CONSTRUCTION OF REMOTE AIRCRAFT PARTKING AT

TRIBHUWAN INTERNATIONAL AIRPORT

MONTHLY PROGRESS REPORT


MAY 2014
ICB 01: AIRSIDE INFRASTRUCTURE & LANDSIDE
TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA
AIRPORTS

SECTION
1.

2.

PAGE

PROJECT SUMMARY....................................................................................................3
1.1.

OUTLINE OF THE PROJECT.................................................................................3

1.2.

STATUS OF WORKS TO DATE..............................................................................3

CONTRACT PROGRESS SUMMARY............................................................................6


2.1.

ACTUAL PROGRESS AND PLANNED PROGRESS.............................................6

3.

MATERIALS MANUFACTURING& DELIVERY SUMMARY...........................................6

4.

CIRCUMSTANCES AFFECTING PROGRESS...............................................................7

5.

RECORDS OF LABOUR, EQUIPMENT AND WEATHER..............................................9

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

6.

SAFETY REPORT..........................................................................................................9

7.

QUALITY ASSURANCE REPORT.................................................................................9

8.

SAFETY & OPERATIONAL TRAINING..........................................................................9

9.

TESTING REPORT.......................................................................................................10

10. ENVIRONMENTAL REPORT.......................................................................................10


11. CONTRACTORS FACILITIES REPORT......................................................................10
12. PLANNED ACTIVITIES FOR THE FOLLOWING MONTH...........................................10
13. UPDATED CASH FLOW SCHEDULE..........................................................................11
14. PHOTOGRAPH REPORT.............................................................................................11

ANNEXURES
ANNEXURE A CONTRACTORS DOCUMENTS
ANNEXURE B PLANNED PROGRESS
ANNEXURE C RECORDS OF LABOUR, EQUIPMENT AND WEATHER
ANNEXURE D SAFETY REPORT
ANNEXURE E SUMMARY OF TEST MATERIALS
ANNEXURE F ENVIRONMENTAL REPORT
ANNEXURE G CONTRACTORS FACILITIES REPORT
ANNEXURE H UPDATED CASHFLOW
ANNEXURE I PHOTOGRAPH REPORT

1.

PROJECT SUMMARY
1.1.

OUTLINE OF THE PROJECT


Contract Name

Executing Agency

Construction of Remote Aircraft Parking at TIA


Civil Aviation Authority of Nepal ,
Civil Engineering Division

Funding Agency

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

Engineer
Contractor
Contract Amount

TUNDI/LAMA/SAMNANTAR JV,Sanepa Lalitpur


34,34,69,972.64 NRs

Original Contract
Period

2 years
24th Jan,2016

Agreement Date
Commencement Date

25th Jan,2016 according to contract

Actual
commencement date
Revised Completion
Date

March,2016
Delay due to site location change and design review
NA

Time Elapsed

1.2.

STATUS OF WORKS TO DATE

COMPONENT A
A00: GENERAL REQUIREMENTS
Supply of all the items of A00: General Requirements related to Employers/Engineers facilities.
Insurance for work, third party &contractors equipment and labor was issued on 05/06/2013.
On 26/06/2013 it was carried out a visual inspection of the runway with AYESA, Employer and
Contractor.Pavement Evaluation and Field Works (HWD, GPR Test) were carried out in July. All
surveys, tests, coring works& evaluation activities had been accomplished. Additional coring works
was being conducted and accomplished for the Evaluation & Design of Pavement Works.Revised
Final Report and revised BOQ were submitted.
Office Refurbishment works was accomplished.
The construction of Car park Concrete Pavement & Roofing works was accomplished.
Laboratory Building construction work was accomplished and Engineers LaboratoryEquipments
were supplied accordingly. New lot of equipment was also delivered to the Laboratory.
Improvement & maintenance of temporary roads, temporary fencing works, etc. have been in
progress since the commencement of the project.
Environment Management activities have been conducted simultaneously with the construction
activities since the commencement of the project.

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

Safety & Security Management activities have been conducted simultaneously with the
construction activities since the commencement of the project.
QA/QC tests have been conducted simultaneously with the construction activities since the
commencement of the project.

