Professional Documents
Culture Documents
Ashghal Guide Qatar Sewerage Amp Drainage Design Manual PDF
Ashghal Guide Qatar Sewerage Amp Drainage Design Manual PDF
Drainage Affairs
Volume 8
Developers Guide
December 2006
Drainage Affairs
POBox 23337
Doha, Qatar
TABLE OF CONTENTS
1
Introduction
1.1
House Connection
3.1
General
3.1.1
3.2
3.2.1
3.3
3.4
3.5
3.7
Pipework
10
3.4.1
Materials
10
3.4.2
Construction
11
Building Drainage
11
3.5.1
3.6
Domestic Flows
Construction
11
12
3.6.1
Ground Conditions
12
3.6.2
Design Issues
13
3.6.3
13
3.6.4
13
3.6.5
Warning Notice
14
3.6.6
15
16
3.7.1
Rising Mains
16
3.7.2
Pumping Stations
16
Storm Drainage
19
4.1
Introduction
19
4.2
20
ADVICE NOTE NO 1 - SOAKAWAYS AND STORM STORAGE TANKS FOR SINGLE RESIDENTIAL
DEVELOPMENT
24
ADVICE NOTE NO 2 --
29
ADVICE NOTE NO 3 -
33
APPENDIX SI -
37
APPENDIX SII -
39
December 2006
Page 1 of 47
APPENDICES
Appendix 1 - Building Permit Application
Appendix 2 - Design Unit Flows
Appendix 3 - Standard Drawings
December 2006
Page 2 of4?
Introduction
The PWA is responsible for all public foul sewerage, surface water and ground water
drainage systems in the State of Qatar.
All applications for sewerage and drainage for servicing new developments are subject to
approval by the Drainage Affairs as part of the BUilding Permit approval procedure before
such facilities can be built.
This Developer's Guide is for small developments up to 350 persons, where the peak flow
does not exceed 51/s. Larger developments should be designed in accordance with the
requirements of Drainage Affairs' Vol 2- Foul Sewerage design manual.
1.1
House Connection
A house connection is defined as the connection from a development (comprising domestic,
commercial, industrial, institutional premises, etc) to transfer foul flows to the public
sewerage system.
For every house connection, a terminal manhole (Manhole Number 1 - MH1), in
accordance with the Standard Drawings, should be provided and should be positioned as
shown on 3.3.
The terminal manhole should normally have maximum depth 1.2m. The depth of first
Inspection Chamber should be 0.45m.
All house connections should comply with the following general principles:
They should be designed and constructed to enable foul flows to pass to the public
sewer without flooding or surcharge
The last Inspection Chamber is know as MH1 (terminal manhole) shall be located
within the property boundary but is PWA property.
The private sewerage system shall be designed and constructed as a separate system,
capable of accepting foul flows only. Illegal connections allowing the entry of storm water
runoff shall not be made to the foul sewerage system.
House connection to existing pipelines should be made preferably to the nearest manhole
whenever possible, or failing that to a V-junction previously incorporated into the pipeline
during its construction, to facilitate future connections. V-branches and saddles are not to be
added to existing pipelines to avoid the permanent damage resulting from such
modifications to the public sewer.
Y branches will only be approved by DA if manholes are impractical due to access
restrictions
Volume 8 Developer's Guide
December 2006
Page 3 of 47
The pipe under the Foot path and the depth less than 0.9m
The pipe under the Carriageway and the depth less than 1.2m
December 2006
Page 4 of 47
Obtain DC 2 approval
The information that Drainage Affairs require to enable them to approve the development is
contained in Appendix 1.
Drainage Affairs requirement vary according to the nature of the property. A list of
properties and the associated requirements is provided overleaf. The list is a guide and is
not limiting.
The provision of septic tanks or holding tanks will only be necessary where there is no
existing sewerage system to connect to. Further information on the choice between septic
tank and holding tank is provided in Section 3.5.
December 2006
Page 5 of 47
Type of Development
Septic
Tank
Residential
Single Unit
./
Multiple
Storey
Commercial
Units
Holding
Tank
large./
Shops (small/large)
small./
large./
Restaurants
Outlet
small./
large./
./
./
Poultry shop
Industrial
Swimming
Pool
Discharge
Control
./
small./
Shopping Mall
Chemical
Screen
stabilisation /
dilution
./
/Multi
Food
Petrol
Oil/
Interceptor Grease
trap
./
Office (small/large)
Sand
trap
./
./
./
Hotels
./
./
./
Sports Clubs
./
./
./
Garages
./
Car Washing
./
./
./
./
December 2006
Page 6 of 47
Category
Type of Development
Septic
Tank
Petrol Station
v'
Holding
Tank
Sand
trap
Petrol
Oill
Interceptor Grease
trap
Chemical
Screen
stabilisation I
dilution
Swimming
Pool
Discharge
Control
v'
Abattoir
v'
v'
Farm
Livestock
v'
v'
Public Service
Mosque
v'
Hospital/Clinic
v'
v'
Laboratory
v'
v'
School
v'
v'
v'
v'
University / College
v'
v'
v'
Offices
v'
v'
v'
December 2006
Page 7of 47
3
3.1
3.1.1
Domestic Flows
Domestic flows derive from normal domestic appliances such as sinks, basins, toilets,
showers, washing machines, baths, etc. and are dependent on the number of persons in a
dwelling. In order to determine suitable domestic contributions to the sewerage system, it is
necessary to make certain assumptions. For example, each property has to be assumed to
house a certain number of persons, and this will vary from one type of property to another.
For design purposes 270 litres per person per day should be used.
Peak flows from domestic properties are calculated on a Design Unit (DU) For ease of use
a table of populations, design units, peak flows and average flows is provided in Appendix 2.
3.2
To allow for ventilation of the system, maximum design depth of flow should not
exceed 0.75 x pipe diameter.
Inspection chambers should be provided where the connection from each building
meets the main sewerage system of the development
December 2006
Page 8 of 47
3.2.1
At inspection chambers, all pipes should be laid such that their soffits (tops) are at
the same level.
3.3
5
Buliding line
GATE
Layout plans for both foul and storm water systems shall contain schedules as follows:
MH Ref
Cover
Level
Invert
Level
Depth
MHDia
Cover Type
All levels and dimensions are to be in metres to Qatar National Height Datum (QNHD).
December 2006
Page 9 of 47
DEPTH
(m)
1200X600
COVER.SIZE
(mm)
COMMENTS
No. of Connections from Buildings
< 1.2
600X600
< 1.2
1200x600
1220 x675
1220x675
> 1.2
900 DIA
600X600
MH 1
3.4
3.4.1
Pipework
Materials
The preferred material for foul sewers is extra strength vitrified clay pipes and fittings to BS
EN 295 or PVC-U to EN1401-1, with flexible joints.
Material
Pipe size mm
150
34
200
40
No concrete or asbestos cement pipes shall be used as they will be eaten away by sewer
gasses.
Pumping mains may be flexibly jointed ductile iron pipes (it is recommended that these are
lined internally with fusion bonded epoxy, ceramic epoxy, or polyurethane to resist sewage
gases) or HDPE. uPVC should not be used as it is brittle and can fail.
December 2006
Page 10 of 47
3.4.2
Construction
Construction should be in accordance with the Standard Drawings provided with this
document.
3.5
Building Drainage
Requirements for building drainage are applicable to domestic buildings or small nondomestic buildings. Systems are generally located within the building and above ground
level, unless the building has a basement. Complex systems in larger buildings should be
designed to BS EN 12056.
Building drainage of basement and ground floor shall employ a twin pipe system for
separate discharge of soil and waste flows to foul sewage manholes, as shown below:
Source of Discharge
Toilet, urinals
Soil
Bidet
Soil
Waste
Kitchen
Waste
. .
BUilding drainage of first floors and above shall employ a single pipe system.
Swimming Pools: To prevent flooding of the sewerage system the discharge from
swimming pools shall be limited to a maximum flow rate of 10 lis. Positive means of flow
control shall be provided such as a sharp edge orifice plate (50-60mm), a locked flow
control valve or a small diameter pipe (e.g 50mm x 3m long or 75mm x 10m long). As the
flow control will be dependent upon the particulars of the swimming pool installation the
developer shall provide calculations to demonstrate the design of the flow control device.
3.5.1
Construction
All sewerage and waste discharge pipes inside the bUilding as far as the manhole should be
PVC-U (unplasticised polyvinyl chloride) to BS 4660 and EN1401-1 with push-fit joints
incorporating elastomeric sealing rings to provide flexibility at joints.
Constructing pipelines below building should be avoided where possible. Where
unavoidable the design shall ensure that neither the structural integrity of the pipeline or the
building is compromised.
Pipeline trenches should not be excavated lower than the foundations of the building unless
concrete bedding and surround are used to the lowest level of the building foundation.
December 2006
Page 11 of 47
3.6
3.6.1
Ground Conditions
Since the soakaway relies for its operation on outflows infiltrating into the surrounding
ground, it is vital that the ground conditions allow such infiltration. Ground that is of low
permeability or with high existing water table will prevent percolation taking place, and the
septic tank system will fail.
Groundwater levels in many parts of this country have risen markedly in recent years, due
to:
the flat and undulating topography resulting in localised depressions in the underlying
impermeable layers. Such areas are without efficient drainage routes, and hence
susceptible to rises in groundwater levels during heavy rainfall.
Urban development has increased flows soaking into the ground, due to septic tanks,
water supply leakage and irrigation. The result has been significant rises in
groundwater levels, due to limited permeability of the ground.
Ground conditions and permeability are highly variable even within very localised
areas;
Most groundwater levels rise by between 1.0m and 1.5m during a wet period when
monthly rainfall exceeds 30mm. Level rise reduces to between 0.5m and 0.6m
nearer the coast;
Where soakaways do not work Holding Tanks should be provided for a period of 2 days
(min) storage.
