TABLE OF CONTENTS
1

Introduction

1.1

House Connection

Procedure for Building Permit Application

Foul Sewerage Design Criteria

3.1

General
3.1.1

3.2

3.2.1

3.3
3.4

3.5

3.7

Minimum Pipe Sizes and Gradients

Manholes and Inspection Chambers

Pipework

10

3.4.1

Materials

10

3.4.2

Construction

11

Building Drainage

11

3.5.1

3.6

Domestic Flows

Sewerage System Design

Construction

11

Septic Tanks, Holding Tanks and Soakaways

12

3.6.1

Ground Conditions

12

3.6.2

Design Issues

13

3.6.3

Siting of Septic Tanks and Soakaways

13

3.6.4

Design and Construction

13

3.6.5

Warning Notice

14

3.6.6

Sewage Holding Tanks

15

Pumping Stations and Rising Mains

16

3.7.1

Rising Mains

16

3.7.2

Pumping Stations

16

Storm Drainage

19

4.1

Introduction

19

4.2

Managed Drainage Systems

20

ADVICE NOTE NO 1 - SOAKAWAYS AND STORM STORAGE TANKS FOR SINGLE RESIDENTIAL
DEVELOPMENT

24

ADVICE NOTE NO 2 --

DRAINAGE FOR TOWER BLOCKS AND RESIDENTIAL DEVELOPMENTS

29

ADVICE NOTE NO 3 -

APPLICATION OF THE DRAINAGE IMPACT ASSESSMENT PROCESS TO


ZONAL AND DISTRICT DEVELOPMENT PROJECTS

33

APPENDIX SI -

INFORMATION REQUIRED FOR PROJECT PROFILE

37

APPENDIX SII -

INFORMATION REQUIRED FOR DRAINAGE IMPACT ASSESSMENT STUDY


REPORT

39

Volume 8 Developer's Guide

December 2006

Page 1 of 47

State of Qatar Public Works Authority


Drainage Affairs

APPENDICES
Appendix 1 - Building Permit Application
Appendix 2 - Design Unit Flows
Appendix 3 - Standard Drawings

Volume 8 Developer's Guide

December 2006

Page 2 of4?

State of Qatar Public Works Authority


Drainage Affairs

Introduction
The PWA is responsible for all public foul sewerage, surface water and ground water
drainage systems in the State of Qatar.
All applications for sewerage and drainage for servicing new developments are subject to
approval by the Drainage Affairs as part of the BUilding Permit approval procedure before
such facilities can be built.
This Developer's Guide is for small developments up to 350 persons, where the peak flow
does not exceed 51/s. Larger developments should be designed in accordance with the
requirements of Drainage Affairs' Vol 2- Foul Sewerage design manual.

1.1

House Connection
A house connection is defined as the connection from a development (comprising domestic,
commercial, industrial, institutional premises, etc) to transfer foul flows to the public
sewerage system.
For every house connection, a terminal manhole (Manhole Number 1 - MH1), in
accordance with the Standard Drawings, should be provided and should be positioned as
shown on 3.3.
The terminal manhole should normally have maximum depth 1.2m. The depth of first
Inspection Chamber should be 0.45m.
All house connections should comply with the following general principles:

They should be designed and constructed to enable foul flows to pass to the public
sewer without flooding or surcharge

They should be of 150mm minimum internal diameter

They should laid at minimum gradients 1:60

They should be constructed to watertight standards in accordance with the standard


drawings and specifications

The last Inspection Chamber is know as MH1 (terminal manhole) shall be located
within the property boundary but is PWA property.

The private sewerage system shall be designed and constructed as a separate system,
capable of accepting foul flows only. Illegal connections allowing the entry of storm water
runoff shall not be made to the foul sewerage system.
House connection to existing pipelines should be made preferably to the nearest manhole
whenever possible, or failing that to a V-junction previously incorporated into the pipeline
during its construction, to facilitate future connections. V-branches and saddles are not to be
added to existing pipelines to avoid the permanent damage resulting from such
modifications to the public sewer.
Y branches will only be approved by DA if manholes are impractical due to access
restrictions
Volume 8 Developer's Guide

December 2006

Page 3 of 47

State of Qatar Public Works Authority


Drainage Affairs

Sewer must be surrounded with a Grade OPC 20 Concrete in case of :

The pipe under the Foot path and the depth less than 0.9m

The pipe under the Carriageway and the depth less than 1.2m

Volume 8 Developer's Guide

December 2006

Page 4 of 47

State of Qatar Public Works Authority


Drainage Affairs

Procedure for Building Permit Application


The basic procedure for application and approval of drainage facilities for developments is
as follows;

Open a building permit file at the Planning Affairs

Produce Outline Design

Obtain utility approvals

Obtain DC1 approval

Obtain DC 2 approval

Collect building permit

The information that Drainage Affairs require to enable them to approve the development is
contained in Appendix 1.
Drainage Affairs requirement vary according to the nature of the property. A list of
properties and the associated requirements is provided overleaf. The list is a guide and is
not limiting.
The provision of septic tanks or holding tanks will only be necessary where there is no
existing sewerage system to connect to. Further information on the choice between septic
tank and holding tank is provided in Section 3.5.

Volume 8 Developer's Guide

December 2006

Page 5 of 47

State of Qatar Public Works Authority


Drainage Affairs

Table 2.1 Foul Sewerage Requirements


Category

Type of Development

Septic
Tank

Residential

Single Unit

./

Multiple
Storey
Commercial

Units

Holding
Tank

large./

Shops (small/large)

small./

large./

Restaurants
Outlet

small./

large./

./

./

Poultry shop

Industrial

Volume 8 Developer's Guide

Swimming
Pool
Discharge
Control

./

small./

Shopping Mall

Chemical
Screen
stabilisation /
dilution

./

/Multi

Food

Petrol
Oil/
Interceptor Grease
trap

./

Office (small/large)

Sand
trap

./

./

./

Hotels

./

./

./

Sports Clubs

./

./

./

Garages

./

Car Washing

./

./

./

./

December 2006

Page 6 of 47

State of Qatar Public Works Authority


Drainage Affairs

Category

Type of Development

Septic
Tank

Petrol Station

v'

Holding
Tank

Sand
trap

Petrol
Oill
Interceptor Grease
trap

Chemical
Screen
stabilisation I
dilution

Swimming
Pool
Discharge
Control

v'

Abattoir

v'

v'

Farm

Livestock

v'

v'

Public Service

Mosque

v'

Hospital/Clinic

v'

v'

Laboratory

v'

v'

School

v'

School with laboratory

v'

v'

v'

University / College

v'

v'

v'

Offices

v'

Volume 8 Developer's Guide

v'

v'

December 2006

Page 7of 47

State of Qatar Public Works Authority


Drainage Affairs

3
3.1

Foul Sewerage Design Criteria


General
Sewerage and drainage design shall generally comply with the requirements of EN 752
Drain and Sewer Systems outside Buildings. Particular requirements are detailed in the
following sections.

3.1.1

Domestic Flows
Domestic flows derive from normal domestic appliances such as sinks, basins, toilets,
showers, washing machines, baths, etc. and are dependent on the number of persons in a
dwelling. In order to determine suitable domestic contributions to the sewerage system, it is
necessary to make certain assumptions. For example, each property has to be assumed to
house a certain number of persons, and this will vary from one type of property to another.
For design purposes 270 litres per person per day should be used.
Peak flows from domestic properties are calculated on a Design Unit (DU) For ease of use
a table of populations, design units, peak flows and average flows is provided in Appendix 2.

3.2

Sewerage System Design


The sewerage system should be designed to facilitate flows within the development by
gravity, in a branched arrangement of small sewers from buildings connected to the main
sewer leading to MH1.
Manholes/inspection chambers and sewers should be sited wherever possible a minimum of
1.5m from any structural building line
Building over sewers, or directly adjacent to them, causes major problems with access for
maintenance and renewal. In extreme cases demolition may be required, and therefore
building over sewers should not be carried out.
Foundations and basements of buildings should be designed to ensure that no building load
is transferred to the sewer. The general principles of foul sewer design are:

Pipe size should not decrease downstream.

Sewers should be designed to convey peak flows without surcharge.

Sewers should achieve self-cleansing velocity at least once per day.

To allow for ventilation of the system, maximum design depth of flow should not
exceed 0.75 x pipe diameter.

Inspection chambers should be provided at each junction, change of diameter,


change of direction, change of gradient and at the head of each system.

Inspection chambers should be provided where the connection from each building
meets the main sewerage system of the development

Spacing between inspection chambers should not exceed 30m.

Volume 8 Developer's Guide

December 2006

Page 8 of 47

State of Qatar Public Works Authority


Drainage Affairs

3.2.1

At inspection chambers, all pipes should be laid such that their soffits (tops) are at
the same level.

Minimum Pipe Sizes and Gradients


The minimum size of external sewer from each building is 150mm at a gradient of 1:60.

3.3

Manholes and Inspection Chambers


All manholes and inspection chambers within the development shall have their own unique
reference number. Manholes and chambers shall be numbered in ascending order
upstream from the terminal manhole MH1. Foul manholes shall be prefixed F and
stormwater manholes shall be prefixed S.
Manholes and chambers at the head of each system shall include min 75mm or (1/2 x d)
piped vents fixed to adjacent walls and exiting at roof level.

5
Buliding line

GATE

Layout plans for both foul and storm water systems shall contain schedules as follows:

MH Ref

Cover
Level

Invert
Level

Depth

MHDia

Cover Type

All levels and dimensions are to be in metres to Qatar National Height Datum (QNHD).

Volume 8 Developer's Guide

December 2006

Page 9 of 47

State of Qatar Public Works Authority


Drainage Affairs

Standard manhole/inspection chamber sizes are.


SCHEDULES OF INSPECTION CHAMBERS
MH.
SIZE
(mm)
600X600

DEPTH
(m)

1200X600

COVER.SIZE
(mm)

COMMENTS
No. of Connections from Buildings

< 1.2

600X600

Up to 3 bldg. connections each side

< 1.2

1200x600

Up to 7 bldg. connections each side

1220 x675

1220x675

> 1.2

900 DIA

600X600

MH 1

The Cover Type for Manholes depend on the Location:

3.4
3.4.1

For foot traffic it should be Light Duty (LD)

For slow light vehicle traffic it should be Medium Duty (MD)

Pipework
Materials
The preferred material for foul sewers is extra strength vitrified clay pipes and fittings to BS
EN 295 or PVC-U to EN1401-1, with flexible joints.
Material
Pipe size mm

Min Crushing Strength KNI m2

150

34

200

40

No concrete or asbestos cement pipes shall be used as they will be eaten away by sewer
gasses.
Pumping mains may be flexibly jointed ductile iron pipes (it is recommended that these are
lined internally with fusion bonded epoxy, ceramic epoxy, or polyurethane to resist sewage
gases) or HDPE. uPVC should not be used as it is brittle and can fail.

Volume 8 Developer's Guide

December 2006

Page 10 of 47

State of Qatar Public Works Authority


Drainage Affairs

3.4.2

Construction
Construction should be in accordance with the Standard Drawings provided with this
document.

3.5

Building Drainage
Requirements for building drainage are applicable to domestic buildings or small nondomestic buildings. Systems are generally located within the building and above ground
level, unless the building has a basement. Complex systems in larger buildings should be
designed to BS EN 12056.
Building drainage of basement and ground floor shall employ a twin pipe system for
separate discharge of soil and waste flows to foul sewage manholes, as shown below:
Source of Discharge

System to which Discharge is to be


made

Toilet, urinals

Soil

Bidet

Soil

Wash basin, bath,


shower

Waste

Kitchen

Waste

. .
BUilding drainage of first floors and above shall employ a single pipe system.
Swimming Pools: To prevent flooding of the sewerage system the discharge from
swimming pools shall be limited to a maximum flow rate of 10 lis. Positive means of flow
control shall be provided such as a sharp edge orifice plate (50-60mm), a locked flow
control valve or a small diameter pipe (e.g 50mm x 3m long or 75mm x 10m long). As the
flow control will be dependent upon the particulars of the swimming pool installation the
developer shall provide calculations to demonstrate the design of the flow control device.

3.5.1

Construction
All sewerage and waste discharge pipes inside the bUilding as far as the manhole should be
PVC-U (unplasticised polyvinyl chloride) to BS 4660 and EN1401-1 with push-fit joints
incorporating elastomeric sealing rings to provide flexibility at joints.
Constructing pipelines below building should be avoided where possible. Where
unavoidable the design shall ensure that neither the structural integrity of the pipeline or the
building is compromised.
Pipeline trenches should not be excavated lower than the foundations of the building unless
concrete bedding and surround are used to the lowest level of the building foundation.

Volume 8 Developer's Guide

December 2006

Page 11 of 47

State of Qatar Public Works Authority


Drainage Affairs
.

3.6

Septic Tanks, Holding Tanks and Soakaways


Septic tanks and soakaways are used to store and treat foul flows from premises, prior to
future connection to the main sewerage system. They comprise an underground tank for
anaerobic treatment followed by a soakaway tank or pipe system to encourage effluent
flows to percolate into the surrounding ground.
Septic tank standard details are shown in Org OG 8 and OG9; soakaways for use with septic
tanks are shown in Org OG10.
Since septic tanks only provide partial treatment, these tanks are a major source of
groundwater pollution and therefore should not be constructed where the main sewerage
system is available. For existing developments, house connections from Manhole number 1
to the main sewerage system should be made at the earliest opportunity, and usage of the
septic and sewage holding tank stopped.

