies and growing up rapidly .siemens is
playing a vital role in strengthening the natural economy, creating new employees opportunities
and providing quality product to share customers .Besides controlling towards the economic
growth of country .company is very much dedicated to the services to the humanity and
participate in all spheres of social activities. Siemens has also many challenges in achieving its
target objectives in Pakistan and world wide high turnover.
108
Roll # W588478
109