Any proposed septic tank soakaway system must demonstrate that the surrounding ground
has satisfactory permeability.
December 2006
Page 12 of 47
3.6.2
Design Issues
The following issues require consideration when the use of soakaways is contemplated. The
list is indicative only and site-specific geotechnical and hydrogeological investigation and
interpretation is always required as the basis for successful design.
For the standard ring-type soakaway chamber some 3m overall depth it is recommended
that:
The minimum (wet season) groundwater depth should be more than 3.5 m below
ground level;
In areas where groundwater levels are rising use the groundwater depth should be
more than 4 mbelow ground level as a precautionary measure.
The permeability of the ground has a significant influence on the ability of soakaways to
function. If the permeability is attributable to sub-vertical jointing which is very variable over
short distances and use of trench type soakaways may overcome this because the chances
of encountering fissured zones is increased. For soakaways a permeability (k) of more than
1x 10-5 m/s required
Soakaways can become inefficient due to becoming 'clogged'. This may be due to silting up
(which can occur early as the initial 'slug' of water laden with silt generated when
groundwater is disturbed during construction work), and/or 'smearing' when the soakaway is
drilled (i.e. the fissures are blocked off by the crushed drill cuttings). These problems may
be minimised by jetting the system clean prior to its first use.
3.6.3
3.6.4
December 2006
Page 13 of 47
Capacity (Iitres)
2,900
10
4,500
20
6,500
40
11,000
80
20,000
100
24,500
200
47,000
300
78,500
350
80,750
Where septic tanks are required to accept discharges from other than domestic sources,
details of actual flows shall be provided.
Septic tanks are to be constructed in accordance with the Standard Details Drg. Nos. DG8
or DG9 as appropriate, or approved alternative prefabricated tanks. Tanks shall be
watertight and prevent leakage of their contents and ingress of groundwater. Ventilation is to
be provided with outlets distant from habitation.
The inlet and outlet of the septic tank shall be designed to prevent disturbance to the
surface scum or settled sludge, and shall incorporate at least two chambers or
compartments operating in series. Where the width of the tank does not exceed 1200mm
the inlet should be made via a dip pipe. To minimise turbulence, provision shall be made to
limit the flow rate of the incoming foul water. For incoming pipes up to 150mm diameter, the
velocity shall be limited by laying the last 12m of the incoming pipe at a gradient of 1 in 50 or
flatter.
The inlet and outlet pipes of the septic tank shall be provided with access for sampling and
inspection.
Septic tanks shall be provided with facilities for emptying and cleaning. Access covers shall
be of durable quality having regard to the corrosive nature of the tank contents. All access
shall be lockable or otherwise engineered to prevent unauthorised entry.
3.6.5
Warning Notice
A notice shall be fixed within an adjacent building describing the necessary maintenance.
The wording shall be in Arabic and English liThe foul sewage system from this property
discharges to a septic tank and soakaway. The septic tank requires monthly inspections of
the outlet chamber or distribution box to observe that the effluent is free flowing and clear.
The septic tank requires emptying at least once every 12 months by a licensed contractor.
December 2006
Page 14 of4?
The property owner is legally responsible for ensuring that the system does not cause
pollution, a health hazard or a nuisance."
3.6.6
Retention
(days)
25
Size
(m3)
18 - 135
21-40
20
135-216
41- 80
15
216 -324
80 -150
12
324 - 486
150- 350
10
486 - 945
December 2006
Page 15 of 47
will require to be approved by the Drainage Affairs prior to approval of the building permit
application.
3.7
3.7.1
Rising Mains
The desirable range of velocity should be 1mls to 2m/s. If small pipes are (.75mm) used
then the pump should be able to chop up the sewage.
The roughness value used for the design of the rising main should be shown in the
calculations and should be in accordance with "Tables for the Hydraulic Design of Pipes,
Sewers and Channels" published by HR Wallingford. The following roughness values (ks)
shall generally apply:
Mean Velocity in m/s
ks
Up to 1.1m/s
O.3mm
O.15mm
Over 1.5m/s
O.06mm
In the design of pressurised pipelines, thrust blocks are to be provided on flexibly jointed
pipelines where any pipe movement would open up the joints in the line and cause water
leakage.
Thrust blocks are also necessary near valves where a flexible joint is located to facilitate
removal of the valve for maintenance purposes.
The size of block is dependent upon the deflection of the flow, the size of the pipe and the
head of water inside the pipe.
3.7.2
Pumping Stations
Submersible Pumping Stations
It is expected that the maximum flows to be pumped will be less than 51/s, for which
submersible pumping stations are to be provided. Submersible pumping stations should
incorporate the following features:
December 2006
Page 16 of 47
Minimum of one duty and one standby pump with all pumps being of the same make
and pump model number.
Ultrasonic level controls should be configured to hold the last measurement in the
event of a lost echo.
Design Requirements
Detailed design should incorporate the following:
There should be sufficient space between the pumps to prevent interaction between
the pump suctions.
Pump stools should be securely bolted to the structural concrete of the sump and not
the benching.
Pump guide rails should rise close to the underside of the sump covers above the
pumps.
The covers should have a clear opening large enough to allow the removal of the
pump while on the guide rails.
Support points for the pump power cables and lifting chain should be provided under
the pump covers, these should be easily accessible from the surface.
Details of the capacity, power consumption and efficiency of the proposed pumps should be
submitted for approval. It would be expected that pumping stations would comply with the
pump manufacturer's requirements.
Submersible Pump Requirements
Sewage pumps should have an open type impeller with a minimum passage of 100mm
unless chopper pumps are being used. Impellers with smaller passages are likely to suffer
from frequent blockage due to the nature of sewage debris.
December 2006
Page 17 of 47
Centrifugal pumps are recommended to have a maximum running speed of 1450 rpm (4
pole motor) pumps. Speeds in excess of this we cause excessive wear and premature
failure.
The maximum allowable starts per hour should be as specified by the pump or motor
manufacturer. In the absence of any specified figure a maximum of 15 starts/hour is
acceptable.
Structure Requirements
The developer shall supply full details of general arrangement and structural drawings and
supporting calculations for approval.
Package pumping stations contained in GRP or Polyethyelene structures as supplied by the
pump manufacturers are acceptable. The structures are to be surrounded by a minimum of
150mm of OPC20 concrete.
All other pumping stations shall be constructed of reinforced concrete, designed in
accordance with BS8110 "The Structural Design of Concrete" with specific requirements for
wet wells of BS8007 "Design of Concrete Structures for Retaining Aqueous Liquids".
Design crack widths shall be in accordance with BS8007 and shall not exceed a maximum
design surface crack width of 0.20mm from direct tension, flexure and temperature effects.
Ventilation and Odour Control
Small pumping stations generally do not require odour control. However, where odour
control is required passive activated carbon unit should be sufficient.
Electrical Requirements
All electrical equipment, cabling and installations shall meet the requirements of the
KAHRAMAA.
Control equipment shall be housed in dust and damp-proof, compartmentalised cubicles,
complying with the relevant British Standards. Adequate anti-condensation heaters are to be
provided in all compartments. All outdoor equipment shall be waterproof. All control panels
shall be provided with a 13-amp single-phase power outlet and a 25-volt outlet for a portable
inspection lamp.
Emergency stop, lock-off buttons shall be provided adjacent to all plant installations. Unless
specifically designed for submersible operation, all electrical plant shall be located above
maximum water level.
Site Requirements
Pumping stations will generally be located with the development site. Consideration should
be given to the need for light vehicle access for maintenance purposes.
December 2006
Page 18 of 47
4
4.1
Storm Drainage
Introduction
The purpose of this guide is to advise developers of the Public Works Authority (PWA)
requirements for the provision of surface water and ground water management within
development sites.
The existing surface water and groundwater systems in Qatar are of limited extent. Primarily
these systems manage surface water runoff and control groundwater levels for the
highways. Urbanisation of the catchments increases the amount of potential runoff from
development sites which would cause overload of these systems. This guide has therefore
been developed to guide and assist developers in designing a managed drainage system
that does not adversely affect the existing drainage network but will provide protection from
flooding for the development.
This guide sets out the criteria that Drainage Affairs (DA) requires developers to follow for
the provision of a Managed Drainage Systems for the disposal of surface water and
groundwater.
Drainage Affairs have developed Advice Notes for four types of development which contain
information on how the Managed Drainage System approach can be achieved.
The types of development specified are as follows:single residential development
residential compounds
tower blocks
zonal ®ional development
Figure 1 indicates the decision process for the appropriate type of development.
December 2006
Page 19 of 47
1
I
Single Residential
Development
J.
Residential
Compounds
Definition:
Single house on a development plot.
Drainage Philosophy:
Infiltration/percolation systems
(soakways, infiltration basin etc) in areas
of low groundwater table.
Tanks in areas of high groundwater table.
Drainage systems to serve roofs and
hardstanding areas as necessary.
r Tower Blocks
~
Zonal and Regional
Developments
Definition:
A residential compound is a development
consisting of properties and internal roads
upto 5 hectares in area.
Definition:
Tower block is defined as a multistorey
residential or commercial development.
1
Definition:
Development of residential compounds
greater than 5 hectares and development
of single and multiple QAR Zones.
Drainage Philosophy:
Drainage Impact Assessment (DIA)
required.
Permitted Discharge:
101/s per ha of development.
Permitted Discharge:
Not Applicable
Permitted Discharge:
101/s per ha of development.
Drainage Philosophy:
Storage/Allenuation tank system.
Drainage Philosophy:
Infiltration/percolation systems
(soakways, infiltration basin etc) and
storage system (tank sewers, retention
tanks ,etc) in areas of low groundwater
table. Storage tanks in areas of high
groundwater table.