3.6.1

Ground Conditions
Since the soakaway relies for its operation on outflows infiltrating into the surrounding
ground, it is vital that the ground conditions allow such infiltration. Ground that is of low
permeability or with high existing water table will prevent percolation taking place, and the
septic tank system will fail.
Groundwater levels in many parts of this country have risen markedly in recent years, due
to:

the flat and undulating topography resulting in localised depressions in the underlying
impermeable layers. Such areas are without efficient drainage routes, and hence
susceptible to rises in groundwater levels during heavy rainfall.

Urban development has increased flows soaking into the ground, due to septic tanks,
water supply leakage and irrigation. The result has been significant rises in
groundwater levels, due to limited permeability of the ground.

Ground conditions and permeability are highly variable even within very localised
areas;

Most groundwater levels rise by between 1.0m and 1.5m during a wet period when
monthly rainfall exceeds 30mm. Level rise reduces to between 0.5m and 0.6m
nearer the coast;

Where soakaways do not work Holding Tanks should be provided for a period of 2 days
(min) storage.
Any proposed septic tank soakaway system must demonstrate that the surrounding ground
has satisfactory permeability.

Volume 8 Developer's Guide

December 2006

Page 12 of 47

State of Qatar Public Works Authority


Drainage Affairs

3.6.2

Design Issues
The following issues require consideration when the use of soakaways is contemplated. The
list is indicative only and site-specific geotechnical and hydrogeological investigation and
interpretation is always required as the basis for successful design.
For the standard ring-type soakaway chamber some 3m overall depth it is recommended
that:

The minimum (wet season) groundwater depth should be more than 3.5 m below
ground level;

In areas where groundwater levels are rising use the groundwater depth should be
more than 4 mbelow ground level as a precautionary measure.

The permeability of the ground has a significant influence on the ability of soakaways to
function. If the permeability is attributable to sub-vertical jointing which is very variable over
short distances and use of trench type soakaways may overcome this because the chances
of encountering fissured zones is increased. For soakaways a permeability (k) of more than
1x 10-5 m/s required
Soakaways can become inefficient due to becoming 'clogged'. This may be due to silting up
(which can occur early as the initial 'slug' of water laden with silt generated when
groundwater is disturbed during construction work), and/or 'smearing' when the soakaway is
drilled (i.e. the fissures are blocked off by the crushed drill cuttings). These problems may
be minimised by jetting the system clean prior to its first use.

3.6.3

Siting of Septic Tanks and Soakaways


Septic tanks should be sited min 7m from any habitable parts of buildings.
The septic tank must be sited in a location where a suction tanker can get to it to empty it.
The bottom of the tank should be less than 3m below the level where the vehicle will stand.
Where practical the soakaway should be located at a minimum of 5m from the septic tank or
any other structure. The soakaway should not be located within 10m of potable water
supplies in order to avoid possible cross-contamination.

3.6.4

Design and Construction


Septic tanks for domestic use should have a capacity below the level of the inlet of at least
C litres where:
C =(225P + 2000)
C is the capacity of the tank (in litres) with a minimum value of 2900 litres.
P is the design population with a minimum value of four.

Volume 8 Developer's Guide

December 2006

Page 13 of 47

State of Qatar Public Works Authority


Drainage Affairs

Sepf IC Tan k : S'Ize an d TIype


Population
Drainage Affairs Type

Capacity (Iitres)

2,900

10

4,500

20

6,500

40

11,000

80

20,000

100

24,500

200

47,000

300

78,500

350

80,750

Where septic tanks are required to accept discharges from other than domestic sources,
details of actual flows shall be provided.
Septic tanks are to be constructed in accordance with the Standard Details Drg. Nos. DG8
or DG9 as appropriate, or approved alternative prefabricated tanks. Tanks shall be
watertight and prevent leakage of their contents and ingress of groundwater. Ventilation is to
be provided with outlets distant from habitation.
The inlet and outlet of the septic tank shall be designed to prevent disturbance to the
surface scum or settled sludge, and shall incorporate at least two chambers or
compartments operating in series. Where the width of the tank does not exceed 1200mm
the inlet should be made via a dip pipe. To minimise turbulence, provision shall be made to
limit the flow rate of the incoming foul water. For incoming pipes up to 150mm diameter, the
velocity shall be limited by laying the last 12m of the incoming pipe at a gradient of 1 in 50 or
flatter.
The inlet and outlet pipes of the septic tank shall be provided with access for sampling and
inspection.
Septic tanks shall be provided with facilities for emptying and cleaning. Access covers shall
be of durable quality having regard to the corrosive nature of the tank contents. All access
shall be lockable or otherwise engineered to prevent unauthorised entry.

3.6.5

Warning Notice
A notice shall be fixed within an adjacent building describing the necessary maintenance.
The wording shall be in Arabic and English liThe foul sewage system from this property
discharges to a septic tank and soakaway. The septic tank requires monthly inspections of
the outlet chamber or distribution box to observe that the effluent is free flowing and clear.
The septic tank requires emptying at least once every 12 months by a licensed contractor.

Volume 8 Developer's Guide

December 2006

Page 14 of4?

State of Qatar Public Works Authority


Drainage Affairs

The property owner is legally responsible for ensuring that the system does not cause
pollution, a health hazard or a nuisance."

3.6.6

Sewage Holding Tanks


Where soakaways cannot be permitted due to unfavourable ground conditions or the
number of units delivering to the tank is high, it will be necessary to provide a sewage
holding tank.
The site of the sewage holding tank should preferably be on ground sloping away from and
sited lower than any existing bUilding in the immediate vicinity.
The tank shall be sited at least 7m from any habitable parts of buildings and preferably
down slope. Sewage holding tanks shall be sited such levels that they can be emptied and
cleaned without hazard to the building occupants or the contents being taken through a
dwelling or place of work. Access to the tank may be through a covered space, which may
be lockable.
Sewage holding tanks should have a minimum capacity for the population range as shown
in the Holding Tanks Capacity table.
Thereafter the size should be calculated as follows:
Volume (m 3) =Population x Retention x 0.27
Where the calculated volume is less than the minimum shown the minimum capacity is to be
provided.
Holding Tank Capacity
Population.
2- 20

Retention
(days)
25

Size
(m3)
18 - 135

21-40

20

135-216

41- 80

15

216 -324

80 -150

12

324 - 486

150- 350

10

486 - 945

Tanks should be designed as water retaining structures, and be constructed in reinforced


concrete, or alternative watertight material. The design of the tank shall ensure
watertightness and provide protection from external corrosion.
Sewage holding tanks should have no openings except for inlet, outlet and ventilation.
Tanks should be provided with access for emptying and cleaning. Access covers shall be of
durable material, having regard for the corrosive nature of the tank contents. Every access
should be lockable or otherwise engineered to prevent unauthorised entry.
The developer shall be responsible for making satisfactory arrangements with the Drainage
Affairs for emptying. of the sewage holding tank. Details of all maintenance arrangements
Volume 8 Developer's Guide

December 2006

Page 15 of 47

State of Qatar Public Works Authority


Drainage Affairs

will require to be approved by the Drainage Affairs prior to approval of the building permit
application.

3.7

Pumping Stations and Rising Mains


Pumping stations should only be used where it is impossible to gravitate into the PWA main
sewerage system.
Bypassing or overflowing from pumping stations is generally not
practical therefore failure of the pumping station may results in discharge of sewage to the
surrounding land or within the property
Responsibility for operation and maintenance of all pumping stations and rising mains will
remain with the developer. This Guide provides general information for pumping
installations. It is recommended that specialist advice be sought, supported by
manufacturers' recommendations.

3.7.1

Rising Mains
The desirable range of velocity should be 1mls to 2m/s. If small pipes are (.75mm) used
then the pump should be able to chop up the sewage.
The roughness value used for the design of the rising main should be shown in the
calculations and should be in accordance with "Tables for the Hydraulic Design of Pipes,
Sewers and Channels" published by HR Wallingford. The following roughness values (ks)
shall generally apply:
Mean Velocity in m/s

ks

Up to 1.1m/s

O.3mm

Between 1.1 mls and 1.5m/s

O.15mm

Over 1.5m/s

O.06mm

In the design of pressurised pipelines, thrust blocks are to be provided on flexibly jointed
pipelines where any pipe movement would open up the joints in the line and cause water
leakage.
Thrust blocks are also necessary near valves where a flexible joint is located to facilitate
removal of the valve for maintenance purposes.
The size of block is dependent upon the deflection of the flow, the size of the pipe and the
head of water inside the pipe.

3.7.2

Pumping Stations
Submersible Pumping Stations

It is expected that the maximum flows to be pumped will be less than 51/s, for which
submersible pumping stations are to be provided. Submersible pumping stations should
incorporate the following features:

Volume 8 Developer's Guide

December 2006

Page 16 of 47

State of Qatar Public Works Authority


Drainage Affairs

Minimum of one duty and one standby pump with all pumps being of the same make
and pump model number.

Pumps and associated equipment suitable for the duty required.

Non return and gate valve for each pump isolation.

Operation level controls (either electrode or ultrasonic) as follows:


High level alarm
Pump start
Pump stop
Low level pump protection in addition to the method installed for pump
control.

Ultrasonic level controls should be configured to hold the last measurement in the
event of a lost echo.

Design Requirements
Detailed design should incorporate the following:

There should be sufficient space between the pumps to prevent interaction between
the pump suctions.

Pump stools should be securely bolted to the structural concrete of the sump and not
the benching.

Discharge and non return valves to be in a separate easily accessible chamber


adjacent to the pump sump and not located within the pump sump.

Pump guide rails should rise close to the underside of the sump covers above the
pumps.

The covers should have a clear opening large enough to allow the removal of the
pump while on the guide rails.

Support points for the pump power cables and lifting chain should be provided under
the pump covers, these should be easily accessible from the surface.

Details of the capacity, power consumption and efficiency of the proposed pumps should be
submitted for approval. It would be expected that pumping stations would comply with the
pump manufacturer's requirements.
Submersible Pump Requirements
Sewage pumps should have an open type impeller with a minimum passage of 100mm
unless chopper pumps are being used. Impellers with smaller passages are likely to suffer
from frequent blockage due to the nature of sewage debris.

Volume 8 Developer's Guide

December 2006

Page 17 of 47

State of Qatar Public Works Authority


Drainage Affairs

Centrifugal pumps are recommended to have a maximum running speed of 1450 rpm (4
pole motor) pumps. Speeds in excess of this we cause excessive wear and premature
failure.
The maximum allowable starts per hour should be as specified by the pump or motor
manufacturer. In the absence of any specified figure a maximum of 15 starts/hour is
acceptable.
Structure Requirements
The developer shall supply full details of general arrangement and structural drawings and
supporting calculations for approval.
Package pumping stations contained in GRP or Polyethyelene structures as supplied by the
pump manufacturers are acceptable. The structures are to be surrounded by a minimum of
150mm of OPC20 concrete.
All other pumping stations shall be constructed of reinforced concrete, designed in
accordance with BS8110 "The Structural Design of Concrete" with specific requirements for
wet wells of BS8007 "Design of Concrete Structures for Retaining Aqueous Liquids".
Design crack widths shall be in accordance with BS8007 and shall not exceed a maximum
design surface crack width of 0.20mm from direct tension, flexure and temperature effects.
Ventilation and Odour Control
Small pumping stations generally do not require odour control. However, where odour
control is required passive activated carbon unit should be sufficient.
Electrical Requirements
All electrical equipment, cabling and installations shall meet the requirements of the
KAHRAMAA.
Control equipment shall be housed in dust and damp-proof, compartmentalised cubicles,
complying with the relevant British Standards. Adequate anti-condensation heaters are to be
provided in all compartments. All outdoor equipment shall be waterproof. All control panels
shall be provided with a 13-amp single-phase power outlet and a 25-volt outlet for a portable
inspection lamp.
Emergency stop, lock-off buttons shall be provided adjacent to all plant installations. Unless
specifically designed for submersible operation, all electrical plant shall be located above
maximum water level.
Site Requirements
Pumping stations will generally be located with the development site. Consideration should
be given to the need for light vehicle access for maintenance purposes.

Volume 8 Developer's Guide

December 2006

Page 18 of 47

State of Qatar Public Works Authority


Drainage Affairs

4
4.1

Storm Drainage
Introduction
The purpose of this guide is to advise developers of the Public Works Authority (PWA)
requirements for the provision of surface water and ground water management within
development sites.
The existing surface water and groundwater systems in Qatar are of limited extent. Primarily
these systems manage surface water runoff and control groundwater levels for the
highways. Urbanisation of the catchments increases the amount of potential runoff from
development sites which would cause overload of these systems. This guide has therefore
been developed to guide and assist developers in designing a managed drainage system
that does not adversely affect the existing drainage network but will provide protection from
flooding for the development.
This guide sets out the criteria that Drainage Affairs (DA) requires developers to follow for
the provision of a Managed Drainage Systems for the disposal of surface water and
groundwater.
Drainage Affairs have developed Advice Notes for four types of development which contain
information on how the Managed Drainage System approach can be achieved.
The types of development specified are as follows:single residential development
residential compounds
tower blocks
zonal &regional development
Figure 1 indicates the decision process for the appropriate type of development.

Volume 8 Developer's Guide

December 2006

Page 19 of 47

State of Qatar Public Works Authority


Drainage Affairs

Developer's Drainage Requirements

1
I

Managed Drainage System

Single Residential
Development

J.

See Advice Note 1

Residential
Compounds

See Advice Note 2

Definition:
Single house on a development plot.
Drainage Philosophy:
Infiltration/percolation systems
(soakways, infiltration basin etc) in areas
of low groundwater table.
Tanks in areas of high groundwater table.
Drainage systems to serve roofs and
hardstanding areas as necessary.

r Tower Blocks

~
Zonal and Regional
Developments

Definition:
A residential compound is a development
consisting of properties and internal roads
upto 5 hectares in area.