A03: RUNWAY EXTENSION


The detail survey of runway extension was completed and submitted.
Borehole works accomplished in A03 area.
Preparation of temporary site access roads/routes,fences,gates & facilities in progress as per site
requirements.
Demolition works in progress as per site requirements.
Clearing & Grubbing and Topsoil removal (Stage-1) works were accomplished.
Disposal of cleared materials work was accomplished.
Verification of U/G / buried cables location under Airfield Lighting System was carried out.
Drainage System works in progress with respect to new design received from the Engineer.
Additional Sub-Surface Drainage works also in progress.
Excavation works accomplished for Runway Extension Area 1. Extra excavation works in progress
due to unsuitable soil encountered. Trial laying of Geo-Grid materials in progress.
Formation Fill (CBR 5%) works in progress.
Optical Fibre Cables relocation & installation work was accomplished.
Shifting of threshold withPAPI calibration work was accomplished.
Arrangement of Temporary Airfield Lightings works in progress as per site requirement.
Security Building construction activities in progress.

A04: PARALLEL TAXIWAY AND INTERNATIONAL APRON


The detail survey of the Parallel Taxiway and International Apron was completed and submitted.
Temporary fencing was carried out at the side of Army Officers Golf Club.
Cutting of trees and branchingwas accomplished.Borehole works was accomplished in A04 area.
Demolition works in progress as per site requirements.
Clearing & Grubbing, Topsoil removal works in progress.
Disposal of cleared material is in progress.
Transportation of embankment fills materials at site in progress.
Trial compaction work was accomplished.Formation fills (CBR5%) compaction works in progress.
Installation of settlement plates in progress.
Preparation of temporary site access roads/routes,fences,gates & facilities in progress as per site
requirements.
Drainage System works in progress. Some additional Sub-Surface Drainages works also in
progress.
Slab Culvert works in progress.

A06: POWER SUPPLY (P1,P2& GENERATOR)


Contract being signed with sub-contractor and documentation works in progress.

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

A09: WATER SUPPLY SYSTEM


Contract being signed with sub-contractor and documentation works in progress.

A10: INCINERATOR FACILITIES


Contract being signed with sub-contractor and documentation works in progress.
Engineers Factory Acceptance Test (FAT) was successfully accomplished.

A11: FOAM TENDER


FAT & Factory Training at Manufacturer Place was accomplished successfully.
Vehicle had been alreadyhanded over to Client after successful training & SAT at site.

A12 8: ACCESS ROAD OF ITB EXPANSION AREA

Clearing and Grubbing and Topsoil Removal works were completed.


Borehole works and cutting of trees were accomplished in A12-8 area.
Preparation of temporary site access fences, gates & facilities was accomplished.
Construction of S3 building was accomplished.
Subsurface drainage work was accomplished. Surface drainage system works in progress.
Soak pit construction work was accomplished.
New water tank soak construction works in progress.
Retaining wall works at left & right side was accomplished. Filter fabrics materials filling work was
also accomplished.
Construction of Store S1&S2 platform & installation of 6 containers was accomplished. The shifting
of existing store materials into new containers was accomplished.
Trial compaction was accomplished for Access Road.Along CAA Road - Formation fills (CBR5%)
compaction work, subgrade surface preparation work, subbase & base preparation works were
accomplished and hence the road has been opened as temporary diversion road.Along ITB Road Formation fills (CBR5%) compaction work, subgrade surface preparation work, subbase& base
preparation works in progress.
Demolition of Quarter Building, Guard House& existing Canteen Building was accomplished. Guard
house was shifted temporarily in the new S3 Store Building.Canteen was shifted to the temporarily
arranged place.
Construction of New Canteen Building (First Floor) was accomplished.
New Guard House construction activities in progress.

COMPONENT B
B01: INTERNATIONAL TERMINAL BUILDING

Survey works&Borehole works were accomplished.


Preparation of temporary site access fences & facilities was accomplished.
Clearing & Grubbing work was accomplished in Gate Lounge & Baggage Claim Areas.
Cutting of trees was completed.

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

Area. Construction of storm water manholes in Baggage Claim Area in progress.


Trench excavation work was accomplished to locate the buried cables/pipes, etc. Shifting of existing
sewer pipes was accomplished.
Plate load tests were accomplished.
Construction of Retaining Wall at Arrival Baggage Claim Area is in progress.
Construction of manholes work in progress at Arrival Baggage Claim Area.
Structural foundation worksat Gate Lounge Area in progress.
Staircase demolition works in Gate Lounge Area in progress. Other demolition works in progress as
per site requirements.