1
Drainage Affairs Requirements
Submission of Project Profile
Submission and Approval of DIA
1
I
December 2006
Page 20 of 47
Site topography with respect to site levels should be studied in detail. Development
in the lowest parts ofthe sites should be avoided. The lowest parts of the site can be
used to store and collect any stormwater runoff minimizing the construct costs of
piped networks. Building on the highest part of the site may reduce amount of
protection from flooding that is required.
High groundwater tables can cause problems not only during construction but
afterwards with damage to underground structures and utilities. Drainage Affairs
have information available on the areas in Qatar where high groundwater is a
problem and can provide guidance as to its control. If a site is water logged filling the
low lying areas does not remove the problem, it only hides it from view. A long term
solution is needed which may include ground water control.
Drainage Affairs require surface water runoff to be managed and controlled for all
developments and therefore adequate provision should be made in all developments
for the storage/attenuation of stormwater runoff.
Ground conditions within the site should be understood, whether there is sand, fill
material or massive rock will all have an influence on the type of surface water
drainage systems that may be developed for the site.
Site grading has a considerable influence on the cost and effectiveness of the site
drainage and therefore should be considered at a very early stage. A flat or level site
is much more expensive to drain than a site which has some fall across it where
natural drainage paths can be developed. Development adjacent to the coast should
be graded to a minimum of level of 3.5m above Qatar datum. This will allow gravity
drainage systems to be developed and will protect other utilities and building
foundations from damage through high groundwater levels.
The design standards for the drainage system for the development should be
established at an early stage. The degree of protection from flooding for the
development needs to be established at an early stage to
Drainage Affairs philosophy is to manage to surface water and groundwater systems by the
use of various techniques that are part of the stormwater management philosophy described
under various names around the world such as SUDS(Sustainable Urban Development
(UK)), BMP (Best Management Practice (USA)) and Stormwater Management(Australia).
The techniques that have been identified as appropriate for Qatar are:Preventative measures
The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping
Volume 8 Developer's Guide
December 2006
Page 21 of 47
suitable for a desert climate instead. Construction of individual tanks or soakaways for each
property to store or disperse the rainfall.
Pervious surfaces
Surfaces that allow inflow of rainwater into the underlying construction or soil. This is a
development of the block paving technique that is currently in extensive use in Qatar to
develop its full potential by the use of geotextile filter membranes.
Filter drains
Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store
and conduct water; they may also permit infiltration.
Swales
Swales consist of wide shallow channels with or without vegetation that conduct and retain
water, and may also permit infiltration. These work well within development sites with a
large proportion of landscaping where the design of the landscaping can easily incorporate
these features.
Emergency Flood Areas (EFA)
The use of Emergency Flood Areas (EFA) is well established in Qatar and is a viable option
for the management of surface water run off.
Infiltration devices
Sub-surface structures such at modular tanks systems that can promote the infiltration of
surface water to the ground. There are a number of proprietary systems on the market for
this.
Oversize Pipes and Throttles
This option is appropriate if there is a positive drainage system nearby that can take a
controlled amount of runoff for the site.
All of these techniques are valid solutions to produce a Managed Drainage System,
however every development site is different and will have different problems that will require
different
solutions.
December 2006
Page 22 of4?
4.
Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working
Group(UK) July 2004
December 2006
Page 23 of 47
ADVICE NOTE NO 1
1.0
Introduction
Soakaways and storm tanks are simple methods of managing storm water run off in situations where there
is no positive stormwater system available or planned for the future.
The three determining factors for the design of a soakaway drainage system are:-
the size of the area which relates to the volume of water to be drained
the percolation rate of the soil/sub-soil
the depth to the water table i.e. the upper level of the groundwater that is naturally held
within the soil, sub-soil or bedrock. '.
Soakaways should be provided for all roof areas and hard standing areas within the building plot.
2.0
The choice of soakaway or storm tank for managing the surface water runoff from a site will
depend upon the depth of the ground water level for the ground surface.
The method of determining whether a soakaway or storm tank is appropriate is indicated 'on the
following flow chart.
December 2006
Page 24 of 47
Residential Properties
Soakaway I Stormtank
Design Choice
No
Yes
Sizing of Facilities
3.1
Size of Soakaway
The following table shows the size of soakaway/tank that needs to be constructed.
Table 1: Depth of soakaway required for the design rainfall for different drainage areas
Chamber Volume Calculation
Chamber Diameter
Roof Area
to be
drained
Rainfall
Depth for 1in
2 year 24 hr
Duration
m2
Mm
100
25
200
Volume of
Storage
1.2
1.5
1.8
2.1
m3
0.9
2.3
1.99
1.27
0.88
0.65
25
0.9
4.5
3.98
2.55
1.77
1.30
300
25
0.9
6.8
2.65
1.95
400
25
0.9
9.0
3.54
2.60
500
25
0.9
11.3
4.42
3.25
Runoff
Coefficient
><><
><><
><><
December 2006
Page 25 of4?
Note that this is the storage volume required between the dry base or water table level of the soakaway,
and the invert (inlet) level of the incoming drainage pipe, and assumes that the chamber is empty.
For example if the drainage area indicates that a 1.5metre diameter chamber with a soakaway depth of
2.55 then if the invert level of the incoming pipe is, say, 600mm below ground level, and assuming the
base is above water table level, then the overall depth of the soakaway is...
2.55m + 0.6m =3.15m overall depth.
If there is insufficient depth because of a high water table, the required volume of the soakaway can be
met by increasing the plan size or placing two or more soakaways of this size side by side.
3.2
The sizing of the stormtankl tank should follow the procedure indicated in Table 2.
Table 2: Depth of Tank required for the design rainfall for different drainage areas
Tank Volume Calculation
Tank Diameter
Area to
be
drained
Rainfall
Depth for
1in 2
year 24
hour
Duration
m2
mm
100
25
0.9
200
25
300
Volume
of
Storage
1.2
1.5
1.8
2.1
m3
1.1
2.5
2.19
1.40
0.97
0.71
0.9
1.1
5.0
4.38
2.80
1.95
1.43
25
0.9
1.1
7.4
2.92
2.14
400
25
0.9
1.1
9.9
3.89
2.86
500
25
0.9
1.1
12.4
4.86
3.57
Runoff
Coefficient
Factor
of
Safety
><><
>< ><
>< ><
It should be noted that the tank will have to be pumped out after the rainfall has finished, restoring the
flood protection of the property.
4.0
Construction details
4.1
Soakaway Construction
A typical standard detail drawing of a soakaway is included as Figure A1 of this advice note.
December 2006
Page 26 of4?
Ready-made soakaway systems are locally available in pre-cast concrete. These tend to be circular
sections that can be stacked to give the required depth and storage volume, and then topped with a
suitable cover.
5.0
5.1
Soakaways
Soakaways do require some maintenance to keep them operating satisfactorily. Each year after the rainy
season the following maintenance task should be carried out:Inspect catchpit and remove any silt in the catchpit.
Inspect soakaway and remove any silt in the chamber.
5.2
Tanks
In order to make the tank effective in the control of stormwater runoff, after each rainfall event the tank
should be emptied of water and silt. The water in the tank should be tankered away or it can be used for
irrigation of any garden areas. Under no circumstances should the tank be emptied to the foul
sewerage system.
Each year after the rainy season the following maintenance tasks should be carried out:Inspect silt trap and remove any silt in the trap.
Inspect tank and remove any silt in the tank.
Inspect and repair any leaks.
6.0
6.1
Safety
Excavations
December 2006
Page 27 of 47
6.1.1
Any tank buried in the ground can be dangerous. Only qualified and experienced operatives who have
and are trained in the use the appropriate safety equipment for entry into confined spaces should be
employed to carry out the cleaning and inspection works.
References
December 2006
Page 28 of 47
ADVICE NOTE NO 2
1.0
Introduction
The drainage of tower blocks and small residential compounds requires the designer of the drainage
system to develop site specific solutions to protect the development from the results of flooding.
The basic requirement is that the development must deal with its runoff within the site and not export the
problem to adjacent developments. Drainage affairs recommend a number of methods that could be used
to manage the drainage system form tower blocks and residential developments. The designer of the
proposed system should make himself aware of the concepts of managed drainage systems and choose
the most appropriate system for the site in question.
It is not obligatory, but it may be useful for the developer to produce a project profile for the site drainage.
The project profile provides a means to collect all relevant data for the development area which will help to
produce the Managed Drainage System proposal.
2.0
Drainage Affairs recommend that the designer of drainage system for the development investigates the
following measures and systems to manage the surface water run off.
Preventative measures
The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping suitable for
a desert climate instead. The use of individual tanks or soakaways for each property to store or
disperse the surface run off is another method of reduction in surface water run-off.
Pervious surfaces
Pervious surfaces are surfaces that allow inflow of rainwater into the underlying construction or soil.
In Qatar extensive use is made of block paving for footpaths and parking area. Instead of bedding
the concrete blocks directly on sand bed if they are laid on a granular sub-base water can stored in
the sub-base and infiltrate into the ground. Typically the sub-base consists of 300m of 25 - 150mm
grades stone overlain with a geotextile. The bedding for the block paving consists of 50 mm of 410 mm graded stone.
Filter drains
Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store and
conduct water; they may also permit infiltration.
Swales
Volume 8 Developer's Guide
December 2006
Page 29 of 47
Swales consist of wide shallow channels with or without vegetation that conduct and retain water,
and may also permit infiltration. These work well within development sites with a large proportion
of landscaping where the design of the landscaping can easily incorporate these features. The
swales can be used for infiltration and evaporation. Areas of planting which are lower than the
surround areas can be used in a similar way to a swale.