See Advice Note 2

Definition:
Tower block is defined as a multistorey
residential or commercial development.

1
Definition:
Development of residential compounds
greater than 5 hectares and development
of single and multiple QAR Zones.

Disposal of Surface Water


Direction connection permitted to
Drainage Affairs assets IT available.

Drainage Philosophy:
Drainage Impact Assessment (DIA)
required.

Permitted Discharge:
101/s per ha of development.

Disposal of Surface Water


No Direct connection to Drainage Affairs
assets permitted

Disposal of Surface Water


Direction connection permitted to
Drainage Affairs assets if available.

Permitted Discharge:
Not Applicable

Permitted Discharge:
101/s per ha of development.

Typical storage ReqUirements:


150m3/ha

Typical Minimum Storage Requirements


270m 3/ha

Appoint Recognised and


Experienced Drainage Consultant

Drainage Philosophy:
Storage/Allenuation tank system.

Drainage Philosophy:
Infiltration/percolation systems
(soakways, infiltration basin etc) and
storage system (tank sewers, retention
tanks ,etc) in areas of low groundwater
table. Storage tanks in areas of high
groundwater table.

See Advice Note 3

Typical Minimum Storage Requirements


390m 3/ha

Disposal of Surface Water


SUbject to approved DIA.
Permitted Discharge:
Subject to approved DIA.
Typical Storage Requirements
Subject to approved DIA.

1
Drainage Affairs Requirements
Submission of Project Profile
Submission and Approval of DIA

1
I

Proposal for Soakawayl


Stormtank System

Proposal for Managed


Stormwater System for
Residential Compound

Proposal for Managed


Stormwater System for
Tower Block

Proposal for Managed


Stormwater System for Zonal and
Regional Development

Figure 1: DEVELOPERS DRAINAGE REQUIREMENTS


Volume 8 Developer's Guide

December 2006

Page 20 of 47

State of Qatar Public Works Authority


Drainage Affairs

4.2 Managed Drainage Systems


The Developer should consider a number of basic principles before commencing with a site
layout plan as follows:

Site topography with respect to site levels should be studied in detail. Development
in the lowest parts ofthe sites should be avoided. The lowest parts of the site can be
used to store and collect any stormwater runoff minimizing the construct costs of
piped networks. Building on the highest part of the site may reduce amount of
protection from flooding that is required.

High groundwater tables can cause problems not only during construction but
afterwards with damage to underground structures and utilities. Drainage Affairs
have information available on the areas in Qatar where high groundwater is a
problem and can provide guidance as to its control. If a site is water logged filling the
low lying areas does not remove the problem, it only hides it from view. A long term
solution is needed which may include ground water control.

Drainage Affairs require surface water runoff to be managed and controlled for all
developments and therefore adequate provision should be made in all developments
for the storage/attenuation of stormwater runoff.

Ground conditions within the site should be understood, whether there is sand, fill
material or massive rock will all have an influence on the type of surface water
drainage systems that may be developed for the site.

Site grading has a considerable influence on the cost and effectiveness of the site
drainage and therefore should be considered at a very early stage. A flat or level site
is much more expensive to drain than a site which has some fall across it where
natural drainage paths can be developed. Development adjacent to the coast should
be graded to a minimum of level of 3.5m above Qatar datum. This will allow gravity
drainage systems to be developed and will protect other utilities and building
foundations from damage through high groundwater levels.

The design standards for the drainage system for the development should be
established at an early stage. The degree of protection from flooding for the
development needs to be established at an early stage to

Drainage Affairs philosophy is to manage to surface water and groundwater systems by the
use of various techniques that are part of the stormwater management philosophy described
under various names around the world such as SUDS(Sustainable Urban Development
(UK)), BMP (Best Management Practice (USA)) and Stormwater Management(Australia).
The techniques that have been identified as appropriate for Qatar are:Preventative measures
The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping
Volume 8 Developer's Guide

December 2006

Page 21 of 47

State of Qatar Public Works Authority


Drainage Affairs

suitable for a desert climate instead. Construction of individual tanks or soakaways for each
property to store or disperse the rainfall.
Pervious surfaces
Surfaces that allow inflow of rainwater into the underlying construction or soil. This is a
development of the block paving technique that is currently in extensive use in Qatar to
develop its full potential by the use of geotextile filter membranes.
Filter drains
Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store
and conduct water; they may also permit infiltration.
Swales
Swales consist of wide shallow channels with or without vegetation that conduct and retain
water, and may also permit infiltration. These work well within development sites with a
large proportion of landscaping where the design of the landscaping can easily incorporate
these features.
Emergency Flood Areas (EFA)
The use of Emergency Flood Areas (EFA) is well established in Qatar and is a viable option
for the management of surface water run off.
Infiltration devices
Sub-surface structures such at modular tanks systems that can promote the infiltration of
surface water to the ground. There are a number of proprietary systems on the market for
this.
Oversize Pipes and Throttles
This option is appropriate if there is a positive drainage system nearby that can take a
controlled amount of runoff for the site.
All of these techniques are valid solutions to produce a Managed Drainage System,
however every development site is different and will have different problems that will require
different
solutions.

Volume 8 Developer's Guide

December 2006

Page 22 of4?

State of Qatar Public Works Authority


Drainage Affairs

Stormwater Drainage References


1

Qatar Sewerage and Drainage Design Manual

Volume 3 Surface and Groundwater Drainage


Qatar Highways Design Manual

Soakaways: BRE Digest 151

4.

Scope for Control of Urban Runoff: CIRAI Report 124 1992

Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working
Group(UK) July 2004

Stormwater Best Management Practices in an Ultra-Urban Setting


US Department of Transport Federal Highway Administration

Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works)
Regulations 1999 : DEFRA UK

Volume 8 Developer's Guide

December 2006

Page 23 of 47

State of Qatar Public Works Authority


Drainage Affairs

ADVICE NOTE NO 1

1.0

SOAKAWAYS AND STORM STORAGE TANKS FOR SINGLE RESIDENTIAL


DEVELOPMENT

Introduction

Soakaways and storm tanks are simple methods of managing storm water run off in situations where there
is no positive stormwater system available or planned for the future.

The three determining factors for the design of a soakaway drainage system are:-

the size of the area which relates to the volume of water to be drained
the percolation rate of the soil/sub-soil
the depth to the water table i.e. the upper level of the groundwater that is naturally held
within the soil, sub-soil or bedrock. '.
Soakaways should be provided for all roof areas and hard standing areas within the building plot.

2.0

Soakaways or Storm Tanks

The choice of soakaway or storm tank for managing the surface water runoff from a site will
depend upon the depth of the ground water level for the ground surface.

The method of determining whether a soakaway or storm tank is appropriate is indicated 'on the
following flow chart.

Volume 8 Developer's Guide

December 2006

Page 24 of 47

State of Qatar Public Works Authority


Drainage Affairs

Residential Properties
Soakaway I Stormtank
Design Choice

Obtain Information on Ground water


levels from design query

No

Yes

Design the Soakway


in accordance with
the guidelines

Design the Storm


Tank in accordance
with the guidelines

Obtain Drainage Affairs


Approval

Figure 1: Choice of Soakaway or Storm Tank


3.0

Sizing of Facilities

3.1

Size of Soakaway

The following table shows the size of soakaway/tank that needs to be constructed.

Table 1: Depth of soakaway required for the design rainfall for different drainage areas
Chamber Volume Calculation
Chamber Diameter
Roof Area
to be
drained

Rainfall
Depth for 1in
2 year 24 hr
Duration

m2

Mm

100

25

200

Volume of
Storage

1.2

1.5

1.8

2.1

m3

0.9

2.3

1.99

1.27

0.88

0.65

25

0.9

4.5

3.98

2.55

1.77

1.30

300

25

0.9

6.8

2.65

1.95

400

25

0.9

9.0

3.54

2.60

500

25

0.9

11.3

4.42

3.25

Volume 8 Developer's Guide

Runoff
Coefficient

><><
><><
><><

December 2006

Page 25 of4?

State of Qatar Public Works Authority


Drainage Affairs

Note that this is the storage volume required between the dry base or water table level of the soakaway,
and the invert (inlet) level of the incoming drainage pipe, and assumes that the chamber is empty.
For example if the drainage area indicates that a 1.5metre diameter chamber with a soakaway depth of
2.55 then if the invert level of the incoming pipe is, say, 600mm below ground level, and assuming the
base is above water table level, then the overall depth of the soakaway is...
2.55m + 0.6m =3.15m overall depth.
If there is insufficient depth because of a high water table, the required volume of the soakaway can be
met by increasing the plan size or placing two or more soakaways of this size side by side.
3.2

Size of Storm Tank

The sizing of the stormtankl tank should follow the procedure indicated in Table 2.
Table 2: Depth of Tank required for the design rainfall for different drainage areas
Tank Volume Calculation
Tank Diameter

Area to
be
drained

Rainfall
Depth for
1in 2
year 24
hour
Duration

m2

mm

100

25

0.9

200

25

300

Volume
of
Storage

1.2

1.5

1.8

2.1

m3

1.1

2.5

2.19

1.40

0.97

0.71

0.9

1.1

5.0

4.38

2.80

1.95

1.43

25

0.9

1.1

7.4

2.92

2.14

400

25

0.9

1.1

9.9

3.89

2.86

500

25

0.9

1.1

12.4

4.86

3.57

Runoff
Coefficient

Factor
of
Safety

><><
>< ><
>< ><

It should be noted that the tank will have to be pumped out after the rainfall has finished, restoring the
flood protection of the property.

4.0

Construction details

4.1

Soakaway Construction

A typical standard detail drawing of a soakaway is included as Figure A1 of this advice note.

Volume 8 Developer's Guide

December 2006

Page 26 of4?

State of Qatar Public Works Authority


Drainage Affairs

Ready-made soakaway systems are locally available in pre-cast concrete. These tend to be circular
sections that can be stacked to give the required depth and storage volume, and then topped with a
suitable cover.

4.2 Tank Construction


A typical standard detail drawing for a stormwater tank is included in Appendix 3.
Pre-cast chamber rings are locally available and can be stacked to give the required depth and storage
volume.
Modular plastic boxes which can be used to provide both storage and soakaway functions are available in
the local market. For further information please contact Drainage Affairs.

5.0

Maintenance of Stormwater Systems

5.1

Soakaways

Soakaways do require some maintenance to keep them operating satisfactorily. Each year after the rainy
season the following maintenance task should be carried out:Inspect catchpit and remove any silt in the catchpit.
Inspect soakaway and remove any silt in the chamber.
5.2

Tanks

In order to make the tank effective in the control of stormwater runoff, after each rainfall event the tank
should be emptied of water and silt. The water in the tank should be tankered away or it can be used for
irrigation of any garden areas. Under no circumstances should the tank be emptied to the foul
sewerage system.
Each year after the rainy season the following maintenance tasks should be carried out:Inspect silt trap and remove any silt in the trap.
Inspect tank and remove any silt in the tank.
Inspect and repair any leaks.
6.0
6.1

Safety
Excavations

Excavations can be dangerous and the following points should be noted.


all excavations should be fenced off or covered to prevent accidents.
deep excavations should have sufficient support provided to prevent collapse of the
excavation or debris falling into the excavation.

Volume 8 Developer's Guide

December 2006

Page 27 of 47

State of Qatar Public Works Authority


Drainage Affairs

6.1.1

Entry into Confined Spaces

Any tank buried in the ground can be dangerous. Only qualified and experienced operatives who have
and are trained in the use the appropriate safety equipment for entry into confined spaces should be
employed to carry out the cleaning and inspection works.

References

Qatar Sewerage and Drainage Design Manual


Volume 3 Surface and Groundwater Drainage

Qatar Highways Design Manual

Soakaways: BRE Digest 151

Volume 8 Developer's Guide

December 2006

Page 28 of 47

State of Qatar Public Works Authority


Drainage Affairs

ADVICE NOTE NO 2

1.0

DRAINAGE FOR TOWER BLOCKS AND RESIDENTIAL DEVELOPMENTS

Introduction

The drainage of tower blocks and small residential compounds requires the designer of the drainage
system to develop site specific solutions to protect the development from the results of flooding.
The basic requirement is that the development must deal with its runoff within the site and not export the
problem to adjacent developments. Drainage affairs recommend a number of methods that could be used
to manage the drainage system form tower blocks and residential developments. The designer of the
proposed system should make himself aware of the concepts of managed drainage systems and choose
the most appropriate system for the site in question.
It is not obligatory, but it may be useful for the developer to produce a project profile for the site drainage.
The project profile provides a means to collect all relevant data for the development area which will help to
produce the Managed Drainage System proposal.

2.0

Managed Drainage systems

Drainage Affairs recommend that the designer of drainage system for the development investigates the
following measures and systems to manage the surface water run off.

Preventative measures
The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping suitable for
a desert climate instead. The use of individual tanks or soakaways for each property to store or
disperse the surface run off is another method of reduction in surface water run-off.

Pervious surfaces
Pervious surfaces are surfaces that allow inflow of rainwater into the underlying construction or soil.
In Qatar extensive use is made of block paving for footpaths and parking area. Instead of bedding
the concrete blocks directly on sand bed if they are laid on a granular sub-base water can stored in
the sub-base and infiltrate into the ground. Typically the sub-base consists of 300m of 25 - 150mm
grades stone overlain with a geotextile. The bedding for the block paving consists of 50 mm of 410 mm graded stone.

Filter drains
Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store and
conduct water; they may also permit infiltration.

