Generation Report - 07 06 2015 PDF
Generation Report - 07 06 2015 PDF
CEB Hydro
CEB Thermal Oil
14820
CEB Coal
IPP Thermal
SPP Wind
509
Total Generation - 30,015MWh
Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included
Cumulative Dispatch
01st June 07th June
Category
Dispatch (MWh)
Category
Dispatch (GWh)
CEB Hydro
99,052
43.94%
CEB Hydro
2,136
40.17%
15,450
6.85%
251
4.71%
CEB Coal
98,400
43.65%
CEB Coal
2,386
44.87%
IPP Thermal
4,164
1.85%
IPP Thermal
267
5.02%
SPP Wind
8,376
3.72%
Renewable
278
5.22%
Total
225,442
Total
5,316
Note: Generation from Mini Hydro, Solar and Biomass power plants in April, May and June is not
included in annual cumulative renewable generation figure.
6000
5000
4000
Rated Capacity
Available
Dispatched
3000
2000
1000
250
200
Installed
Capacity
150
Available
Capacity
Night Peak Load
100
50
74
659
CEB Hydro
1083.4
23.4
Night Peak - 1899.5MW
57%
240
210
180
150
120
38.9%
84.8%
69.3%
55.2%
90
60
30
22.7%
0
Castlereigh
Maussakelle
Kotmale
Victoria
Randenigala Samanalawewa
Note: Hydro Reservoir Storage Capacity as at 07th June 2015 686.9Wh (54.58%)
GWh
1200
1000
800
2012
2013
600
2014
2015
400
200
MW
2200
2000
1800
1600
1400
1200
Nigh Peak
1000
Day Peak
800
Minimum
Demand
600
400
200
Note: Contribution from Mini Hydro, Solar and Biomass is not included
4-Jun
28-May
21-May
14-May
7-May
30-Apr
23-Apr
16-Apr
9-Apr
2-Apr
26-Mar
19-Mar
12-Mar
5-Mar
26-Feb
19-Feb
12-Feb
5-Feb
29-Jan
22-Jan
15-Jan
8-Jan
1-Jan
6000
GWh
5000
4000
SPP Wind
IPP
CEB Coal
3000
CEB Oil
CEB Hydro
2000
1000
2014
2015
Year
GWh
12000
11000
10000
9000
8000
7000
2014
6000
2015
5000
4000
3000
2000
1000
0
Note: Generation from SPP Mini Hydro, Solar and Biomass is not included
9
Capacity (MW)
Primary Fuel
CEB Hydro
Victoria
Ukuwela
Kotmale
Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe
210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6
CEB Thermal
Sapugaskanda 1
Sapugaskanda 2
Kelanitissa Small Gas Turbines
GT 7 - Kelanitissa
Kelanitissa CCY
Lakvijaya (Puttalam Coal)
Lakvijaya (Puttalam Coal) Stage II
Lakvijaya (Puttalam Coal) Stage III
New Chunnakam
72
72
85
115
165
285
285
285
24
51
163
60
270
Northern Power
27
10
Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel
Heavy Fuel
Auto Diesel
Furnace oil
Low Sulphur Furnace
oil
Auto Diesel