Infiltration devices
Sub-surface structures such at modular tanks systems that can promote the infiltration of surface
water to the ground. There are a number of proprietary systems on the market for this. This is
growth area in the field of managed drainage systems with a number of manufacturers being able
to provide plastic modular systems to build large tanks that can be installed under car parks
recreation areas etc which provide storage, attenuation and infiltration facilities for the surface
water run-off.
Oversize Pipes and Throttles
This option is appropriate if there is a positive drainage system nearby that can take a controlled
amount of runoff for the site. A smaller diameter pipe or orifice plate is used at the outlet to control
the discharge rate.
3.0
Project Profile
In order that the designer can assess the requirements it is recommended but not obligatory to
produce a project profile. The project profile should include all relevant information available.
Information should be in note form. The checklist below is provided as a guide only, to assist in
December 2006
Page 30 of 47
identifying major items which should be included or considered in completing the project profile to
assist in the choice of managed drainage system for the site.
1.
2.
Project title
Developer
Contact Person (name/telephone)
Nature and description of the project
Location (include plans)
Area of project site and % paved/unpaved
Finished site platform level
Whether planning permission application is required
Recent and dated photographs to show a panoramic view of the site
a)
b)
c)
3.
December 2006
Page 31 of 47
4.
A 1:20000 scale plan of the catchment in which the project site is located with the
drainage system relevant to the proposed project highlighted.
A detailed layout plan at 1:5000 scale or larger, of the project site with the site
boundary, existing ground levels, existing drainage and existing land uses all
identified both within and adjacent to the project site.
A general description of the existing drainage including adequacy of the drainage
system and flooding history.
OTHER INFORMATION
Potential drainage impacts (described in broad terms) arising from the project.
A general description of the proposed drainage impact mitigation measures (if any) to
be provided.
A general description of the proposed drainage system.
A general statement on the flooding situation upon completion of the project.
References
1
4.
Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004
December 2006
Page 32 of4?
ADVICE NOTE NO 3
Table 1
1.
INTRODUCTION
1.1
This Advice Note outlines the Drainage Affairs assessment procedures for the drainage impact
of zonal and district development projects. It is anticipated that the information contained in
this document will assist in preparing project profiles and in addressing the project's potential
drainage impacts.
1.2
Many private sector projects have the potential to cause adverse impacts on stormwater
drainage, groundwater and flooding. These impacts need to be considered at the early stages
of the project planning and designed to minimize drainage and flooding problems and to avoid
expensive remedial measures.
1.3
The Drainage Impact Assessment (DIA) process provides for a systematic approach in
addressing drainage issues associated with any project. The primary objective of the DIA
process is to demonstrate that with the implementation of necessary mitigation measures, the
project will not cause an unacceptable increase in the risk of flooding in areas upstream of ,
adjacent to, or downstream of the development.
2.
2.1
preparing the project profile and undertaking the DIA study if required;
(b)
(c)
(d)
2.2
The application of the DIA process to a particular project should not be separated from the
other basic investigation and design processes. Thus, the developer can integrate drainage,
environmental, technical and economic assessments to produce the best and most
appropriate project design.
3.
3.1
DA is responsible for examining project profile; determining whether DIA study is required;
approving DIA study report submitted under the DIA process; and advising the Planning
Department drainage conditions on the project.
December 2006
Page 33 of 47
3.2
Notwithstanding that the developer may have submitted proposals in accordance with the
guidelines stipulated in this Advice Note and DA may have accepted such proposals or have
required such proposals to be amended prior to acceptance, DA shall have no liability to the
proponent for any damage, injury, losses, claims, charges or fees which may arise from any
act, omission or negligence howsoever caused by DA, its agents, servants or employees.
4.
4.1
The DIA process comprises two principal elements, a project profile and, if necessary, a DIA
study.
4.2
All development projects for Zonal or Regional Developments will require the preparation of a
Project Profile.
The project profile and DIA study require substantial engineering input and judgement, and
should be undertaken under the direction of a registered professional engineer in the Civil
Engineering discipline. Any submission made as part of the DIA process should be signed
and certified by the registered professional engineer in charge. Failure to submit a satisfactory
project profile or DIA study report, if required, may unnecessarily delay the DIA?? process.
4.3
4.4
In areas not served by an engineered positive stormwater drainage system, the scale of the
development, the form and location will determine the necessity of DIA process. As a general
rule, if the answer to any of the following questions is positive or unknown, DIA process shall
be applied to the project:
(a)
(b)
(c)
will reclamation or filling be required to form the site for the development?
(d)
will the drainage system downstream of the development site require to be upgraded to
convey the runoff from the site?
(e)
(D
(g)
will the development have substantial area of planting which will require irrigation?
(h)
will irrigation cause a rise in groundwater levels that may cause concern for building
and road foundations?
Project Profile
4.5
An outline of the information required for the project profile is given in Appendix I. Based on
the information in the project profile, DA will decide upon the extent and scope of the DIA
study that is required by considering the likely impact of the proposed project on:
December 2006
Page 34 of 47
(a)
(b)
(c)
(d)
The scope and requirements of the DIA study shall be proposed by the developer for DA'S
agreement. In setting the parameters for the study, a conscious effort should be made to
constrain its scope as far as practicable while ensuring that the validity of the study is
maintained. The findings of the DIA study shall be documented in a report prepared by the
proponent for submission to DA and the Planning Department. An outline of the information
likely to be required for a DIA study report is given in Appendix II.
4.7
The DIA study shall be carried out in accordance with the standards set out in by DA Drainage
Manual.
4.8
The findings of the DIA study will be used as the basis for setting any requirements on
drainage provisions, flood mitigation measures and performance monitoring tasks which may
be placed on the project. DA will advise the Planning Department or Lands Department of
such requirements on the project as appropriate.
5.
5.1
The developer shall be responsible for incorporating the drainage impact mitigation measures
into the design of the project to ensure that the expected drainage performance of the project
is achieved. The Authorized Person in charge of the project should state in writing that
necessary mitigation measures identified in the DIA study have been incorporated into the
plans.
5.2
The developer shall be responsible for implementing the drainage impact mitigation measures
and undertaking the monitoring programme during the construction stage to ensure
compliance with the conditions on drainage requirements, flood mitigation measures and
performance monitoring requirements as imposed by the DA.
5.3
5.4
The developer shall sort out and agree with the maintenance parties on any requisite
monitoring programme during the operation stage. The responsibility for undertaking such
monitoring programme, if necessary, shall rest with the maintenance parties. Depending on
the nature and type of the drainage works, the maintenance parties may be the developer
himself, his agent, other person or DA.
December 2006
Page 35 of4?
References
4.
5
6
Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004
Stormwater Best Management Practices in an Ultra-Urban Setting
US Department of Transport Federal Highway Administration
December 2006
Page 36 of4?
In order that the need for a DIA study can be assessed, the project profile should include all relevant
information available. Information should be in note form. The checklist below is provided as a guide only,
to assist in identifying major items which should be included or considered in completing the project
profile.
1.
4.1.1.1
2.
Project title
Developer
Contact Person (name/telephone)
Nature and description of the project
Location (include plans)
Area of project site and % paved/unpaved
Finished site platform level
Whether planning permission application is required
Whether lease modification application is required
Statutory land use zoning
Recent and dated photographs to shown a panoramic view of the site
4.1.1.2
a)
b)
c)
December 2006
Page 37 of 47
3.
4.1.1.3
4.
A 1:20000 scale plan of the catchment in which the project site is located with the drainage
system relevant to the proposed project highlighted.
A detailed layout plan at 1:5000 scale or larger, of the project site with the site boundary,
existing ground levels, existing drainage and existing land uses all identified both within and
adjacent to the project site.
A general description of the existing drainage including adequacy of the drainage system
and flooding history.
OTHER INFORMATION
Potential drainage impacts (described in broad terms) arising from the project.
A general description of the proposed drainage impact mitigation measures (if any) to be
provided.
A general description of the proposed drainage system.
A general statement on the flooding situation upon completion of the project.
Any other available information relevant to Appendix II may also be submitted to facilitate DA in
deciding whether a DIA study is required. Submission of sufficient information under this
heading may enable DA to make an early decision on whether exemption from submission of a
DIA study can be granted.
December 2006
Page 38 of4?
In order that the DIA study can be completed as quickly as possible, the DIA study report should include
all relevant information available. In addition to the information submitted in the project profile (Appendix
I), the following information should be included in the report. The checklist below is provided as a guide
only, to assist in identifying major items which should be included or considered in completing the DIA
study.
The findings of the D1A study should be documented in a report prepared by the proponent which will then
be used as the basis for setting any requirements on drainage provisions, flood mitigation measures and
performance monitoring tasks which may be placed on the project.
1.
2.
Provide the following details to quantify the changes to the drainage characteristics of the
catchment arising from the proposed project:
December 2006
Page 39 of4?
events for the project site, any affected natural drainage paths or existing positive or
non positive drainage system.
Change in flood storage caused by the project.
Assessment of timing of peak runoff from project site relative to timing of catchment
peak runoff.
Hydraulic capacity of existing drainage upstream, within and downstream of project site
if applicable. This information will be made available by Drainage Affairs .
Hydraulic capacity of proposed drainage upstream, within and downstream of project
site. This will depend upon the drainage systems designed by the developer.
Changes in peak runoff, peak flood levels and/or peak velocities for 2, 10, 25 and 50
years return period flood events at critical locations.
Details of temporary drainage during construction including hydraulic capacities.
Provide details of all potential impacts which might arise as a result of changes to the
drainage characteristics caused by the proposed project and identify land users who might
be affected. Provide details of the impacts caused by the following:
The potential impact should be considered on upstream, downstream and adjacent land
users, and land uses should be identified (e.g. residential, commercial, institutional,
industrial, infrastructure, agricultural, recreational, conservation areas).
December 2006
Page 40 of4?