COMPONENT C
Contract finalization work was accomplished with sub-contractor regarding the Works at RARA
&Simikot Airports (except Terminal Equipment).
MAS was submitted to the Engineer for approval (except Terminal Equipment).

2.

CONTRACT PROGRESS SUMMARY


2.1.

ACTUAL PROGRESS AND PLANNED PROGRESS

Please find attached Annexure A with the status of correspondences between Contractor & Engineer
during May 2014. Attached Annexure B depicts the monthly work progress summary and next months
work plan with respect to the Projects Revised Baseline Schedule.

3.

MATERIALS MANUFACTURING & DELIVERY SUMMARY


Throughout the month of May 2014, the materials delivered at site are summarized in table below:MONTHLY STATUS OF MATERIAL AT SITE

S.
N
1
2
3
4
5
6

Material
Cement
Sand
Aggregate(20mm)
Stone
Machine made Brick
(Class A)
Machine made brick
(class B)

Unit

PreviousMont
h Stock

Delivery

bag
cum
cum
cum

3027
75.1
48.21
238.15

2280
167.84
42.4
64

no

11543

no

177320

16000

May-14
Consumptio
n
1367
97.226
86.42
59.5

Remarks
Net Stock
3939
145.714
4.19
242.65

1581

9962

88111

105209

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

7
8

10
11
12
13
14
15
16
17
18
19
20
21
22
23

4.

Geotextile
Rebar
8mm Dia
10mm Dia
12mm Dia
16mm Dia
20mm Dia
25mm Dia
GI wires
7 SWG
10 SWG
12 SWG
FillMaterial(CBR>5%)
FillMaterial(CBR>15%)
HDP pipe 200mm
HDP pipe 315mm
HDP pipe 355mm
RCC pipe 1200mm
RCC pipe 450mm
RCC pipe 900mm
PVC Pipe 150mm
Filter Material
Gravel
Sub base
Base
Stone Dust

sq m
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
cum
cum
m
m
m
m
m
m
m
cum
cum
cum
cum
cum

17531
122590.76
6959.14
2026.2
41611.72
25924.7
5595.2
40473.8
5498
1001
3996
501
56054
6055
3053
159
693
112.5
64.5
13
9
923.74
323.26

98

36
4486.1
5009.2

57900

71760
35
40
5
28.5

35
42.5
7.5

979.907
446.79
73.47

37.16
423.396
207

17433
132050.06
6959.14
1990.2
46097.82
30933.9
5595.2
40473.8
5498
1001
3996
501
42194
6055
3018
159
653
142.5
78.5
20.5
9
923.74
286.1
556.511
239.79
73.47

CIRCUMSTANCES AFFECTING PROGRESS DURING MAY 2014


DISTURBANCE

S.
N

TYPE

Labour Day

Delay in Removing
existing facilities

Local Problem

DESCRIPTION
Site Remain Closed for
International Labor day
Runway excavation work at
existing Optical Fibre Line
section was halted due to no
shifting of cable.
Compaction of road was
disturbed at chainage 1+000 to
1+100 due to disposal of dirt

REMARKS
DATE
TOTA
ARE
L
FRO
A
TO
DAYS
M
ALL

A03

A03

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

water by local public.

Delay in Removing
existing structures

Road construction work couldnt


carry out from chainage 1+120
A03
to further due to existing fence
and well.

Rainfall

Construction work couldnt


carry out due to rainfall of 1
May to 5 May. Pavement works,
embankment filling works,
structural works and drainage
ALL
works were all affected by rain.
Sub surface drainage works
were covered with mud up to
1.5m.

Rainfall

Concreting of bed of RCC box


culvert couldnt started due to mud
deposited on PCC slab.

A03

A03

A03

A03

A03

12

12

ALL

23

23

A03

25

29

Change in design

Delay In
decisionMaking

Concreting of bed of RCC box


culvert was stopped due to no
decision regarding change in
dowel bar.
Installation of reinforcement for
RCC box culvert was stopped
due to pending decision
regarding concreting of bed.

