Construction of Remote Aircraft Partking at Tribhuwan International Airport
Construction of Remote Aircraft Partking at Tribhuwan International Airport
SECTION
1.
2.
PAGE
PROJECT SUMMARY....................................................................................................3
1.1.
1.2.
3.
4.
5.
6.
SAFETY REPORT..........................................................................................................9
7.
8.
9.
TESTING REPORT.......................................................................................................10
ANNEXURES
ANNEXURE A CONTRACTORS DOCUMENTS
ANNEXURE B PLANNED PROGRESS
ANNEXURE C RECORDS OF LABOUR, EQUIPMENT AND WEATHER
ANNEXURE D SAFETY REPORT
ANNEXURE E SUMMARY OF TEST MATERIALS
ANNEXURE F ENVIRONMENTAL REPORT
ANNEXURE G CONTRACTORS FACILITIES REPORT
ANNEXURE H UPDATED CASHFLOW
ANNEXURE I PHOTOGRAPH REPORT
1.
PROJECT SUMMARY
1.1.
Executing Agency
Funding Agency
Engineer
Contractor
Contract Amount
Original Contract
Period
2 years
24th Jan,2016
Agreement Date
Commencement Date
Actual
commencement date
Revised Completion
Date
March,2016
Delay due to site location change and design review
NA
Time Elapsed
1.2.
COMPONENT A
A00: GENERAL REQUIREMENTS
Supply of all the items of A00: General Requirements related to Employers/Engineers facilities.
Insurance for work, third party &contractors equipment and labor was issued on 05/06/2013.
On 26/06/2013 it was carried out a visual inspection of the runway with AYESA, Employer and
Contractor.Pavement Evaluation and Field Works (HWD, GPR Test) were carried out in July. All
surveys, tests, coring works& evaluation activities had been accomplished. Additional coring works
was being conducted and accomplished for the Evaluation & Design of Pavement Works.Revised
Final Report and revised BOQ were submitted.
Office Refurbishment works was accomplished.
The construction of Car park Concrete Pavement & Roofing works was accomplished.
Laboratory Building construction work was accomplished and Engineers LaboratoryEquipments
were supplied accordingly. New lot of equipment was also delivered to the Laboratory.
Improvement & maintenance of temporary roads, temporary fencing works, etc. have been in
progress since the commencement of the project.
Environment Management activities have been conducted simultaneously with the construction
activities since the commencement of the project.
Safety & Security Management activities have been conducted simultaneously with the
construction activities since the commencement of the project.
QA/QC tests have been conducted simultaneously with the construction activities since the
commencement of the project.
COMPONENT B
B01: INTERNATIONAL TERMINAL BUILDING
COMPONENT C
Contract finalization work was accomplished with sub-contractor regarding the Works at RARA
&Simikot Airports (except Terminal Equipment).
MAS was submitted to the Engineer for approval (except Terminal Equipment).
2.
Please find attached Annexure A with the status of correspondences between Contractor & Engineer
during May 2014. Attached Annexure B depicts the monthly work progress summary and next months
work plan with respect to the Projects Revised Baseline Schedule.
3.
S.
N
1
2
3
4
5
6
Material
Cement
Sand
Aggregate(20mm)
Stone
Machine made Brick
(Class A)
Machine made brick
(class B)
Unit
PreviousMont
h Stock
Delivery
bag
cum
cum
cum
3027
75.1
48.21
238.15
2280
167.84
42.4
64
no
11543
no
177320
16000
May-14
Consumptio
n
1367
97.226
86.42
59.5
Remarks
Net Stock
3939
145.714
4.19
242.65
1581
9962
88111
105209
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
4.
Geotextile
Rebar
8mm Dia
10mm Dia
12mm Dia
16mm Dia
20mm Dia
25mm Dia
GI wires
7 SWG
10 SWG
12 SWG
FillMaterial(CBR>5%)
FillMaterial(CBR>15%)
HDP pipe 200mm
HDP pipe 315mm
HDP pipe 355mm
RCC pipe 1200mm
RCC pipe 450mm
RCC pipe 900mm
PVC Pipe 150mm
Filter Material
Gravel
Sub base
Base
Stone Dust
sq m
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
cum
cum
m
m
m
m
m
m
m
cum
cum
cum
cum
cum
17531
122590.76
6959.14
2026.2
41611.72
25924.7
5595.2
40473.8
5498
1001
3996
501
56054
6055
3053
159
693
112.5
64.5
13
9
923.74
323.26
98
36
4486.1
5009.2
57900
71760
35
40
5
28.5
35
42.5
7.5
979.907
446.79
73.47
37.16
423.396
207
17433
132050.06
6959.14
1990.2
46097.82
30933.9
5595.2
40473.8
5498
1001
3996
501
42194
6055
3018
159
653
142.5
78.5
20.5
9
923.74
286.1
556.511
239.79
73.47
S.
N
TYPE
Labour Day
Delay in Removing
existing facilities
Local Problem
DESCRIPTION
Site Remain Closed for
International Labor day
Runway excavation work at
existing Optical Fibre Line
section was halted due to no
shifting of cable.
Compaction of road was
disturbed at chainage 1+000 to
1+100 due to disposal of dirt
REMARKS
DATE
TOTA
ARE
L
FRO
A
TO
DAYS
M
ALL
A03
A03
Delay in Removing
existing structures
Rainfall
Rainfall
A03
A03
A03
A03
A03
12
12
ALL
23
23
A03
25
29
Change in design
Delay In
decisionMaking
Strike
bycrushercompa
nies
5.
6.
SAFETY REPORT
Please find attached Annexure D with the Monthly Safety Report ofMay 2014.
7.
8.
Etc.
9.
TESTING REPORT
Please find attached Annexure E with all the testing reports carried out during May 2014.
Preparation of temporary site access roads/routes,fences,gates & facilities in progress as per site
requirements
Formation fill(CBR5%) compaction works.
Settlement plates installation works.
Drainage system and culvert works.
Transportation of embankment filling materials at site.
Gate Lounge