December 2006
Page 41 of 47
Appendix 1
Building Permit Application
December 2006
Page 42 of4?
Scale
Notes
Both copies of submission will be stamped approved by the Drainage Affairs. One copy will be returned to
the Developer, the other copy will be retained by the Drainage Affairs
Developer's Programme
Estimated Construction Start Date
Site Location Plan (A3)
1:5000
1:1000
A4 Single Property
A3 Developments (Compounds, Mult)
Site Plan (A) showing: (Foul Sewer)
All levels related to Qatar National Datum
1:1000, or
Site boundary
1:500, or
Building outline
1:200
numbered
from
Arch. Levels
levels.
Site levels
1:1000, or
December 2006
Page 43 of 47
and
QNHD
1:500, or
1:200
Manholes
MH1.
numbered
from
Arch. Levels
levels.
Site levels
Building Drainage (A1)
1:50
Floor plans
Fittings and Sanitary fittings
Pipeline details
Discharge points
Gullies
Copies of hydraulic design calculations (A4)
Foul water (including trade effluents)
Surface water (including impermeable area plan
and attenuation details)
Design parameters used
Pumping Stations information showing:
General arrangement details
Wet well capacity
Rising Main Capacity
December 2006
Page 44 of 47
and
QNHD
Appendix 2
Design Unit Foul Flows
December 2006
Page 45 of4?
Peak and Average Foul Flows Using Design Units Based on 270 IIh/d
Population
Avg Flow
lIs
Sewage
m3/d
Peak flow
lIs
0.003
0.259
1.64
0.016
1.382
2.53
10
0.031
2.678
2.82
15
0.047
4.061
3.09
20
0.063
5.443
3.35
25
0.078
6.739
3.51
30
0.094
8.122
3.62
40
0.125
10.8
3.83
50
0.156
13.478
4.03
60
0.188
16.243
4.22
70
0.219
18.922
4.41
80
0.250
21.6
4.59
90
0.281
24.278
4.74
100
0.313
27.043
4.86
December 2006
Page 46 of 47
Appendix 3
Drawings
Drg No.
Title
DG1
DG2
DG3
DG4
DG5
DG6
DG7
DG8
DG9
DG10
Soakaway Details
DG 11
DG12
Stormwater Tank
December 2006
Page4? of4?
1JQJTh
1. ALL DKN5IOItS All! It H1WHETRtS lJI,ESS DlHEftWISE STAna
2. TillS DRAM 10 BE A,f,D1H CIlNJWlCTlDltWlTKAU A[LEVA~U1AlIHllt
DnAl~S
iPrtKfllEAMFORCOVERS
r------,
I
I
I
lX
I
I
:~
15tIH.mAROPE~llli
I
I _____ ...JI
L
PLAN ON COVER
r,t5t,..
...
'00
r'~~;~
r-Er--
~OJ
),'
-..
OJ
15IDIAEXTR4&1AfHGTH
VI1llIfID (LAY PFE
IE
r--E f--.
I--
-- 3=
-......,...
',::
i--- --1+-----1
.:~
;~';n
"
--
'--
';
'.~.,
:.;::
1f.'::
f--
,,:':-
.~
0"
r--J!!-
{)/
C!NtAIPAA1'ETOSLn
.
.:
....
I
I
L ____ ...J
JO'
'"
t~~
,:;..
..
.~;
."
SECTIONC)
SECTIONC)
CHAMBER TYPE'A'
...
~L ' - Ii
rrr-- :--
c-~
'.~:~
Z[
.:.'";.:.
~
L
,0
':"'t~ 0,
r;
PlltlTl!~&IWl[SRt20
~DPC2IlMS1TUCOlKRm
I- _
GRNXOPC:tOHASS
COJjCIl1EWALLU.ut:---
","'HE_I<
't:':
" j,;~~
1-'-'
HORTAIlIWJ[Kf!TOrltAtR
J.AEGUl.AlNliCOlml5
e-~
-,
~ ~~~Rl~~tEoreETE
SU1 twfIOl.E fUME OPE"G SIZE
P.O, 60)(23337
TEL. 4950055
FAX. 4950555
-,
lIIlADE SRI: 20
..
",. . . . .
~~
PROTECTlOt(&RAOESRt211
1JQJTh
MA5s(QNCAETE8A5E
~,L
UTHKBL
llIWlI!:sRI::n
GRADESIIC20
COlltJllElKNCIlttG
0
o\~~
TITlE
~EIIl(20WESl.AB
INSPECTION CHAMBER
TYPICAL DETAILS
SHEETI
.J"',,,."......
1t.AB000DCSRCD
2. TYPE'8'ARRAIIG"'~Tl08EUSEOFDRJTOlIRANCH
DEVELOPERS GUIDE
umocMaRrARAEtfIlERII6
bll!
CQNCRETEeENCHIIIG
DRAINAGE AFFAIRS
200 MC!HkALTlllClOE!S
alHrC~HDRTARRE!IJ(RIIG
SECTlONC9
DRAWN
SECTION@
D~
DWM
. . . . . . . . . . . . ._
...... -'.
DII'T
PROJECT CODE
NOV. 08
CHECKED
NOV. D6
PROJECT NO.
APPROVED
JEA
SCAl (Al)
1:70
a .._ _
DA'T
PROJECT
!"'ERNALBl.OCKWOllICfAaTOtlAVt
SUIGIl4DESRtJ'
BY
EH12'a.WA15DlHAlOlllE
105ll11UtCLLEAROPNk'&
HAYUlIIOCHlRTAlIl[IODtfUi
!l.L
""",.".
15TKICILH
AMEI<D~ENTS
REV.
CONSULTANTS
DRAWING STATUS
llRADESRC:lO
,:<:;:-~~=r~lr:~OW
..
liIWlE lAC 21 CONCRETE
SECTIONC9
1"---
----
-- 3=
--+
I
IE
J~':'-'
e-~:
IE
f--
W1TNSEALINGPl.Al[
:r.....i ;
.,
1M
'"
."
t...
IE
--
e:,
STIl'IllOIt5-
'DSl.lTAkDfACII~tcN[(TIONBUlLTIMEXTEkDEDfjUlUla.
UI .. mCllARCPfttNIlo
--+ f - ::....-: ~!
-
~:~\ \-
".:.,~
l.FllRAllDIlIOkALLAlE!lAlCONIICTNI!OICt!flGSKALLIlfMllDfIED
I
I
PLAN ON COVER
~M
~'~~:~~\~
I
I
PLAN ON COVER
1M
r-----,
I
I
I
I
I
I
I
I
I
I
IL _____u_ _ _ _ _ ...JI
COVDIIrFRAMETOSUlT
I
I
'"~
'.ALllmAIlAt.N!OOOERIlAlFACESOfTtECtW1BERSTOftPAMED
WITtilWOClIATS0' CaAL l.utEPOX'i
r-----n-f-----,
NOV. D6
DRAWING NO.
DGI
REVISION
lJQill;
t.ILL OilOSlOI(S AAE III )tWMEJR[S UlUSSOTHERWlSE SlAT!D
ill
.r-:1
BI'MINOU5PAllfT
~~~,\':'
..OHf:tvID~lf AIm
. QultEHEICIS
NII.0IBHAMH
J.lJfIEIlNAl. StIRfAas 1IF [HANSER WALL AII (OYER lOBE pAMED WRH
lWOCllATSOFUW.1AREPOXYPAlIf'r
"
~l15D~
THlSDfTAillSfImSPIm.
),311101-'
14
SO(l(ElPllS.FCItPPES
~
tT17It.ftI:
&-
&-
---.J
"
bIoTUG3-15
---.J
"
REINFOR[EMENT
TO"".....AS~~ttll:"LO' ..,..""
't'tP! (If SlUl.
WTREnF BARS
BARHARK
BARtLlMETE
.c.1U05
11
BAR LOCATIONS
T TOft
'M
III
1",1
'D1'DlA
3DO
1610
DETAIL
'02'01'\
Ff
fAIIFACf
880TTllH
U EACHfACE
'" NEAR FAa:
EW UCIlWAY
An ALrERlCATlY!!,lRSIIMRSEII."SIlDWWHERERE4UlREDI
E9
DUCTllEIIlOltMA!ItIl[COYERI.FRAME
lDSUlT'1SDIACLEAROPEItIltG
-~
,0.
'nn;~
lI-uAlil ~
.!l.
["r""""'''''''COVIR
.
.
\ ~l
"
., ".
mL-
~.7
L=.
I "Il,--..........
~r~"iiiE~~~"~'
(DkCRnEBACKFllL
AS SPOOFED
19
.p'"
-Sl
""BfA
[OVER sua
iiiOLi""
T5THlDCCOMCRll[
BUIlDlIlU!UDE IRC: n
HASSCCWCRETEat:NOlItl6
GRAIlESIlI:JOWlTK121tllCIC
EPOJIYMllRTARREIlIlI:lIItG
!ill!!.!l.AII_
"'D.
SECTIONC)
SECTlONC9
'AR
"""
;;
StZl!
TU
TU
!!
.!!.
TU
TU
..
AMENDI,IENTS
REV.
,m
'"
IF
,
1
,,
112
TU
T12
...
'"...
"
t"
Z'lS
1
,
"a
"
"
a
DRAWING STAT\JS
.!!.
., D.
SPI!(flEDTDTHEII"WSY2SlI11
mIKI&!WIll
Dl
DRAINAGE AFFAIRS
P.O. BOX23337
TEL. 04950055
FAX. 04950555
a.AsS'I'CClV'ERSlM!IllLtfDl1JYJlOeEUSEDltAU.CASai\lftTHIk
p.etaPERTVIICll/IIIA1tYWALLS'DABOTKRAlSEDAliDFlUSHDETAILS
PROJECT
tlTtlUCSIllDCONCRflEBLOCKWOIIIl
liAADElPCJ5SEDPEDIlt6TIICI(
""'"'-\""
~~
_.._-~
....