Swales
Volume 8 Developer's Guide

December 2006

Page 29 of 47

State of Qatar Public Works Authority


Drainage Affairs

Swales consist of wide shallow channels with or without vegetation that conduct and retain water,
and may also permit infiltration. These work well within development sites with a large proportion
of landscaping where the design of the landscaping can easily incorporate these features. The
swales can be used for infiltration and evaporation. Areas of planting which are lower than the
surround areas can be used in a similar way to a swale.

Emergency Flood Areas (EFA)


The use of Emergency Flood Areas (EFA) is well established in Qatar and is a viable option for the
management of surface water run off. An area of the development site is designated as an EFA
and depending on the site usage and the depth of water to be stored may need to be fenced of to
prevent accidents to children and adults.

Infiltration devices
Sub-surface structures such at modular tanks systems that can promote the infiltration of surface
water to the ground. There are a number of proprietary systems on the market for this. This is
growth area in the field of managed drainage systems with a number of manufacturers being able
to provide plastic modular systems to build large tanks that can be installed under car parks
recreation areas etc which provide storage, attenuation and infiltration facilities for the surface
water run-off.
Oversize Pipes and Throttles
This option is appropriate if there is a positive drainage system nearby that can take a controlled
amount of runoff for the site. A smaller diameter pipe or orifice plate is used at the outlet to control
the discharge rate.

3.0

Basic Design Principles


The basic principle of the design of the drainage system for the development is to control runoff
within the development as follows:

No Drainage Affairs stormwater system available. Drain to on site stormwater storage


system as indicated on Figure 1 of these guidelines.
Existing or proposed Drainage Affairs stormwater system. Connection to the Drainage
Affairs system by overland flow, or direct connection via managed drainage system as
indicated on Figure1 of these guidelines.
4.0

Project Profile
In order that the designer can assess the requirements it is recommended but not obligatory to
produce a project profile. The project profile should include all relevant information available.
Information should be in note form. The checklist below is provided as a guide only, to assist in

Volume 8 Developer's Guide

December 2006

Page 30 of 47

State of Qatar Public Works Authority


Drainage Affairs

identifying major items which should be included or considered in completing the project profile to
assist in the choice of managed drainage system for the site.

1.

AN OUTLINE DESCRIPTION OF THE PROJECT

Provide the following information:

2.

Project title
Developer
Contact Person (name/telephone)
Nature and description of the project
Location (include plans)
Area of project site and % paved/unpaved
Finished site platform level
Whether planning permission application is required
Recent and dated photographs to show a panoramic view of the site

AN OUTLINE OF THE PLANNING AND IMPLEMENTATION PROGRAMME

a)

Explain how the project will be planned and implemented


e.g. authorized person/consultants/contractor.

b)

Identify the project timetable for:


appointing consultants/authorized person
planning/preliminary designs
preparing a Drainage Impact Assessment (DIA)study (if required - see
Advice Note No.3)
finalizing designs
implementation
completion/commencing operation
Identify any interactions with other projects which should be considered.

c)

3.

AN OUTLINE OF THE EXISTING DRAINAGE

Volume 8 Developer's Guide

December 2006

Page 31 of 47

State of Qatar Public Works Authority


Drainage Affairs

Provide the following drainage details:

4.

A 1:20000 scale plan of the catchment in which the project site is located with the
drainage system relevant to the proposed project highlighted.
A detailed layout plan at 1:5000 scale or larger, of the project site with the site
boundary, existing ground levels, existing drainage and existing land uses all
identified both within and adjacent to the project site.
A general description of the existing drainage including adequacy of the drainage
system and flooding history.

OTHER INFORMATION

Provide the following information:

Potential drainage impacts (described in broad terms) arising from the project.
A general description of the proposed drainage impact mitigation measures (if any) to
be provided.
A general description of the proposed drainage system.
A general statement on the flooding situation upon completion of the project.

References
1

Qatar Sewerage and Drainage Design Manual


Volume 3 Surface and Groundwater Drainage

Qatar Highways Design Manual

Soakaways : BRE Digest 151

4.

Scope for Control of Urban Runoff: CIRAI Report 124 1992

Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004

Stormwater Best Management Practices in an Ultra-Urban Setting


US Department of Transport Federal Highway Administration

Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 :
DEFRA UK

Volume 8 Developer's Guide

December 2006

Page 32 of4?

State of Qatar Public Works Authority


Drainage Affairs

ADVICE NOTE NO 3

APPLICATION OF THE DRAINAGE IMPACT ASSESSMENT PROCESS TO


ZONAL AND DISTRICT DEVELOPMENT PROJECTS

Table 1

1.

INTRODUCTION

1.1

This Advice Note outlines the Drainage Affairs assessment procedures for the drainage impact
of zonal and district development projects. It is anticipated that the information contained in
this document will assist in preparing project profiles and in addressing the project's potential
drainage impacts.

1.2

Many private sector projects have the potential to cause adverse impacts on stormwater
drainage, groundwater and flooding. These impacts need to be considered at the early stages
of the project planning and designed to minimize drainage and flooding problems and to avoid
expensive remedial measures.

1.3

The Drainage Impact Assessment (DIA) process provides for a systematic approach in
addressing drainage issues associated with any project. The primary objective of the DIA
process is to demonstrate that with the implementation of necessary mitigation measures, the
project will not cause an unacceptable increase in the risk of flooding in areas upstream of ,
adjacent to, or downstream of the development.

2.

ROLES AND RESPONSIBILITIES OF THE DEVELOPER

2.1

The developer of a zonal or district development project is responsible for:


(a)

preparing the project profile and undertaking the DIA study if required;

(b)

implementing all measures necessary to mitigate adverse drainage impacts identified


by the DIA study;

(c)

monitoring the project's drainage performance during construction; and

(d)

taking all measures necessary to redress unanticipated or unacceptable impacts arising


during project construction.

2.2

The application of the DIA process to a particular project should not be separated from the
other basic investigation and design processes. Thus, the developer can integrate drainage,
environmental, technical and economic assessments to produce the best and most
appropriate project design.

3.

ROLES OF DRAINAGE AFFAIRS

3.1

DA is responsible for examining project profile; determining whether DIA study is required;
approving DIA study report submitted under the DIA process; and advising the Planning
Department drainage conditions on the project.

Volume 8 Developer's Guide

December 2006

Page 33 of 47

State of Qatar Public Works Authority


Drainage Affairs

3.2

Notwithstanding that the developer may have submitted proposals in accordance with the
guidelines stipulated in this Advice Note and DA may have accepted such proposals or have
required such proposals to be amended prior to acceptance, DA shall have no liability to the
proponent for any damage, injury, losses, claims, charges or fees which may arise from any
act, omission or negligence howsoever caused by DA, its agents, servants or employees.

4.

THE DRAINAGE IMPACT ASSESSMENT PROCESS

4.1

The DIA process comprises two principal elements, a project profile and, if necessary, a DIA
study.

4.2

All development projects for Zonal or Regional Developments will require the preparation of a
Project Profile.
The project profile and DIA study require substantial engineering input and judgement, and
should be undertaken under the direction of a registered professional engineer in the Civil
Engineering discipline. Any submission made as part of the DIA process should be signed
and certified by the registered professional engineer in charge. Failure to submit a satisfactory
project profile or DIA study report, if required, may unnecessarily delay the DIA?? process.

4.3

Development projects within urban areas served by an engineered positive stormwater


drainage system will generally not require the DIA process to be completed as the project
profile should contain sufficient information for approval, the exception will be those
developments which are of sufficient scale to make a significant change to the drainage
characteristics of a stormwater drainage system.

4.4

In areas not served by an engineered positive stormwater drainage system, the scale of the
development, the form and location will determine the necessity of DIA process. As a general
rule, if the answer to any of the following questions is positive or unknown, DIA process shall
be applied to the project:
(a)

will a natural drainage path be affected by the development?

(b)

will there be a significant increase in impervious area and therefore a significant


increase in runoff from the development site?

(c)

will reclamation or filling be required to form the site for the development?

(d)

will the drainage system downstream of the development site require to be upgraded to
convey the runoff from the site?

(e)

will the development be situated at flood prone areas?

(D

will the development be situated in an area of high groundwater?

(g)

will the development have substantial area of planting which will require irrigation?

(h)

will irrigation cause a rise in groundwater levels that may cause concern for building
and road foundations?

Project Profile
4.5

An outline of the information required for the project profile is given in Appendix I. Based on
the information in the project profile, DA will decide upon the extent and scope of the DIA
study that is required by considering the likely impact of the proposed project on:

Volume 8 Developer's Guide

December 2006

Page 34 of 47

State of Qatar Public Works Authority


Drainage Affairs

(a)

the existing capacity of drainage paths;

(b)

the changes in surface runoff hydrographs and flood storage; and

(c)

the risk of flooding in other areas in the catchment.

(d)

the risk of rising groundwater levels due to development.

Drainage Impact Assessment Study


4.6

The scope and requirements of the DIA study shall be proposed by the developer for DA'S
agreement. In setting the parameters for the study, a conscious effort should be made to
constrain its scope as far as practicable while ensuring that the validity of the study is
maintained. The findings of the DIA study shall be documented in a report prepared by the
proponent for submission to DA and the Planning Department. An outline of the information
likely to be required for a DIA study report is given in Appendix II.

4.7

The DIA study shall be carried out in accordance with the standards set out in by DA Drainage
Manual.

4.8

The findings of the DIA study will be used as the basis for setting any requirements on
drainage provisions, flood mitigation measures and performance monitoring tasks which may
be placed on the project. DA will advise the Planning Department or Lands Department of
such requirements on the project as appropriate.

5.

DESIGN, IMPLEMENTATION AND MONITORING OF MITIGATION MEASURES

5.1

The developer shall be responsible for incorporating the drainage impact mitigation measures
into the design of the project to ensure that the expected drainage performance of the project
is achieved. The Authorized Person in charge of the project should state in writing that
necessary mitigation measures identified in the DIA study have been incorporated into the
plans.

5.2

The developer shall be responsible for implementing the drainage impact mitigation measures
and undertaking the monitoring programme during the construction stage to ensure
compliance with the conditions on drainage requirements, flood mitigation measures and
performance monitoring requirements as imposed by the DA.

5.3

DA shall recommend the Planning Department to issue a Certificate of Compliance for a


development only if the imposed conditions on drainage requirements and flood mitigation
measures have been fulfilled.

5.4

The developer shall sort out and agree with the maintenance parties on any requisite
monitoring programme during the operation stage. The responsibility for undertaking such
monitoring programme, if necessary, shall rest with the maintenance parties. Depending on
the nature and type of the drainage works, the maintenance parties may be the developer
himself, his agent, other person or DA.

Volume 8 Developer's Guide

December 2006

Page 35 of4?

State of Qatar Public Works Authority


Drainage Affairs

References

Qatar Sewerage and Drainage Design Manual


Volume 3 Surface and Groundwater Drainage

Qatar Highways Design Manual

Soakaways: BRE Digest 151

4.

Scope for Control of Urban Runoff: CIRAI Report 124 1992

5
6

Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004
Stormwater Best Management Practices in an Ultra-Urban Setting
US Department of Transport Federal Highway Administration

Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 :
DEFRAUK

Volume 8 Developer's Guide

December 2006

Page 36 of4?

State of Qatar Public Works Authority


Drainage Affairs

APPENDIX 51 INFORMATION REQUIRED FOR PROJECT PROFILE

In order that the need for a DIA study can be assessed, the project profile should include all relevant
information available. Information should be in note form. The checklist below is provided as a guide only,
to assist in identifying major items which should be included or considered in completing the project
profile.

1.

4.1.1.1

AN OUTLINE DESCRIPTION OF THE PROJECT

Provide the following information:

2.

Project title
Developer
Contact Person (name/telephone)
Nature and description of the project
Location (include plans)
Area of project site and % paved/unpaved
Finished site platform level
Whether planning permission application is required
Whether lease modification application is required
Statutory land use zoning
Recent and dated photographs to shown a panoramic view of the site

4.1.1.2

a)

AN OUTLINE OF THE PLANNING AND IMPLEMENTATION PROGRAMME

Explain how the project will be planned and implemented


e.g. authorized person/consultants/contractor.

b)

Identify the project timetable for:

c)

appointing consultants/authorized person


planning/preliminary designs
preparing a Drainage Impact Assessment (DIA) study (if required)
finalizing designs
implementation
completion/commencing operation
Identify any interactions with other projects which should be considered.

Volume 8 Developer's Guide

December 2006

Page 37 of 47

State of Qatar Public Works Authority


Drainage Affairs

3.

4.1.1.3

AN OUTLINE OF THE EXISTING DRAINAGE

Provide the following drainage details:

4.

A 1:20000 scale plan of the catchment in which the project site is located with the drainage
system relevant to the proposed project highlighted.
A detailed layout plan at 1:5000 scale or larger, of the project site with the site boundary,
existing ground levels, existing drainage and existing land uses all identified both within and
adjacent to the project site.
A general description of the existing drainage including adequacy of the drainage system
and flooding history.

OTHER INFORMATION

Provide the following information:

Potential drainage impacts (described in broad terms) arising from the project.
A general description of the proposed drainage impact mitigation measures (if any) to be
provided.
A general description of the proposed drainage system.
A general statement on the flooding situation upon completion of the project.

Any other available information relevant to Appendix II may also be submitted to facilitate DA in
deciding whether a DIA study is required. Submission of sufficient information under this
heading may enable DA to make an early decision on whether exemption from submission of a
DIA study can be granted.

Volume 8 Developer's Guide

December 2006

Page 38 of4?

