This document contains a summary of funds used for a PKM research project on green inhibitors. It lists the sources of funding as a PKM grant of Rp4,550,000 and a personal loan of Rp350,000. It then details the expenditures of Rp4,900,000 on materials, equipment, testing, travel and other costs needed for the project such as steel, ethanol, reagents, spectrophotometry testing, corrosion testing and report printing. An attachment provides photos to support the activities conducted.
This document contains a summary of funds used for a PKM research project on green inhibitors. It lists the sources of funding as a PKM grant of Rp4,550,000 and a personal loan of Rp350,000. It then details the expenditures of Rp4,900,000 on materials, equipment, testing, travel and other costs needed for the project such as steel, ethanol, reagents, spectrophotometry testing, corrosion testing and report printing. An attachment provides photos to support the activities conducted.
This document contains a summary of funds used for a PKM research project on green inhibitors. It lists the sources of funding as a PKM grant of Rp4,550,000 and a personal loan of Rp350,000. It then details the expenditures of Rp4,900,000 on materials, equipment, testing, travel and other costs needed for the project such as steel, ethanol, reagents, spectrophotometry testing, corrosion testing and report printing. An attachment provides photos to support the activities conducted.