PRlWTcaYCRHAIIQRADEOPC]5
.~.
' 'D
SEWERAGE
STANDARD DETAILS
TITLE
TWOCOATRENtD
.1=
DETAIL
"r
INSPECTION CHAMBER
TYPICAL DETAILS
SHEET2
DRAWN
D~
E9
DATE
Ju.8ElQINIiDINENSlllItSAAEICACCOADAlCEWlTHB~UI
'"
CONSULT,6NTS
MlIIls
!! - -1'I
.!!
~
~
T1Z I-f--I-"
OT
D1
Dh~
SECTIONIt\
~MASstotomGll:lDESRtJO
..
.,
. "__'_,,-~~~h':.
S!.A1tGRAD! llPOS
r-II - I
{]~I
-=r.;
CHECJ<ED
DWM
PROJECT' CODE
NOV. G6
I NOV. D6
PROJECT 1\10.
AFPRDVED
J....
I NOV. 06
SCAlE (Al}
1:20. h10
DRAWING NO.
DG2
IREviSlON
!!Qmi
1. A~L QlH!M5l11NSARE IN I'tl.LtETRES UHLUS OUER\tI5! STATED
2.Al.L COtKRE1E SHALL IE GlW)E OPC 21 t$,ESS GlIQWlSf STATED
lYAAlA1lIl!lTOSTAl/DARODElALSAllEPEIUtT1EDTDHET$l'T!SPfClPlC
RUlUlJlDQTS
4. ALL .'S 8ETWfDt SEnlON$ Of GR1' LKWS SHlU BE LAHftAUD DYER
WITH 101... WIlE RE5tI R!H &LASS TAPE aRAM APPRO'40IlSlTU
BAlI)lGEJatn101HEOUtsIDO'1tf:IIPLlkERPIllOR10(OIKR1I~
S"A&.lJQteTSBElWEEMPlPES,fIlCtURESl/IIGRPlJfER5SH1oU.I!sw.m
,. AU JOItTSBtTWEEN PIPES AIeD ClIMtllfTE SHALL lIE WATEnlll11
1.ALLltll:otIIIGPFES5HAl.LIELAlDSDffITTOSOfFn~ITtiTHEOlITGOIItG
'PI
--E!1
;l
2H
MANHOLE DETAILS
j
PLAN AT COVER LEVEL
SECTIONC)
GRPSEALN3Pl.ATE
DOUIU!1RlANGllARIIlICTJLElRdtCQ'RR
&.fRAMEWITH'lSDlACLEARllPfNIcli
AMENDMENTS
REV.
BY
I DATE
CONSULTANTS
~I~
~I
DRAWING STATUS
~ ~~'V:toWRETE
TAltGNlIltlRANt&PflDTtnICN
e-..,.. . .
-,
II~
DRAINAGE AFFAIRS
GAPLlItNlTOllEPCllNUIIMRT
H1k6'rtf(NOIISLPSlA'ACE
P.O. BOX23337
TEL. 4950065
FAX. ...50555
IiiRl'LHHG10IlElHIN1I&!MVERT
MlN.6THCNllIISLPS\lFA,Cl
PROJECI
DEVELOPERS GUIDE
TITLE
:P=z
:m~~Rm
DRAWN
DATE
OM
SECTIONC)
I PROJECI CODE
NOV. 06
CHECKED
DWM
NOV. 06
I PROJECT NO.
APPROVED
JEA
l2Ve~~Y(~rsl~nr
CAD Rd. IJ\ClATAR-SiDS\0G3.dw9
NOV. 06
SCALE (AI)
1120
DRAWING NO..
D03
REVISION
!l!!lli;
lALLDltNSIONSARflNtlUlKETRfSUNlfSSOTHRWISESTATED
2.THlSORA\iWGTOSHOULDBEIlf:ADlNCONJUNCTIONWlTHDET.&I.SSHllWN
ON DRGNoLfS\fS2.fSJ"FSnl. FSZ4
3. All HATfJlIA1.S, FABRICATION AN:l CONSTflUCTlDN SHAll BE IN
ACCOROAN:EWITHTHESPttfICATlOHS
RESIMSPACEJl:TOSlJIT
lADDfRAl.IGNI'EHT
IHAJC.l00THIClO
STAlfrl.ESSSTEEL ANOJJR
BOLT BoTTCH FlXWG TO BE
MAXlHUKOFnSABDYE
BENCHING DR RfST PlATFOIltl
FlXlNGS TO SE AT 1500
CENTRESHAXt1tJH
S.FORTAItQNGDETAIlSREFERToDAGNil.GEU
Ii1lPSTRIUR
GAADEDPClSRElNfORCfD
D:lN:FtTE COVER SLAB
DETAIL
'.'0
DETAIL
1,10
C9
DETAIL
'110
DETAIL
1110
E9
DETAIL
1,10
E9
WHERE APPLICABLE
WHERE APPLICABLE
~
GRPLKll
JOtlTB(TWUNGAPllNERl.
PIPfTDBEllUlllATWOVER
WfTH RESIN RICH liUSS TAP'
SECTIONC9
SECTlONE9
BY
AMENDMENTS
REV.
DETAIL
1.10
OATE
CONSULTANTS
'c.J.
L!J
1..01
...
..
BEDDlllIiKATERlAl.AS
"'["'
DRAWING SfATUS
EADllIlIIiil1ADEUPFRoH
4No.SEGtlENTST5TIAOC
DETAIL
DETAIL
C)
~I
DRAINAGE: AFFAIRS
P.O. BOX 23337
TEL 4950066
FAX. 4950665
PROJECT
DEVELOPERS GUIDE
TITLE
WATERl'ADllftmlBRANE
COllAR IIlH.)OO WIlE
WATfRPROOFHEH!IRAHE'
COLLAR "If.3DO WIOE
TYPICAL MANHOLE
CONSTRUCTION DETAILS
4DI4IBlTUtIIIOUS
HASTlCAUET
STAItClITWATRPROOfKEHBRAI
STARCUTWItoTERPROOFI1EttIIRAN
WORKED ARllUPIJ PPf I UPPED
DETAIL
1,10
C)
WO.""'"
.!!l!!ll
DETAIL
1110
c:
.u...LIlJ..fJW
.EWilUII!fli
WDIlKe:PAltOUNDI'lPt:.UpptD
WlntCOlUA
DRAWN
OM
OATE
CHECKED
OW"
NOV. 06
Itt"
L:\OATAR-STDS\DG4.dwg
PROJECT NO.
APPROVED
JfA
NOV. 06
SCALE (All
1:20 &: 1:10
(AD
I PROJECT CODE
NOV.06
DRAWING NO.
DG4
IREVISION
1lQill,
1. ALI. DlM!t(SIO/fS ARl! IN InUMETltES UN.ESS OTIAWlSE: 11.1ID
2.111$ DRAWffG TO IEIllADfI H'ULIICTIDNWllttDRG Nu.FSlItfSt1
Sl.EEVEADAPllA
~I----'oo'1~"
,r
--.JL
fA.
fl.
'.1:; ;~.
'.
II~
:' ..
=
INSPECTION CHAMBER
LATtIlAlCOIIIIEl:TIOII
lDKAlItRWfR
(SUDR&Mo.FS11l
I'
BY
AMEI<DMENTS
REV.
I DATE
CONSULTANTS
PLUG
TEEORlIBLIGl.f;U
Afttmllwrntll[!I)
Sl.nYfJlIllIT
DRAWlNG stATUs
.GL
r:.lt:-;~
"._~':
INSPECTION CHAMBER
(SEE ORG No. FS8)
LAuaAL CONHR11l11l
Til HAlM$fW[fl
-=-r=ii~~~
....
DRAINAGE AFFAIRS
P.O. BOX 23337
TB.. 4950055
fAX. 4950556
PROJECT
DEVELOPERS GUIDE
TITLE
TYPICAL DETAILS
-DATE
DRAWN
OU
I PRllJEDT CODE
NDV.D6
CHECKED
DWM
NOV.D6
rPRdJEcr NO.
APPROVED
NOV. DB
JEA
SCALE
1
1:20
"tl[fR.'1 Ll\G'TAR-srDS\D05.dwg
DRAWING NO.
DG5
REViSION
.!!Qilli
2.ALLLEYllSAREIk~lRESTDQATARHAT101tAl.HElGIlTDi\lIl4
150
Qiiiii
JOO.
'00
...
."
""
~"I
,.
""
DAVlTSlKKET
DAVITFOIIlATlON
LEGEND,
lOO.t,OO.ttlIDEEP
P!tISIDROADUW.
fRC
EXTRAtTFAHIaPTlOICALTOOIXIURUlllTI
Fc-i
!!~~~~~~~WIT.~
~l~:r"TJ.~m:MH'O'
100lASItllRTRADllS
l~~Aftl~~~":\~------I-iH-
~
_
1I9DIUALOCOUPI.Ni
XI
~IiEDEDGE$
PlPES\lWORTSTO
UfM:EIlSAP!'ROVA~-""::::::::::t::::::-IK~~".~$:jjI/!=*",~~
0.. . . ~~~~~"'l,mI!iiliit'idll=!~$~j';.1i~
~I ii
--..J
TO
D1iCHARGE!'WfHOLE-t
SCREEDTIICXIPS
+ST50
IV
GAlP.:YALVE
f.
F1.AA'GADAPTER
'RY
,,*,"RETIMYAl.YE
j
~
=aa~T~;ll~t~
AcassLAIIllA
SID.51 iSI
DEEPSUHP
SECTIONE9
AMENDMOOS
REV.
BY
CONSULTANTS
,.
e-
~H'J=&7i'!