State of Qatar Public Works Authority


Drainage Affairs

APPENDIX SII INFORMATION REQUIRED FOR DRAINAGE IMPACT ASSESSMENT STUDY


REPORT

In order that the DIA study can be completed as quickly as possible, the DIA study report should include
all relevant information available. In addition to the information submitted in the project profile (Appendix
I), the following information should be included in the report. The checklist below is provided as a guide
only, to assist in identifying major items which should be included or considered in completing the DIA
study.
The findings of the D1A study should be documented in a report prepared by the proponent which will then
be used as the basis for setting any requirements on drainage provisions, flood mitigation measures and
performance monitoring tasks which may be placed on the project.

1.

AN OUTLINE OF THE CURRENT FLOODING SUSCEPTIBILITY AND PROPOSED


DRAINAGE

Provide the following details:

2.

An assessment of the susceptibility of the project site to flooding, preferably with a


record of any past flooding which occurred within or adjacent to the project site.
An assessment of the groundwater levels within the project site and whether there is a
record of any previous problems within the site or adjacent to the project site.
A detailed layout plan, at an appropriate scale, of the project site with the site boundary,
proposed ground levels and proposed drainage, including any necessary upgrading
drainage work within the catchment, and proposed land uses, all identified. If the
proponent is aware that the ground levels or drainage or land uses adjacent to, but
outside the project site are likely to change, details should be provided if possible or,
alternatively, attention drawn to the fact that changes are likely.

AN OUTLINE OF THE CHANGES TO THE DRAINAGE CHARACTERISTICS AND


POTENTIAL DRAINAGE IMPACTS WHICH MIGHT ARISE FROM THE PROPOSED
PROJECT

Provide the following details to quantify the changes to the drainage characteristics of the
catchment arising from the proposed project:

Changes in land use and surface runoff characteristics.


Changes to existing groundwater levels that might be expected.
Changes to surface runoff hydrographs for 2, 10, 25 and 50 years return period flood

Volume 8 Developer's Guide

December 2006

Page 39 of4?

State of Qatar Public Works Authority


Drainage Affairs

events for the project site, any affected natural drainage paths or existing positive or
non positive drainage system.
Change in flood storage caused by the project.
Assessment of timing of peak runoff from project site relative to timing of catchment
peak runoff.
Hydraulic capacity of existing drainage upstream, within and downstream of project site
if applicable. This information will be made available by Drainage Affairs .
Hydraulic capacity of proposed drainage upstream, within and downstream of project
site. This will depend upon the drainage systems designed by the developer.
Changes in peak runoff, peak flood levels and/or peak velocities for 2, 10, 25 and 50
years return period flood events at critical locations.
Details of temporary drainage during construction including hydraulic capacities.

Provide details of all potential impacts which might arise as a result of changes to the
drainage characteristics caused by the proposed project and identify land users who might
be affected. Provide details of the impacts caused by the following:

Changes in flood levels, flood frequency and/or velocities.


Changes in timing and magnitude of runoff peaks.
Changes to maintenance requirements and access for maintenance.
Changes to the drainage paths and regime during construction and after completion of
the project.
Cumulative effects taking account of other concurrent developments in catchment.
Other relevant considerations.

The potential impact should be considered on upstream, downstream and adjacent land
users, and land uses should be identified (e.g. residential, commercial, institutional,
industrial, infrastructure, agricultural, recreational, conservation areas).

Volume 8 Developer's Guide

December 2006

Page 40 of4?

State of Qatar Public Works Authority


Drainage Affairs

Volume 8 Developer's Guide

December 2006

Page 41 of 47

State of Qatar Public Works Authority


Drainage Affairs

Appendix 1
Building Permit Application

Volume 8 Developer's Guide

December 2006

Page 42 of4?

State of Qatar Public Works Authority


Drainage Affairs

DOCUMENTS TO BE SUPPLIED TO DRAINAGE AFFAIRS FOR


BUILDING PERMIT APPLICATION
Mandatory information is shown in bold type
Information Required (2 copies)

Scale

Notes

Both copies of submission will be stamped approved by the Drainage Affairs. One copy will be returned to
the Developer, the other copy will be retained by the Drainage Affairs
Developer's Programme
Estimated Construction Start Date
Site Location Plan (A3)

1:5000

North sign, co-ordinates of


corners,
street
names,
principal landmarks

Drainage Services Location Plan (A3)

1:1000

Existing pUblic sewerage and


drainage services adjacent to
the Site to which the site will
discharge

A4 Single Property
A3 Developments (Compounds, Mult)
Site Plan (A) showing: (Foul Sewer)
All levels related to Qatar National Datum

1:1000, or

Site boundary

1:500, or

Building outline

1:200

Building with descriptive label


Manholes
MH1.

Internal Roads, Footpath

numbered

from

Internal Sewer Layout


Septic tank, soakaway, sewage holding tank
Diameter, length between
manholes,
gradient flow
direction. All levels are in 'm'
and Ref. To QNHD.

Drains and manholes


Schedules of foul manholes
Pumping Stations
Rising Mains
Existing sewers and drains
Road gullies/highway drains

Arch. Levels
levels.

Site levels

Site Plan (B) showing: (Surfacewater Sewer)


All levels related to Qatar National Datum
Site boundary

Volume 8 Developer's Guide

1:1000, or

December 2006

Page 43 of 47

and

QNHD

State of Qatar Public Works Authority


Drainage Affairs

Building with descriptive label

1:500, or

Internal Roads, Footpath

1:200

Manholes
MH1.

numbered

from

Internal Pipe Layout


Soakaway
Drains and manholes

Diameter, length between


manholes,
gradient flow
direction. All levels are in 'm'
and Ref. To QNHD.

Schedules of storm manholes


Pumping Stations
Rising Mains
Existing sewers and drains
Road gullies/highway drains

Arch. Levels
levels.

Site levels
Building Drainage (A1)

1:50

Floor plans
Fittings and Sanitary fittings
Pipeline details
Discharge points
Gullies
Copies of hydraulic design calculations (A4)
Foul water (including trade effluents)
Surface water (including impermeable area plan
and attenuation details)
Design parameters used
Pumping Stations information showing:
General arrangement details
Wet well capacity
Rising Main Capacity

Volume 8 Developer's Guide

December 2006

Page 44 of 47

and

QNHD

State of Qatar Public Works Authority


Drainage Affairs

Appendix 2
Design Unit Foul Flows

Volume 8 Developer's Guide

December 2006

Page 45 of4?

State of Qatar Public Works Authority


Drainage Affairs

Peak and Average Foul Flows Using Design Units Based on 270 IIh/d

Population

Avg Flow
lIs

Sewage
m3/d

Peak flow
lIs

0.003

0.259

1.64

0.016

1.382

2.53

10

0.031

2.678

2.82

15

0.047

4.061

3.09

20

0.063

5.443

3.35

25

0.078

6.739

3.51

30

0.094

8.122

3.62

40

0.125

10.8

3.83

50

0.156

13.478

4.03

60

0.188

16.243

4.22

70

0.219

18.922

4.41

80

0.250

21.6

4.59

90

0.281

24.278

4.74

100

0.313

27.043

4.86

Volume 8 Developer's Guide

December 2006

Page 46 of 47

State of Qatar Public Works Authority


Drainage Affairs

Appendix 3
Drawings

Drg No.

Title

DG1

Inspection Chambers - Typical Details Sheet 1

DG2

Inspection Chambers - Typical Details Sheet 2

DG3

MH1 - Standard Details

DG4

Typical Manhole Construction Details

DG5

Sewerage Connection to Properties - Typical Details

DG6

Typical Small Submersible Pumping Station

DG7

Sand Trap & Grease Trap - Typical Details

DG8

Septic Tank Type A&B

DG9

Septic Tank Type CDEF GA Details (pops 21 - 350)

DG10

Soakaway Details

DG 11

Stormwater Soakaway Details

DG12

Stormwater Tank

Volume 8 Developer's Guide

GA Details (pops 1- 20)

December 2006

Page4? of4?

1JQJTh
1. ALL DKN5IOItS All! It H1WHETRtS lJI,ESS DlHEftWISE STAna
2. TillS DRAM 10 BE A,f,D1H CIlNJWlCTlDltWlTKAU A[LEVA~U1AlIHllt
DnAl~S

3. STEP IRO~S 10 IE PROVIlED A' :JOOlIa cone BOTH tlORIlCMAu..,


Vl:RTKALLY I' DEP1HTO *VERT fXCUOS '110m

iPrtKfllEAMFORCOVERS

r------,
I
I
I

lX
I
I

:~

15tIH.mAROPE~llli

I
I _____ ...JI
L

PLAN ON COVER

r,t5t,..

...

'00

r'~~;~

r-Er--

~OJ

),'

-..

OJ

15IDIAEXTR4&1AfHGTH
VI1llIfID (LAY PFE

IE

r--E f--.
I--

-- 3=
-......,...
',::

i--- --1+-----1

.:~
;~';n

"

--

'--

';

'.~.,

:.;::

1f.'::

f--

,,:':-

.~

0"

r--J!!-

{)/

C!NtAIPAA1'ETOSLn

.
.:

....

I
I
L ____ ...J

JO'

'"

t~~
,:;..

..

.~;

."

SECTIONC)

SECTIONC)

CHAMBER TYPE'A'

CHAMBER TYPE 'B'

...

~L ' - Ii

rrr-- :--

c-~

'.~:~

Z[

.:.'";.:.

~
L
,0

':"'t~ 0,

r;
PlltlTl!~&IWl[SRt20

~DPC2IlMS1TUCOlKRm

I- _

GRNXOPC:tOHASS
COJjCIl1EWALLU.ut:---

","'HE_I<

't:':

" j,;~~

1-'-'

HORTAIlIWJ[Kf!TOrltAtR
J.AEGUl.AlNliCOlml5

e-~

-,

~ ~~~Rl~~tEoreETE
SU1 twfIOl.E fUME OPE"G SIZE

P.O, 60)(23337
TEL. 4950055
FAX. 4950555

-,

w: CotmE ILOClt'lilDRIC WAlLS

lIIlADE SRI: 20

..

",. . . . .

~~

PROTECTlOt(&RAOESRt211

1JQJTh
MA5s(QNCAETE8A5E

t rtPr: 'A' AllWmM[Nl YO DE IIUD rOil V," Til' Ifa,.IlRAIKtl

~,L

UTHKBL

llIWlI!:sRI::n

GRADESIIC20
COlltJllElKNCIlttG

0
o\~~

COlINEnlO1tI TOEAl':HLOMISGE OF OlAMIlER

J,ClASS DlIOHHCOVlR4'lWI! TO III; I15mlNTIlAfPl:KlD


.POS5aE It:AVY LlIADEDARUs. OTktRWlSEUASS
BUS C!M:R FRAtE TO 8 USlO

TITlE

~EIIl(20WESl.AB

INSPECTION CHAMBER
TYPICAL DETAILS
SHEETI

.J"',,,."......
1t.AB000DCSRCD

eatllt1llll1!: TO L\CH LOIrlG alE lFCHiMBrR

2. TYPE'8'ARRAIIG"'~Tl08EUSEOFDRJTOlIRANCH

DEVELOPERS GUIDE

umocMaRrARAEtfIlERII6

bll!

CQNCRETEeENCHIIIG

CHAMBER TYPE 'A' (TYPE 'B' SIMilAR)

DRAINAGE AFFAIRS

200 MC!HkALTlllClOE!S

alHrC~HDRTARRE!IJ(RIIG

SECTlONC9

DRAWN

SECTION@

D~

DWM

CHAMBER TYPE '('

. . . . . . . . . . . . ._

...... -'.

DII'T

PROJECT CODE

NOV. 08

CHECKED

NOV. D6

PROJECT NO.

APPROVED

JEA
SCAl (Al)
1:70

a .._ _

DA'T

PROJECT

!"'ERNALBl.OCKWOllICfAaTOtlAVt

SUIGIl4DESRtJ'

BY

EH12'a.WA15DlHAlOlllE

105ll11UtCLLEAROPNk'&

HAYUlIIOCHlRTAlIl[IODtfUi

!l.L

""",.".

15TKICILH

AMEI<D~ENTS

REV.
CONSULTANTS

DRAWING STATUS

llRADESRC:lO

,:<:;:-~~=r~lr:~OW
..
liIWlE lAC 21 CONCRETE

SECTIONC9

1"---

----

-- 3=

--+

I
IE

J~':'-'

e-~:

IE

f--

W1TNSEALINGPl.Al[

:r.....i ;
.,

1M

CClYEA l FIWE TO sur

'"

."

t...

IE

--

e:,

STIl'IllOIt5-

'DSl.lTAkDfACII~tcN[(TIONBUlLTIMEXTEkDEDfjUlUla.

UI .. mCllARCPfttNIlo

--+ f - ::....-: ~!
-

~:~\ \-

".:.,~

l.FllRAllDIlIOkALLAlE!lAlCONIICTNI!OICt!flGSKALLIlfMllDfIED

I
I

PLAN ON COVER

~M

~'~~:~~\~

I
I

PLAN ON COVER

1M

5.HIJItU1(OWR 10Pll'[ Dl'IMSPftlaN [IIMIUTo BE.OOIIIl

r-----,

I
I
I
I
I
I
I
I
I
I
IL _____u_ _ _ _ _ ...JI

COVDIIrFRAMETOSUlT

I
I

'"~

'.ALllmAIlAt.N!OOOERIlAlFACESOfTtECtW1BERSTOftPAMED
WITtilWOClIATS0' CaAL l.utEPOX'i

r-----n-f-----,

NOV. D6

DRAWING NO.