Concreting of bed of RCC box


9 Rainfall
culvert couldnt started due to
mud deposited on PCC slab.
Demolition of brick soling and
brick linning work (3.3m width)
10 Change in design
in drain RE-1a for installation of
HDP pipe.
PCC/RCC concreting works,
Masonry works couldnt be
carried out due to shortage of
sand.Problem in transporting
11 Strike
stone ,sand ,filter and gravel
materials from different source
to site due to strike by crusher
plant / Quarry Business
organisation .
12 Unsuitablegroundcon Excavation and levelling of
dition
runway (60cm depth) couldnt
carry out due to weak moist
black clay soil in runway from

Strike
bycrushercompa
nies

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

chainage 3+240 to 3+320.


Site Remain Closed due to rain
fall and high moisture on
existing surface. Sub surface
13 Rainfall
ALL
26
28
3
drainage works, embankment
filling works, structural works
were all affected by rain.
The various circumstances affecting construction activities frequently (till 31May2014) will surely impact the
project to delay by 3-4 months.

5.

RECORDS OF LABOR, EQUIPMENT AND WEATHER


Please find attached Annexure C with all the Records of Labor, Equipment and Weather ofMay 2014.

6.

SAFETY REPORT
Please find attached Annexure D with the Monthly Safety Report ofMay 2014.

7.

QUALITY ASSURANCE REPORT


During the month of May 2014, SANJOSE Quality System implemented the following processes to
ensure the quality:-

8.

Control of the Documentation


Inspection Checks
Finalization of suppliers and subcontractors
Inspection and measuring of the equipment
Materials Subject to Checks
Inspection Points Plan
Laboratory Tests Plan

Etc.

SAFETY & OPERATIONAL TRAINING


Conducted by CONSTRUCTORA SANJOSE S.A. with the purpose of increasing the knowledge of
whose duties and responsibilities in Airside Operation of TIA, safety training was provided by our
Operational & Safety Manager.
This month, the safety training was carried out on 18/05/2014 at 14:00. Ten (10) people were at the
training.

9.

TESTING REPORT

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

Please find attached Annexure E with all the testing reports carried out during May 2014.

10. ENVIRONMENTAL REPORT


Please find attached Annexure F with the Monthly EnvironmentalReport ofMay 2014.

11. CONTRACTORS FACILITIES REPORT


Please find attached Annexure G with the Contractors Facilities Report of May 2014.

12. PLANNED ACTIVITIES FOR THE FOLLOWING MONTH


During next month, the following construction activities will be carried out:
A03: RUNWAY EXTENSION
-

Preparation/maintenance of temporary site access roads/routes,fences,gates & facilities in progress


as per site requirements.
- Excavation works and disposal of excavated materials in Runway Area 01.
- Installation of Geo-Grid in Runway Area 01.
Formation fill (CBR5%) works.
Subgrade (CBR15%) filling works.
Arrangement of Temporary Airfield Lightings works
Drainage system (surface & sub-surface) & culvert works.
Security Building construction works.

A04: PARALLEL TAXIWAY AND INTERNATIONAL APRON


-

Preparation of temporary site access roads/routes,fences,gates & facilities in progress as per site
requirements
Formation fill(CBR5%) compaction works.
Settlement plates installation works.
Drainage system and culvert works.
Transportation of embankment filling materials at site.

A12 8: ACCESS ROAD FOR ITB EXPANSION


-

Construction works for Guard House (G1).


Construction of chain-link fencing works.
Drainage system works.
All kind of earthworks (filling& compaction) works for Access Road in ITB Area.
Sub-base & base preparation works in ITB Road.
- Construction of New water tank.

B01: INTERNATIONAL TERMINAL BUILDING


-

Construction works in International Terminal Building in the following areas:


o
Baggage Claim

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS

Gate Lounge

13. UPDATED CASH FLOW SCHEDULE


Please find attached the Updated Cash Flow Schedule in Annexure H.

14. PHOTOGRAPH REPORT


Please find attached the Annexure I with the Photograph Report ofMay 2014.

MONTHLY PROGRESS REPORT MAY 2014


ICB 01: AIRSIDE INFRASTRUCTURE AND LANDSIDE TERMINAL IMPROVEMENT AT TIA, SIMIKOT AND RARA AIRPORTS