-,
DRAWiNG STA1US
WATERPROOFTAIlIOIIG
8OTIOHQFAllOORAC1PI'E
!i.t/iIlfoW/.umtL"
-,
DRAINAGE AFFAIRS
P.o. BOX 23337
TEL. <49500/15
FAX. _
2MDlAVCSEWR
~ 1:-:;""'''')[
I~jo<. I
SECTIONC9
IOTIICTAlfCNlHEMBltAII:
IJECT
OPCIOPROTECTIONSCFlfD
?.TII(IflC2IBLIN_
I
DEVELOPERS GUIDE
SECTIONE0
lITLE
TttELEYE.LCOffTROLPAtm.ISAl'PRGX.1111l7Ol1'fO
DATE
DRAWN
OM
OWM
NOlI. 06
APPROVED
JFA
NOV. 06
SCALE (AI)
1:50
Ci.D Rtf> 1.::\ctTAR:':-srDS\OOe.d*V
I PROJECT CODE
NOV. 06
cHECKED
PROJECT NO.
DATE
1!2.lli!
CLASSSt25CGY(R&FRAMETO---
surr,oa.taOCUAROPEHlN6
I
:
ml
!!I'
'"~
LTRAYflWlslt4S1l_50dALutlIItaA'tAIlllL[
FGlPA~"REA
s.~::.m6RP~MS~::La..~~:r'J.V&lHGAIlOCASTlNSrTU.
AllOOERHALfA(ESTO!ElAtm
~\:l~t/NrTOlKGRP'-_--~:tiii--0o1'"i1l
f~--:----------l
I
I
I
I
L._
~,
7-
I
J
:iI, '~ I
:=:~:.::..
.JI
~I
.' ,
"t" .1,..~
~.
7.fDIITAIIIlIt4GDElAUREFERTDDR&Nll.F14
~t
LEGEND,
FGL
ROOF PLAN
F1JISH!OGRllUN9LML
15'
II--J!.
SECTIONE9
II
"'' -..
:.~,
..--.: . . ~~::"'::~ ;.
,-
;~:!
,:',-1
i'.-
:::," ':~:'J:.::'
I
I.;; ',?
I
-
/J~:L
E1-~~F-
:'".
....
:~:.;......
i;I1::~/'
.
8
'fIftllOO
II!
.. ....-_.;.J
ti+-
-l-_
.:.
il
'"
""I~';,:~
1''''~''''''_
'I - - - II
f-:~:-:"1.lI-';"'~'-:-1,', -----r--n
.I
--,
:"':I~
/: ;~'I; :.;
'II
AJ9'MlIH'''H5IIOVIR
~J!
Y
51.
~'it~lll:OlIIlSE
\;:,:::(/.;
"12
fQLPA'SPAIIEA
-- -_:
---
.. 1
....
"/.'(
R!.V.
AMENDMENTS
~W~~
CDIRTECLAss'C'
5[llf:m1O~9TtlK
DRAWING STATUS
SECTlONC9
"'.
,.. I.!"
...
""
DATE
frf
CONSULTANTS
DRAINAGE AFFAIRS
p,o, eOX23337
TEL, 495D055
;fJRPLADDtRIOLTr:D
FAX. 4950556
PRo.JEcr
,~,,~
1t1\
Iv
~":1~
15fDlAllUTfIPE
"
II
DETAIL
'
I'
,",=I-:-=:J--;-1--'
~I
1SDtlAaunnPPE
SECTIONE9
SAND TRAP
(LARGEI
C)
DETAIL
"',
>~',' ~; ~ ;':,,',:"
ul".fI5SUHP
I :.~
",!
:; "
~t .li:t1":;1
~I ii!....J
prl!fQ!lATfpgRugTBAY
TAAnrpyfAMK6lrQ IH 4J!IH!tIft.tl
E9 ;r
.Il.IIllli.IlIl
[tJ .[[J
PLAN
PLAN
GREASE TRAP
DEVELOPERS GUIDE
TITLE
DRAWN
OM
CHECKED
'1 DATE
NOV. DB
PROJECT CODE
D6
PRo.iECT--NO.
APPROVED
JEA
I NOV. OB
SCoIL (AI)
1:20 at 1:2
DRAWING NO.
DWM
I NOV.
DG7
IREVISION
1!!!I;
1. All DIMENSIONS ARE IN HILLIHETRES UNLESS OTHERWISE
STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1(OAT OF
BITUMINOUS EMULSION AN[) 2 (OATS OF BITUMINOUS PAINT
1 All FITTINGS TO 8E STAINLESS STEEL
4.
"'"
.~
"'" I ~I
'I
1350
1185
I,
'1
,'"'.1I
'I
I.:
I.
I
I
I
I
I
-$$=t==-~t
~...
r-----------
----l
I
I
1
1
':JI
-~
I~
L_
L_____________ _
I
I
I
I
I
;!'
DOUBLE T'
GRADE'
COVER.
675DIA
SECTION A-A
MDUTY
LE
REV.
T12@l
15
0,
;iSl
I /'
"
N'
>:
0
'r,~,
BY I DATE
AMENDMENTS
CONSULTANTS
"1
T12@l1501\
~, ~
fA
DRAWING STATUS
T16@l150~
~T16@l150
T16@l150
DRAINAGE AFFAIRS
P.O. BOX 23337
~~.
~.
FALL
!WL
TEL 4950055
FAX. 4950555
PROJECT
T16@l15O
SEWERAGE
STANDARD DETAILS
JY
ml
SECTION C-C
SECTION B-B
TANK DIMENSIONS
LENGTH (L)
(INSIDE)
WIDTH (WI
(lNSIDEI
BASE THICKNESS
H
WALL T~I(KNESS
DIM X
nOlO
lOOO
1000
l50
l50
150
1no 20
4000
1300
l50
l50
200
TYPE
PERSONS
SERVED
'DRAWN
DAlE
JM
CHECKED
JAN. 14
RK
JAN. 14
PROJECT CODE
PROJECT NO.
APPROVED
SN
SCAlE (AI)
1:25
".DRtf: L:\QTOOl29\OGB.GA &: RC.aw,
JAN. H
DRAWING NO.
DC8
IREVISION
./QlliJ
1. ALL Qn'lENSIONS ARE IN MILllf1ETRES UNLESS OTHERWISE
STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1COAT OF
BITUMINOUS EMULSION AND 2 COATS OF BITUMINOUS PAINT
.:
'W'
.'';'
I
If----::l
-tf;! /=:$...
'.
0'
;",'
0'
"
r-
PERSONS
SERVED
lENGTH III
(INSIDE)
WIDTHIWI
(lNSIDEI
BASE THICKNESS
H
WAll THICKNESS
T
21 TO 40
4150
1600
500
400
300
41 TO 80
6000
2000
600
450
345
81 TO 100
6500
2150
600
500
375
101 TO 3S0
9150
2500
600
600
650
DIM X
:=
T12@11S~
l-
"r-
REINFORCED CONe.
GRADE OPC 30 IN _
WAll & BASE SLAB
kR
~o:;
:>:
JB
--!-
/ ' f-
116@1~~
116@115
I
!"-
I-
bI'-'
b-
T20@llS<l'
6 x 200 STAINLESS
STEEL SCUM BOARO
116@11
&-
lJ...-DETAI 1
/---f46@11S0
0
0
N
0
116@11 0
~T20~
If"'
.'I .
TEL 4950055
K' '-.
.'
-.
. ' '"
Ix
I-s
SEWERAGE
STANDARD DETAILS
.~".
".
11TLE
..
~j'"
PROJECT
".
FAll
4'". ~~.
II
T20@l1So-"
300
SECTION B-B
DRAINAGE AFFAIRS
.',dj.
'.
011
m@lll
.'.
'.
L1<o
II
(ONCREl
BLINDING lA
r- ~O@l150 STEEL
ANGLE
75'15STAI;~
..
..
W~
I-
T20@l151\-..-I'116@115
PRECAST CONCRET
GRADE 5RC 30 WEIR
SCREED TO FAll
MIN. 25 THICK
DRAWING STATUS
SCALE 1:2
I-
SECTION C-C
DRAWN
J"
DATE
SCALE 1:10
RK
JAN. 14
..,. ..
~.~
PROJECT NO.
APPROVED
SN
JAN. 14-
SCAlE (AI)
1:25.1:10 AI: 1:2
PROJECT CODE
JAN. 14
CHECKED
DETAIL 1
,.... ". ,.\ ..............."\""'0,.'"
DATE
150
"-
BY
AMENDMENTS
REV.
CONSULTANTS
rA
--1-1
;<
I
I
TYPE
T12~1
I~
1..:: _ _ _
I
I
L_ f-----------------------~
SECTION A-A
TANK DIMENSIONS
lL
0-
:".-
i~
l_~~J
.''':
I~I
I
I
- ~-
1000
,------------------------,
0.
AS
INLET PIPEWORK
0-
1'1 ".
.I, ";,'
1<.
C1
...
..
DRAWING NO.
DG9
rEVISION
mill;
DlAVARlES
__ L_
".'
//"
IlUHlESSOtTAlILDlDltfRWlS!.Au.IIf-Sl1VCDNC:RETESHAlLlEGRADl
aPCIOAIOAllPIlECASTCDNCRETESHAllSEG!WlCPC
~\
I
\
I
I
---{
L--J
/"-.....
mIOOB
. I
una
~I
\11
"'.UDB
II
'., I
'"
... .....,,,
-.J
II'o/f
V Ar-+-f'--l'- "~1'"
I
!iI.f
fltlClMntT
T
flfXlBlfJoftT
VPTOJlO
'DDHAXftUM
300-"10
~DHAXJMuH
OvtR,"
6tD HAXHlK
SIOKAXr.llHfRDH
.'os,_
m1008
"
....... _
~
I
-1--
,'"
"
"~I'"
-'1- I
no-tloe
I
PLAN
P~::~f::~:'~"
=,
I
:r:1
1tOHCIIUPROTEtTIOH
II AIlHlilf LAYER (If TANdili III ACCORDAIICE WITH SP!CAlIONCLAUlE'
2H1" SHALL ~E APPlED TO AlL EXTRICAL MFAtES
8UILDIMG Tt\lIt'J&l$TlluCTURtS
_..L
.\
>'
"~UDB
.... " ,
_r~:=1--L_
---+~--I
"
~~-::d3t:~_--
.VSPACm
""
SSTA6f&AEO
-+-
L-!"l
ii I .