DGI

REVISION

lJQill;
t.ILL OilOSlOI(S AAE III )tWMEJR[S UlUSSOTHERWlSE SlAT!D

ill
.r-:1

Z. fXTDlHAL rAuS or OtAtelR TO R.,AMm wnHTWD (001115 II'

BI'MINOU5PAllfT

~~~,\':'
..OHf:tvID~lf AIm
. QultEHEICIS

NII.0IBHAMH

J.lJfIEIlNAl. StIRfAas 1IF [HANSER WALL AII (OYER lOBE pAMED WRH
lWOCllATSOFUW.1AREPOXYPAlIf'r

"

~l15D~

THlSDfTAillSfImSPIm.

),311101-'
14

SO(l(ElPllS.FCItPPES

WITH tOLLARS Sf DETALJ

~
tT17It.ftI:

&-

&-

---.J

"

bIoTUG3-15

---.J

"

REINFOR[EMENT

TO"".....AS~~ttll:"LO' ..,..""
't'tP! (If SlUl.

WTREnF BARS
BARHARK

BARtLlMETE
.c.1U05
11

BAR LOCATIONS

T TOft

'M

III

1",1

'D1'DlA

3DO

1610

DETAIL

'02'01'\

TYPICAL SECTION ON BASE

Ff

fAIIFACf

880TTllH
U EACHfACE
'" NEAR FAa:
EW UCIlWAY
An ALrERlCATlY!!,lRSIIMRSEII."SIlDWWHERERE4UlREDI

E9

PLAN ON COVER SLAB REINFORCEMENT


IMINIMUM COVER TO REINFORCEMENT 10m.1

IFOR PIPES WITH COLLARS)

DUCTllEIIlOltMA!ItIl[COYERI.FRAME

lDSUlT'1SDIACLEAROPEItIltG

-~

BEIlIlCllOH""r""'' ' '

,0.

'nn;~

lI-uAlil ~

.!l.

["r""""'''''''COVIR
.
.
\ ~l
"

., ".

mL-

~.7

L=.

I "Il,--..........
~r~"iiiE~~~"~'

(DkCRnEBACKFllL
AS SPOOFED

19

.p'"

-Sl

""BfA
[OVER sua

iiiOLi""

T5THlDCCOMCRll[

BUIlDlIlU!UDE IRC: n

HASSCCWCRETEat:NOlItl6
GRAIlESIlI:JOWlTK121tllCIC

EPOJIYMllRTARREIlIlI:lIItG

!ill!!.!l.AII_

"'D.

SECTIONC)

SECTlONC9

(SHGWlNG COVER FLUSH WITH FGL OETAILI

IIHDWING RAISED COVER DETAIU

'AR

"""
;;

StZl!
TU
TU

!!
.!!.

TU
TU

..

AMENDI,IENTS

REV.

,m
'"

IF

,
1

,,

112
TU
T12

...
'"...

"

t"

Z'lS

1
,

"a
"
"
a

DRAWING STAT\JS

.!!.

5P!CftD 10 TtR t4Af1UT_

., D.

SPI!(flEDTDTHEII"WSY2SlI11

mIKI&!WIll

Dl

tRAlRD COWRDnU TOil[ 115tO IN utflAyn ORlHttsH!D


=~Ji::=DETA" UBEUSWINAU.PAVEDOR

DRAINAGE AFFAIRS

2. nus '0' caYERS "AVY DUTYI TO BE UWI FOR ALL IlCSl'mlOk


CHAIeERIIN ~DAns OR ounrlTH PROPtIlTY aautl)ARYWAUS

P.O. BOX23337
TEL. 04950055
FAX. 04950555

a.AsS'I'CClV'ERSlM!IllLtfDl1JYJlOeEUSEDltAU.CASai\lftTHIk

p.etaPERTVIICll/IIIA1tYWALLS'DABOTKRAlSEDAliDFlUSHDETAILS

PROJECT

tlTtlUCSIllDCONCRflEBLOCKWOIIIl
liAADElPCJ5SEDPEDIlt6TIICI(

""'"'-\""

~~

_.._-~

....

50lP CetMTE N1ROl.tCl


CiWlESRCHTOCGVfRWITH
~DS[AARl5tS

PRlWTcaYCRHAIIQRADEOPC]5

.~.

' 'D

SEWERAGE
STANDARD DETAILS
TITLE

TWOCOATRENtD

.1=
DETAIL

CAD A'h I.:\O'TAR~STDS\OO2.d'Ng

"r

INSPECTION CHAMBER
TYPICAL DETAILS
SHEET2
DRAWN

D~

E9

DATE

Ju.8ElQINIiDINENSlllItSAAEICACCOADAlCEWlTHB~UI

INSPECTION CHAMBER CLASSIFICATION

'"

CONSULT,6NTS

MlIIls

!! - -1'I
.!!
~
~
T1Z I-f--I-"
OT

D1

Dh~

SECTIONIt\

~MASstotomGll:lDESRtJO

..
.,
. "__'_,,-~~~h':.

S!.A1tGRAD! llPOS

r-II - I

{]~I

-=r.;

CHECJ<ED
DWM

PROJECT' CODE

NOV. G6

I NOV. D6

PROJECT 1\10.

AFPRDVED

J....

I NOV. 06

SCAlE (Al}

1:20. h10

DRAWING NO.

DG2

IREviSlON

!!Qmi
1. A~L QlH!M5l11NSARE IN I'tl.LtETRES UHLUS OUER\tI5! STATED
2.Al.L COtKRE1E SHALL IE GlW)E OPC 21 t$,ESS GlIQWlSf STATED

lYAAlA1lIl!lTOSTAl/DARODElALSAllEPEIUtT1EDTDHET$l'T!SPfClPlC
RUlUlJlDQTS
4. ALL .'S 8ETWfDt SEnlON$ Of GR1' LKWS SHlU BE LAHftAUD DYER
WITH 101... WIlE RE5tI R!H &LASS TAPE aRAM APPRO'40IlSlTU
BAlI)lGEJatn101HEOUtsIDO'1tf:IIPLlkERPIllOR10(OIKR1I~

S"A&.lJQteTSBElWEEMPlPES,fIlCtURESl/IIGRPlJfER5SH1oU.I!sw.m
,. AU JOItTSBtTWEEN PIPES AIeD ClIMtllfTE SHALL lIE WATEnlll11
1.ALLltll:otIIIGPFES5HAl.LIELAlDSDffITTOSOfFn~ITtiTHEOlITGOIItG

'PI

--E!1

;l

2H

MANHOLE DETAILS

j
PLAN AT COVER LEVEL
SECTIONC)

CLASS DUO TO EM U4 t1EAVY OUTY

GRPSEALN3Pl.ATE

DOUIU!1RlANGllARIIlICTJLElRdtCQ'RR
&.fRAMEWITH'lSDlACLEARllPfNIcli

AMENDMENTS

REV.

BY

I DATE

CONSULTANTS

~I~
~I
DRAWING STATUS

~ ~~'V:toWRETE

TAltGNlIltlRANt&PflDTtnICN

e-..,.. . .

-,

II~

DRAINAGE AFFAIRS

GAPLlItNlTOllEPCllNUIIMRT

H1k6'rtf(NOIISLPSlA'ACE

P.O. BOX23337
TEL. 4950065
FAX. ...50555

IiiRl'LHHG10IlElHIN1I&!MVERT
MlN.6THCNllIISLPS\lFA,Cl

PROJECI

DEVELOPERS GUIDE
TITLE

:P=z

:m~~Rm

rOUL SEWER t.4Hl


STANDARD DETAILS

DRAWN

DATE

OM

SECTIONC)

I PROJECI CODE

NOV. 06

CHECKED

DWM

NOV. 06

I PROJECT NO.

APPROVED

JEA

l2Ve~~Y(~rsl~nr
CAD Rd. IJ\ClATAR-SiDS\0G3.dw9

NOV. 06

SCALE (AI)
1120

DRAWING NO..

D03

REVISION

!l!!lli;
lALLDltNSIONSARflNtlUlKETRfSUNlfSSOTHRWISESTATED
2.THlSORA\iWGTOSHOULDBEIlf:ADlNCONJUNCTIONWlTHDET.&I.SSHllWN
ON DRGNoLfS\fS2.fSJ"FSnl. FSZ4
3. All HATfJlIA1.S, FABRICATION AN:l CONSTflUCTlDN SHAll BE IN
ACCOROAN:EWITHTHESPttfICATlOHS

4. VAIllATIIN TO STAHOARD IlTAIlS ARE PEAturrm TO HEEl SITE SPECIFIC


RroUIREtlENTS

RESIMSPACEJl:TOSlJIT
lADDfRAl.IGNI'EHT

IHAJC.l00THIClO

STAlfrl.ESSSTEEL ANOJJR
BOLT BoTTCH FlXWG TO BE
MAXlHUKOFnSABDYE
BENCHING DR RfST PlATFOIltl
FlXlNGS TO SE AT 1500
CENTRESHAXt1tJH

TWO LAYERS Of WATERPROOf


I1Et1BRAHEITANKHD

S.FORTAItQNGDETAIlSREFERToDAGNil.GEU
Ii1lPSTRIUR

BDnDH RUNG TOef


HAlCIKlttOFZ50
ABDVfBflOllNGoR
RESTPLATfDlll1

GAADEDPClSRElNfORCfD
D:lN:FtTE COVER SLAB

DETAIL

'.'0

DETAIL

1,10

TANKING AT GROUND LEVEL

C9

DETAIL

'110

TANKING AT INTERNAL CORNER

TANKING AT EXTERNAL CORtiR

DETAIL

1110

E9

DETAIL

1,10

TANKING AT FORMATION LEVEL

E9

LADPER ARRANGEMENT (8QTTOM!

WHERE APPLICABLE
WHERE APPLICABLE

~
GRPLKll
JOtlTB(TWUNGAPllNERl.
PIPfTDBEllUlllATWOVER
WfTH RESIN RICH liUSS TAP'

ROCKfR PIPE. Sl'Il.iOTI


SOCKET ON UPSTREAH SlOE
OF IWfIOLE " DOUBlE
SPIGOT ON.OOWHSTREAH StoE

SECTIONC9

SECTlONE9
BY

AMENDMENTS

REV.

DETAIL
1.10

OATE

CONSULTANTS

LADDER ARRANGEMENT !TOP! & HANDHOLO

'c.J.

L!J

1..01

...

..

BEDDlllIiKATERlAl.AS

"'["'

DRAWING SfATUS

EADllIlIIiil1ADEUPFRoH
4No.SEGtlENTST5TIAOC

DETAIL

DETAIL

C)
~I

vr PIPE (ONNECTION DETAILS

GRP PIPE COhlCnON DETAILS

DRAINAGE: AFFAIRS
P.O. BOX 23337
TEL 4950066
FAX. 4950665
PROJECT

DEVELOPERS GUIDE

DETAIL OF PRECAST CONCRETE


SEATING RING UNDER MANHOLE COVER
IGRADE OPC 35 CONCRETE)
SCALE 1:10

TITLE

WATERl'ADllftmlBRANE
COllAR IIlH.)OO WIlE

WATfRPROOFHEH!IRAHE'
COLLAR "If.3DO WIOE

TYPICAL MANHOLE
CONSTRUCTION DETAILS

4DI4IBlTUtIIIOUS
HASTlCAUET

STAItClITWATRPROOfKEHBRAI

STARCUTWItoTERPROOFI1EttIIRAN
WORKED ARllUPIJ PPf I UPPED

DETAIL
1,10

C)

WO.""'"

.!!l!!ll

PI'EJlIINTIS NOT SliOWN


AN D.EVATIOH HR a.ARITY

DETAIL

1110

c:

TANKING SEAL AT PIPE EHTRY

TANKING SEAL AT PIPE ENTRY

.u...LIlJ..fJW

.EWilUII!fli

WDIlKe:PAltOUNDI'lPt:.UpptD
WlntCOlUA

DRAWN
OM

OATE

CHECKED

OW"

NOV. 06

Itt"

L:\OATAR-STDS\DG4.dwg

PROJECT NO.

APPROVED

JfA

NOV. 06

SCALE (All
1:20 &: 1:10
(AD

I PROJECT CODE

NOV.06

DRAWING NO.

DG4

IREVISION

1lQill,
1. ALI. DlM!t(SIO/fS ARl! IN InUMETltES UN.ESS OTIAWlSE: 11.1ID
2.111$ DRAWffG TO IEIllADfI H'ULIICTIDNWllttDRG Nu.FSlItfSt1

Sl.EEVEADAPllA

~I----'oo'1~"
,r
--.JL

CONNECTION OF EXISTING TO NEW


DRAINAGE PIPEWORK
N.T.S.

fA.

fl.

'.1:; ;~.

'.

II~

:' ..

=
INSPECTION CHAMBER

LATtIlAlCOIIIIEl:TIOII
lDKAlItRWfR
(SUDR&Mo.FS11l

ISEE ORG No. FS81

I'

BY

AMEI<DMENTS

REV.

I DATE

CONSULTANTS

PLUG
TEEORlIBLIGl.f;U

Afttmllwrntll[!I)

Sl.nYfJlIllIT

DRAWlNG stATUs
.GL

r:.lt:-;~

"._~':

INSPECTION CHAMBER
(SEE ORG No. FS8)

LAuaAL CONHR11l11l
Til HAlM$fW[fl

-=-r=ii~~~

....

DRAINAGE AFFAIRS
P.O. BOX 23337
TB.. 4950055
fAX. 4950556
PROJECT

DEVELOPERS GUIDE

TITLE

TYPICAL CONNECTIONS TO EXISTING PROPERTY


DRAINAGE REQUIRING EXTERNAL INSPECTION CHAMBER

SEWERAGE CONNECTIONS TO PROPERTIES

TYPICAL DETAILS

-DATE

DRAWN
OU

I PRllJEDT CODE

NDV.D6

CHECKED

DWM

NOV.D6

rPRdJEcr NO.

APPROVED

NOV. DB

JEA
SCALE

1
1:20