"
II
SECTIONC)
R<V. I
BY I DATE
AMENDMENTS
CONSULTN-rrS
675111500UBLEITRlAMGULAAOUCTL!
IlOHCOVEAI.RUJt;W'rTH''lSDIA
Q.EARqI'ENM
COIICIlETEttAIIIOilillADE511C2I
\11IlHBlTUHEHPA'tTFN5tI
DRAWiNG srATUS
lilWESIlC)6PRECAST
COltCRET'fCoYEIlS1AII
.TEllRA!ltfDLtIEDOVEIlTITOP
OFCRUSttEDSrtNS~
DRAINAGE AFFAIRS
P.O. BOX 23337
m.4950056
FAA._
PROJECT
J...I
...::........:J:~~yc:f:!UCtlAHBfR
o
n.....a
.!.~~~~=.~.n~.r:~~~_"!!'.
DEVELOPERS GUIDE
I II
Cl
1II
..... 1
I TITLE
SOAKAWAY DETAILS
CAIISHlDSTDII:SlIlRDllG'7!ruI
SlkWSlUWlTHlllTLEllUlOflNES
~I
a/:;J~(;;'ili*';M$i{'~
;!'-w
:J;iW
j!:!1
til
~;
~
GAADEIIl(JlCOltWTIJ,AH
BI.OtDlIIGCDIlCIlETE
DRAWN
OM
DATE
PROJECT CODE
NOY. 06
CHECKED
OWM
STANDARD SOAK'AWAY
WITH CONCRETE BASE
tAi'-A." L:\QA'rAfi=.STDs\D01D.clflll
liIWlESRCHColitRETBAsE
BLllIIl1tliCOIltRtTE
STANDARD SOAKAWAY
WITH CONCRETE BASE RING
NOV. OB
rPROJEClNO.
NOlI. 06
APPRovED
JEA
SCALE \A~""
0010
.llDilll
tALLDIHENSIOflSAREWrtwItEmESLN..ESsoTHERWISESTATED
2.CONCllETE
a)UNLESSOETAlllEll0TtAWlS.AUIt-SITUCON:1lETfS1fAU.8fCilAOE
OPaOANO AlL PREtASTCONCRETE SHAll BE WDE OPtJa
3.CONCAfTEPflOncnoN
II ASHGLE LAYER OfTANOlCiNACCORDoUlCEWlTHSPEClfICATIONCLAI
20_~1.G6 SHALL BE APPLED TO AU EXTERHALSURFAW
bIALt.IfTERNALSWA(fSEXCEPTEPO)(yI1Oll:URCOYEREDSlRFACU
D1AVAAES
/,--.
--
.......
"-
'\
I/ _
~T
\
\---~--:-:.:
:-:r.:---:
I
----
, '-
/
I
--1--
121-11108
{ B\\
;:7
-8
7/
~::a-~
--4.--\
\.\~
I
I
Fl,EXIlLEJOINT
1
'I5011AX!HUH
OPT01DO
:6'1
)1)lI-GtIo
300HAXI1UH
6QOKAlCtIUH
~
\I~T20-."
II'.. I I
no-ta" \
/I
~ -J
/7
--=="-r-::.-~-9
,/
no-1IIOB
\1/-
--
10 125 B
""
i'
/
'.......
/.~=+=~
,17
--1----1---
lit
"-
//
4. BUlllIlNGTHROOliiSTRUCTlIlS
;1\
COATSOF8ITUMfNPAINT
IllONSTEPSTOBSl14TSPACEOAT)OD
nlWOB
126-100B
PLAN
SECTION C-C
COVER SLAB FOR SOAKAWAY CHAMBER
REV. I
BY I DATE
AMENDMENTS
CONSULTANTS
11
l!
CUSS81Z5 "4NI1IlI.f
COVER I. fRAJ1E TO 5UlT
8SEN11l,CLASS04CIOWlTH~
IlSDIAo.EAlIllPENING
PItECASTtDNtRrnCOVEA
SLAB U5aI THKK WITH
lSOJ:UOClEAAOPENING
y<;,
WlTHBlTUHENPAlNTFlNSH
jf~~""''''''C'"''''"'UIlOl
.....
".1
GRPLIlIHG.
Y:~-'
-1
---]
;[
DRAWING STATUS
1COATOFBlTUl"IHDll5
D1UlSION&.ZCOATSOF
BlrutltlOUSPAlNTTOlNTEANAl,.
,g~mH"
l-EXTEANALSURFACfS
o
o
PAE-CASTCONCRTE
OW18ERRlNliS
I
I
".
==E~
(OUALlVSPAaoAT
UCHlYEL,VERTlCAL
".
II
S~UIlD
. ~"'~;;.
....,:""" i
~.::~.~
VARS
l;
mtE
l!I . :::
1SIIIIITKUSRC151lLJr10~
DEVELOPERS GUIDE
(Ehr!".,l Pi:
250 mocfilIAtMAR
7$1111 SINGLE SIZE WITH
STEP IRONS
~,
..I
-E=tt---~~
~;~::j).
<:~;).I
;;1
STORMWATER
TYPICAL CATCHPIT a: SOAKAWAY DETAILS
DATE
DRAWN
OM
SOAKAWAYICATCHPIT ARRANGEMENT
SECTION A-A
SECTION B-B
PROJECT CODE
PROJECT NO.
JAN. 07
CHECKED
JAN. 07
DWM
APPROVED
JEA
JAN. 07
SCALE (Al)
CADR." L:\QATAR~S1DS\OG'l.clwg
FAX. 4950555
PROJECT
t-.!!!.-
SrAGCiEJl[l)SvtllTRlCALlY(
lO... Ttl:KSRCZOBA5:E
TEL. 4950055
lOG
""
5hI111PfllFORATUlNS
:~~~O.=~
DRAINAGE AFFAIRS
-0
,""
DRAWING NO.
0011
IREVISION
.!:!.Qlli:
lJ.lllllHttlSlONS AAZ IN Hlli1ETRU Utfuss lIll1ERWlSfSTllEO
l.CoIlCIlfTE
al IiHUSS OETAULEO OTHfRWISE, All ""mu eONCAIn SltALL II[GRAlIE
Of'UOAhtlALLP/ICASTCOHCRn5HALLBEGRAt!OPC)t
J.col:llmPROUClJON
DlAYAIlS
",.,...--,
/
~T
IRIJNSupSTOeS12,1,1Sf>ACEOA130C
tEKTERSI'\OIllIOkTAll'fAIlDYER1[,\llV
......
"-
"'\
\
/11
\J
__~-i-~
" I __
I _
\
--
---.f--------"
?-___
.=rY
/
'\
"
1",.../
--1--
11
'"
I
-9//#
,.
FlEXll\lEJOltfT
FLEXl:tJOIl(T
~GlIHAXlHliHfRl1
lliI"AXtlUH
flRSTJoI!(T
~t,%~~R
)HKAXItlH
FlRST)lIINT
'1!>l1HIICHUKANlI
Tl~""
[J
OVER6DO
2:~PIPEDl,tMmR
6GaHlXlItlH
HAXlHU'MfROH
FRST JOINT
ut-jooa
..!j
ft:Y1
~"-----------------~~=i~~
-+J~l~
'
+.--/
I
)"-40~
"':::::..-.J.
-..,.-;;:..~
I
UPT031G
4"TZSB
~
-
PlPEDlAI",ETtn
'"
/
............
--i------~'\~il
~
4. l\UlI.OlNGlHIWUl!tlSTROCTlmES
/.~;:-+!~~
,;(/
1. 7
/,1
\\- - - -
+8
1.
no-1MB
nG.lt;B_~_
'"
UD.""
I~
PLAN
~
>If
~I
I.
I,~
VARIES
L......J
opdiiKG
,n
L~tJ"
401
SECTION A-A
REV.
AMENDMENTS
BY
DATE
CONSULTANTS
LlGliTDlfTYCGVERANDFRAHE
eStllTZ4UASSOloOOWntl
4'1501AClEAROPfHtlli
:l
OR!oWING STATUS
<~
~",I
I'-(;~
:';':'~:::_~~
!i
:~ .:~~:~SlAIlGRADEOPOO
"\-':;";I.MAS5COHCllnEBASE
S4THK!'lEHBIW!E
PROTECllOkGRADESR'24
~'H(BL.ttOikG
CiRAOESRCN
I'rmf
~
".
';".:-,
I--r--I:,l '..
DRAINAGE AFFAIRS
p;o, BOX 2J337
TEl. 4950055
FAX. 4950555
PROJECT
DEVELOPERS GUIDE
TITLE
":":'.(
""""''''''''A''~ttr
{:~
J'M
VARIES
~~:; ,~~.':f
~i
Il!
:.~\~~::~:I
STORMWATER TANK
SECTION A-A
I~
JAN. 07
PROJECT CODE
OM
CHECKED
-OWM
I JAN.
07
PROJECT NO"
APPROVED
JEA
I JAN.
07
DRAWN
sCALT(A-,)
1:20
C"'PI,r,
l;\QATAR-~DC12.d'l'l9
DRAWING NO.
0012
IREVISION