"tl[fR.'1 Ll\G'TAR-srDS\D05.dwg

DRAWING NO.

DG5

REViSION

.!!Qilli

tA.U IlKHSIlINS ARE IItHlLUE1IIS lII.m OTHA\III5! S1.um

2.ALLLEYllSAREIk~lRESTDQATARHAT101tAl.HElGIlTDi\lIl4

1 ALL A[lIrfORtEII CDNUlm TOfI!0PC]5

150

Qiiiii

JOO.

'00

...

."

51" OVElWL SlJIUCTUAAL COIrICRETE

""

~"I

4.ALLPIPEWORKtS DLIC1ILE lRCft OR STAH.!SS IUU mADE 3M


lII.!5SlIClKAlEOOTII:RWIi!

,.

""

S-DltfNSlll!t5lLYD.S NlCATEII ARt: FllAUUl1RA1M


PURPDS6OM.T

DAVlTSlKKET
DAVITFOIIlATlON

LEGEND,

lOO.t,OO.ttlIDEEP

P!tISIDROADUW.

fRC

EXTRAtTFAHIaPTlOICALTOOIXIURUlllTI

111 TO 10 llA AlMER

Fc-i

!!~~~~~~~WIT.~
~l~:r"TJ.~m:MH'O'

100lASItllRTRADllS

l~~Aftl~~~":\~------I-iH-

nEAIl OPUIIIIi ClltPLUE ImH


PAClOCK .. ""SP

~
_

1I9DIUALOCOUPI.Ni

XI

~IiEDEDGE$

Flte5HED GllOUHD UVEL

PlPES\lWORTSTO

UfM:EIlSAP!'ROVA~-""::::::::::t::::::-IK~~".~$:jjI/!=*",~~

0.. . . ~~~~~"'l,mI!iiliit'idll=!~$~j';.1i~

~I ii

--..J

TO
D1iCHARGE!'WfHOLE-t

SCREEDTIICXIPS

+ST50
IV

GAlP.:YALVE

f.

F1.AA'GADAPTER

'RY

,,*,"RETIMYAl.YE

j
~

=aa~T~;ll~t~

AcassLAIIllA

PLAN AT GROUND FLOOR SLAB

SID.51 iSI
DEEPSUHP

SECTIONE9

AMENDMOOS

REV.

BY

CONSULTANTS

,.

e-

~H'J=&7i'!

-,

DRAWiNG STA1US

WATERPROOFTAIlIOIIG
8OTIOHQFAllOORAC1PI'E

SPIIIDlE UPOllT WooT


~HIfG

~ilf.1It wn wr:L~ TOIlf GAP


A.u.INTEIlNALCONCRtTE

!i.t/iIlfoW/.umtL"

-,

DRAINAGE AFFAIRS
P.o. BOX 23337
TEL. <49500/15
FAX. _

2MDlAVCSEWR

~ 1:-:;""'''')[

I~jo<. I

SECTIONC9

IOTIICTAlfCNlHEMBltAII:

IJECT

OPCIOPROTECTIONSCFlfD

?.TII(IflC2IBLIN_
I

DEVELOPERS GUIDE

'WATER PROllf TJdIICM


2DtllACASTlllGlCPEkSTOCK

SECTIONE0

lITLE

TYPICAL SMALL SUBMERSIBLE


PUMPING STATION
NOTE,1.'tHEPUHPCON1ROLPAIIELlSAJlPRDX.IOI.'l'Hxlto

TttELEYE.LCOffTROLPAtm.ISAl'PRGX.1111l7Ol1'fO

2. CELL TYPE OEOllORl2ER WITH IIfTflilW. FAN NAY BE PROVIlEDTO

MAINTAIN 1UIt CHAIl6ESPERHOllRIIt TtlE WEt ~m

DATE

DRAWN

OM

OWM

NOlI. 06

APPROVED

JFA

NOV. 06

SCALE (AI)

1:50
Ci.D Rtf> 1.::\ctTAR:':-srDS\OOe.d*V

I PROJECT CODE

NOV. 06

cHECKED

PROJECT NO.

DATE

1!2.lli!

CLASSSt25CGY(R&FRAMETO---

surr,oa.taOCUAROPEHlN6

I
:
ml

!!I'

tAU ElHEkSlDNS All( lie MUtlETAES KESS OTIERW\SE nAnD

z. ALL Jatmi IETWEEN PIPlWORIC Mf) (DNCAEn ARE TO BE WATERTIGIIT

'"~

LTRAYflWlslt4S1l_50dALutlIItaA'tAIlllL[

FGlPA~"REA

4, tflL PAlIELS 10TRAY fRNES fRaH dlill A1.LNl~M

s.~::.m6RP~MS~::La..~~:r'J.V&lHGAIlOCASTlNSrTU.

AllOOERHALfA(ESTO!ElAtm

~\:l~t/NrTOlKGRP'-_--~:tiii--0o1'"i1l

f~--:----------l
I
I
I
I
L._

~,

7-

I
J

:iI, '~ I

:=:~:.::..

.JI

I.ALLCCfrt(RnE lOBE C1.ASSEI UHLEl$01tRWI5t SlATED

~I

.' ,

"t" .1,..~

~.

7.fDIITAIIIlIt4GDElAUREFERTDDR&Nll.F14

~t

LEGEND,

Q,ASS ItUS(D't'ER & FAAtt:: 10


S\IT 79 x60D tuAA lPfh1i

FGL

ROOF PLAN

F1JISH!OGRllUN9LML

15'

II--J!.

SECTIONE9
II

"'' -..

:.~,

..--.: . . ~~::"'::~ ;.

,-

;~:!
,:',-1

i'.-

:::," ':~:'J:.::'
I
I.;; ',?

I
-

/J~:L

E1-~~F-

:'".

....

:~:.;......

i;I1::~/'

.
8

'fIftllOO

II!

.. ....-_.;.J

ti+-

-l-_

.:.

il

'"

""I~';,:~
1''''~''''''_

'I - - - II

f-:~:-:"1.lI-';"'~'-:-1,', -----r--n

.I

--,

:"':I~

/: ;~'I; :.;

'II

AJ9'MlIH'''H5IIOVIR

~J!
Y

51.

~'it~lll:OlIIlSE

\;:,:::(/.;

"12

fQLPA'SPAIIEA

-- -_:

---

.. 1

....

"/.'(

R!.V.

AMENDMENTS

TAItKNi TO AlJ, COIKRU SURFACES

~W~~

CDIRTECLAss'C'

5[llf:m1O~9TtlK

DRAWING STATUS

SECTlONC9

"'.

,.. I.!"

...

""

DATE

frf

CONSULTANTS

DRAINAGE AFFAIRS
p,o, eOX23337

TEL, 495D055

;fJRPLADDtRIOLTr:D

FAX. 4950556

PRo.JEcr

,~,,~

1t1\
Iv

~":1~

15fDlAllUTfIPE

"

II
DETAIL

'

I'

,",=I-:-=:J--;-1--'
~I

1SDtlAaunnPPE

SECTIONE9

SAND TRAP
(LARGEI

C)

DETAIL

"',

>~',' ~; ~ ;':,,',:"

ul".fI5SUHP

(AD bl, I.l\OA.TAR-STDS\OO7.-11tg

I :.~

",!
:; "

L-j'~i ;.:~ ~ ':


:: ~ .. '.:"

~t .li:t1":;1

~I ii!....J

prl!fQ!lATfpgRugTBAY
TAAnrpyfAMK6lrQ IH 4J!IH!tIft.tl

E9 ;r

.Il.IIllli.IlIl

[tJ .[[J
PLAN

PLAN

GREASE TRAP

DEVELOPERS GUIDE
TITLE

SAND TRAP Ie GREASE TRAP

DRAWN

OM

CHECKED

'1 DATE
NOV. DB

PROJECT CODE

D6

PRo.iECT--NO.

APPROVED
JEA
I NOV. OB
SCoIL (AI)
1:20 at 1:2

DRAWING NO.

DWM

I NOV.

DG7

IREVISION

1!!!I;
1. All DIMENSIONS ARE IN HILLIHETRES UNLESS OTHERWISE
STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1(OAT OF
BITUMINOUS EMULSION AN[) 2 (OATS OF BITUMINOUS PAINT
1 All FITTINGS TO 8E STAINLESS STEEL

4. FOR REINFORCEMENT DETAilS REFER TO ORG No. FS25

~b~rz~~f;lN iO~EcJfm~ Y I lOO I


',4._

4.

"'"

.~
"'" I ~I

'I

1350

1185

I,
'1

,'"'.1I

'I

I.:
I.

I
I
I
I
I

-$$=t==-~t
~...

r-----------

----l
I
I

1
1
':JI
-~

I~

L_

L_____________ _

I
I
I
I
I

;!'

DOUBLE T'
GRADE'
COVER.
675DIA

SECTION A-A

MDUTY
LE

PLAN AT COVER LEVEL

REV.

T12@l

15

0,

~~I~!W6m ~e~IiRETE GRADE ope lO

;iSl

I /'

"

N'

>:
0

'r,~,

BY I DATE

AMENDMENTS

CONSULTANTS

"1

T12@l1501\

~, ~

fA

DRAWING STATUS

T16@l150~

~T16@l150

T16@l150

DRAINAGE AFFAIRS
P.O. BOX 23337

~~.

~.

FALL

" , < :;:: ::::::: if::::::::; ;;


T16@l15

!WL

TEL 4950055

FAX. 4950555

PROJECT

(ON(RETE BLINDING LAYER

T16@l15O

SEWERAGE
STANDARD DETAILS

JY
ml

SECTION C-C

SECTION B-B

SEPTIC TANK lYPE A a: B


GENERAL ARRANGEMENT AND
REINFORCEMENT DETAILS

TANK DIMENSIONS
LENGTH (L)
(INSIDE)

WIDTH (WI
(lNSIDEI

BASE THICKNESS
H

WALL T~I(KNESS

DIM X

nOlO

lOOO

1000

l50

l50

150

1no 20

4000

1300

l50

l50

200

TYPE

PERSONS
SERVED

'DRAWN

DAlE

JM
CHECKED

JAN. 14

RK

JAN. 14

PROJECT CODE

PROJECT NO.

APPROVED
SN

SCAlE (AI)
1:25
".DRtf: L:\QTOOl29\OGB.GA &: RC.aw,

JAN. H

DRAWING NO.

DC8

IREVISION

./QlliJ
1. ALL Qn'lENSIONS ARE IN MILllf1ETRES UNLESS OTHERWISE

STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1COAT OF
BITUMINOUS EMULSION AND 2 COATS OF BITUMINOUS PAINT

150 DlA PIPE TO SOA~


OR BOREHOLE

STEP IRONS AT 300 CENTRES


HORIZONTALLY & VERTIC AllY

.:

S. FOR REINFORCEHENT OET AilS REFER TO QRG NG. FS2fi

'W'

.'';'

I
If----::l

-tf;! /=:$...

'.

0'

;",'

0'

"

r-

PERSONS
SERVED

lENGTH III
(INSIDE)

WIDTHIWI
(lNSIDEI

BASE THICKNESS
H

WAll THICKNESS
T

21 TO 40

4150

1600

500

400

300

41 TO 80

6000

2000

600

450

345

81 TO 100

6500

2150

600

500

375

101 TO 3S0

9150

2500

600

600

650

DIM X

REINFORCED CONCRETE GRADE OPC 30


SUSprNDED SLAB
./

:=

T12@11S~

l-

"r-

REINFORCED CONe.
GRADE OPC 30 IN _
WAll & BASE SLAB

kR

~o:;
:>:

JB

--!-

/ ' f-

116@1~~
116@115

I
!"-

I-

bI'-'

b-

T20@llS<l'

6 x 200 STAINLESS
STEEL SCUM BOARO

116@11

&-

lJ...-DETAI 1

/---f46@11S0

0
0
N

0
116@11 0

~T20~

If"'

.'I .

P.O. BOX 23337


FAX. 4950555

TEL 4950055

K' '-.
.'

-.

. ' '"

Ix

I-s

SEWERAGE
STANDARD DETAILS

.~".

".
11TLE

..

~j'"

PROJECT

".

FAll

4'". ~~.

II

SEPTIC TANK TYPE C. D. E t F


GENERAL ARRANGEMENT AND
REINFORCEIAENT DETAILS

T20@l1So-"
300

SECTION B-B

DRAINAGE AFFAIRS

.',dj.

'.

011

m@lll

.'.

'.

L1<o

II
(ONCREl
BLINDING lA

r- ~O@l150 STEEL
ANGLE
75'15STAI;~

..

..

lO THICK MORTAR No.2--

W~

I-

T20@l151\-..-I'116@115

PRECAST CONCRET
GRADE 5RC 30 WEIR

HIGHEST SEWAGE lEYfl

SCREED TO FAll
MIN. 25 THICK

150' '50 TEE

DRAWING STATUS

SCALE 1:2

I-

SECTION C-C

DRAWN

J"

DATE

SCALE 1:10

RK

JAN. 14

..,. ..

~.~

PROJECT NO.

APPROVED

SN

JAN. 14-

SCAlE (AI)
1:25.1:10 AI: 1:2

PROJECT CODE

JAN. 14

CHECKED

DETAIL 1
,.... ". ,.\ ..............."\""'0,.'"

DATE

150

DET AIL OF PRECAST WEIR

"-

BY

AMENDMENTS

REV.
CONSULTANTS

rA
--1-1

PLAN AT COVER LEVEL

;<

I
I

OOUBl TRIANGULAR MEDIUM DUTY


GRADE 'B' (ClASS 21 MANHOLE
COVER AND FRAME TO SUIT
615 DlA CLEAR OPENING

TYPE

T12~1

I~

1..:: _ _ _

I
I
L_ f-----------------------~

SECTION A-A
TANK DIMENSIONS

lL

0-

:".-

i~

l_~~J

.''':

I~I
I
I

- ~-

1000

,------------------------,

0.

AS

INLET PIPEWORK

0-

1'1 ".

.I, ";,'

1<.

4. THE TOP lEVEL OF THE SCUM BOARD TO BE SDmm ABOVE


ttGHES1UWAGfLEY(l

C1

...

..

3. All fITTINGS TO BE S1AINlESS STEEL

DRAWING NO.

DG9

rEVISION

mill;
DlAVARlES

__ L_
".'

//"

IlUHlESSOtTAlILDlDltfRWlS!.Au.IIf-Sl1VCDNC:RETESHAlLlEGRADl
aPCIOAIOAllPIlECASTCDNCRETESHAllSEG!WlCPC

~\
I
\
I

I
---{

L--J

/"-.....

mIOOB

. I

una

bl All lPO'tllHAl SURFAtESD[Ct:PT EPOXY MORTAR COYUtlDSUllfA.CES


ARf TO Be (OAUa WITH Gilt COAT If IlCIut'lHOUli EKI.lSIOItNfJ TWO
CGATSDPSlTIJMtNPAlIfT

~I

\11

lAOH STEPS TO !S 12'H SPACED AT lGl


CENTERS HlIIaDllTALLV A/to YfRTlCAllV

"'.UDB

II

'., I

'"

... .....,,,

-.J

II'o/f

V Ar-+-f'--l'- "~1'"
I

!iI.f
fltlClMntT

T
flfXlBlfJoftT

VPTOJlO

'DDHAXftUM

300-"10

~DHAXJMuH

OvtR,"

6tD HAXHlK

SIOKAXr.llHfRDH

.'os,_

m1008

"

....... _

~
I

-1--

,'"

"

"~I'"

PLAN OF SOAKAWAY ARRANGEMENT

PLAN AT ROOF LEVEL

-'1- I

no-tloe
I

PLAN

P~::~f::~:'~"

=,

I
:r:1

1tOHCIIUPROTEtTIOH
II AIlHlilf LAYER (If TANdili III ACCORDAIICE WITH SP!CAlIONCLAUlE'
2H1" SHALL ~E APPlED TO AlL EXTRICAL MFAtES

8UILDIMG Tt\lIt'J&l$TlluCTURtS

_..L

.\

>'

"~UDB

.... " ,

_r~:=1--L_
---+~--I

\ AU DtlEMAlllS ARllltHUtRTRES I'UIS OTtRWISf: STATED


2.COHCRETE

"

~~-::d3t:~_--

.VSPACm

""

SSTA6f&AEO

-+-

L-!"l

ii I .

"

II

SECTIONC)

R<V. I

BY I DATE

AMENDMENTS

CONSULTN-rrS

SECTION ON CHAMBER RING

COVER SLAB FOR SOAKAWAY CHAMBER

675111500UBLEITRlAMGULAAOUCTL!
IlOHCOVEAI.RUJt;W'rTH''lSDIA
Q.EARqI'ENM

COIICIlETEttAIIIOilillADE511C2I
\11IlHBlTUHEHPA'tTFN5tI

DRAWiNG srATUS

1TDlClIJRSESOf PRECAST CClHrRf:TE


lSAClOlBAltKSIIICLAlS1KORTAII

lilWESIlC)6PRECAST
COltCRET'fCoYEIlS1AII

.TEllRA!ltfDLtIEDOVEIlTITOP
OFCRUSttEDSrtNS~

DRAINAGE AFFAIRS
P.O. BOX 23337
m.4950056
FAA._
PROJECT

J...I

...::........:J:~~yc:f:!UCtlAHBfR
o

n.....a

.!.~~~~=.~.n~.r:~~~_"!!'.

DEVELOPERS GUIDE

I II

Cl

1II

..... 1

I TITLE

SOAKAWAY DETAILS
CAIISHlDSTDII:SlIlRDllG'7!ruI
SlkWSlUWlTHlllTLEllUlOflNES

~I

a/:;J~(;;'ili*';M$i{'~

;!'-w
:J;iW
j!:!1

til

~;
~

GAADEIIl(JlCOltWTIJ,AH
BI.OtDlIIGCDIlCIlETE

DRAWN

OM

DATE

PROJECT CODE

NOY. 06

CHECKED

OWM

STANDARD SOAK'AWAY
WITH CONCRETE BASE
tAi'-A." L:\QA'rAfi=.STDs\D01D.clflll

liIWlESRCHColitRETBAsE
BLllIIl1tliCOIltRtTE

STANDARD SOAKAWAY
WITH CONCRETE BASE RING

NOV. OB

rPROJEClNO.

NOlI. 06

APPRovED

JEA
SCALE \A~""

ORAWING NO. TRE\OSION

0010

.llDilll
tALLDIHENSIOflSAREWrtwItEmESLN..ESsoTHERWISESTATED
2.CONCllETE
a)UNLESSOETAlllEll0TtAWlS.AUIt-SITUCON:1lETfS1fAU.8fCilAOE
OPaOANO AlL PREtASTCONCRETE SHAll BE WDE OPtJa

3.CONCAfTEPflOncnoN
II ASHGLE LAYER OfTANOlCiNACCORDoUlCEWlTHSPEClfICATIONCLAI
20_~1.G6 SHALL BE APPLED TO AU EXTERHALSURFAW
bIALt.IfTERNALSWA(fSEXCEPTEPO)(yI1Oll:URCOYEREDSlRFACU

ARET06E COATED WITH ONE COAT OF BlTUI1INJUS EHULSlllN AIlD TWO

D1AVAAES

/,--.

--

.......

"-

'\

I/ _

~T
\

\---~--:-:.:
:-:r.:---:
I

----

, '-

/
I

--1--

121-11108

{ B\\

;:7

-8

7/

~::a-~

--4.--\
\.\~

I
I

Fl,EXIlLEJOINT

1
'I5011AX!HUH

OPT01DO

:6'1

)1)lI-GtIo

300HAXI1UH

6QOKAlCtIUH

~
\I~T20-."

II'.. I I

no-ta" \

/I

~ -J
/7
--=="-r-::.-~-9

,/

no-1IIOB

\1/-

--

10 125 B

""

i'

/
'.......

/.~=+=~

,17

--1----1---

lit

"-

//

4. BUlllIlNGTHROOliiSTRUCTlIlS

CENTRS HORIZONTALLY "NDVRTICAUY

;1\

COATSOF8ITUMfNPAINT

IllONSTEPSTOBSl14TSPACEOAT)OD

nlWOB
126-100B

PLAN OF SOAKAWAYICATCHPIT ARRANGEMENT

PLAN AT SOAKAWAY ROOF LEVEL

PLAN

SECTION C-C
COVER SLAB FOR SOAKAWAY CHAMBER

REV. I

BY I DATE

AMENDMENTS

CONSULTANTS

11
l!

um DUTY COYER AN) FRAHE

CUSS81Z5 "4NI1IlI.f
COVER I. fRAJ1E TO 5UlT

8SEN11l,CLASS04CIOWlTH~

IlSDIAo.EAlIllPENING

PItECASTtDNtRrnCOVEA
SLAB U5aI THKK WITH

lSOJ:UOClEAAOPENING

y<;,

WlTHBlTUHENPAlNTFlNSH
jf~~""''''''C'"''''"'UIlOl

.....

".1

GRPLIlIHG.

Y:~-'

-1

---]

;[

DRAWING STATUS

1COATOFBlTUl"IHDll5
D1UlSION&.ZCOATSOF

BlrutltlOUSPAlNTTOlNTEANAl,.

,g~mH"

l-EXTEANALSURFACfS

CHAMBER RING DElAIL

o
o

PAE-CASTCONCRTE

OW18ERRlNliS

I
I

".

==E~

(OUALlVSPAaoAT
UCHlYEL,VERTlCAL

".

II

S~UIlD

umE ORHO fINES


.\

. ~"'~;;.

....,:""" i

~.::~.~

VARS

l;

mtE

l!I . :::

1SIIIIITKUSRC151lLJr10~

DEVELOPERS GUIDE

(Ehr!".,l Pi:

250 mocfilIAtMAR
7$1111 SINGLE SIZE WITH

STEP IRONS

~,

..I

-E=tt---~~
~;~::j).

<:~;).I

;;1

STORMWATER
TYPICAL CATCHPIT a: SOAKAWAY DETAILS

DATE

DRAWN
OM

SOAKAWAYICATCHPIT ARRANGEMENT
SECTION A-A

SECTION B-B

PROJECT CODE

PROJECT NO.

JAN. 07

CHECKED

JAN. 07

DWM
APPROVED

JEA

JAN. 07

SCALE (Al)

CADR." L:\QATAR~S1DS\OG'l.clwg

FAX. 4950555

PROJECT

t-.!!!.-

SrAGCiEJl[l)SvtllTRlCALlY(

lO... Ttl:KSRCZOBA5:E

P.O. BOX 23337

TEL. 4950055

lOG

""

5hI111PfllFORATUlNS

:~~~O.=~

DRAINAGE AFFAIRS

HASS COHeAETE lASE


SLABliRADEOPC20

-0

,""

DRAWING NO.

0011

IREVISION

.!:!.Qlli:
lJ.lllllHttlSlONS AAZ IN Hlli1ETRU Utfuss lIll1ERWlSfSTllEO

l.CoIlCIlfTE
al IiHUSS OETAULEO OTHfRWISE, All ""mu eONCAIn SltALL II[GRAlIE
Of'UOAhtlALLP/ICASTCOHCRn5HALLBEGRAt!OPC)t

J.col:llmPROUClJON

.j ASf'lG'.EUYERQF TAIlICIMGIN ACCQl1D.IJICEWITH SPEC!FKAT!OtfClAUSE

It-S106SHAllBt APPl.InlOAU EXlERliAlSUilFACE!O

bl AU IIHAAAl SU!lFACES rXCE9T EPOXY IWRlAR COVERED SURFA(ES


ARE TO 8[(OATED \l'1lI101tE COAT OF 8lTuHt!ouStHUlSlotiAtiD1WO
COATS OF I!ITIM:~ PAl!lT

DlAYAIlS

",.,...--,
/

~T

IRIJNSupSTOeS12,1,1Sf>ACEOA130C
tEKTERSI'\OIllIOkTAll'fAIlDYER1[,\llV

......

"-

"'\

\
/11
\J

__~-i-~
" I __

I _
\

--

-:1==*=-- _' __ ,.---I.-:::l~


=__

---.f--------"
?-___

.=rY

/
'\

"

1",.../

--1--

PLAN OF STORMWATER TANK/CATCHPIT ARRANGEMENT

11

'"

I
-9//#

,.

FlEXll\lEJOltfT

FLEXl:tJOIl(T

~GlIHAXlHliHfRl1

lliI"AXtlUH

flRSTJoI!(T

~t,%~~R

)HKAXItlH

FlRST)lIINT

'1!>l1HIICHUKANlI

Tl~""

[J

OVER6DO

2:~PIPEDl,tMmR

6GaHlXlItlH

HAXlHU'MfROH
FRST JOINT

ut-jooa

..!j

ft:Y1

~"-----------------~~=i~~
-+J~l~

'

+.--/
I

)"-40~

"':::::..-.J.
-..,.-;;:..~
I

UPT031G

4"TZSB

~
-

PlPEDlAI",ETtn

'"

/
............

--i------~'\~il
~

4. l\UlI.OlNGlHIWUl!tlSTROCTlmES

/.~;:-+!~~

,;(/

1. 7

/,1

\\- - - -

+8

1.

no-1MB
nG.lt;B_~_

'"

UD.""

I~

PLAN AT STORMWATER TANK ROOF LEVEL

PLAN

~
>If

~I

I.

I,~

VARIES

L......J
opdiiKG
,n

L~tJ"
401

SECTION A-A

REV.

AMENDMENTS

BY

DATE

CONSULTANTS

COVER SLAB FOR STORMWATER TANK CHAMBER

LlGliTDlfTYCGVERANDFRAHE
eStllTZ4UASSOloOOWntl

4'1501AClEAROPfHtlli

:l

OR!oWING STATUS

<~

~",I

I'-(;~

:';':'~:::_~~

!i

:~ .:~~:~SlAIlGRADEOPOO

"\-':;";I.MAS5COHCllnEBASE

S4THK!'lEHBIW!E

PROTECllOkGRADESR'24
~'H(BL.ttOikG

CiRAOESRCN

I'rmf
~
".

';".:-,

I--r--I:,l '..

DRAINAGE AFFAIRS
p;o, BOX 2J337
TEl. 4950055
FAX. 4950555
PROJECT

DEVELOPERS GUIDE

TITLE

":":'.(

""""''''''''A''~ttr
{:~
J'M

'1~ THICK SRC 25 8LHlI!tG

VARIES

~-: :_i ;::~15L

~~:; ,~~.':f

~i

Il!

STORMWATER TANK ARRANGEMENT


SECTION B-B

:.~\~~::~:I

STORMWATER TANK

SECTION A-A
I~
JAN. 07

PROJECT CODE

OM
CHECKED
-OWM

I JAN.

07

PROJECT NO"

APPROVED
JEA

I JAN.

07

DRAWN

sCALT(A-,)
1:20
C"'PI,r,

l;\QATAR-~DC12.d'l'l9

DRAWING NO.

0012

IREVISION

You might also like