Monthlv Progress Report of Orissa Border - Aurang Section of NH-6(53) - lanuary 20L4
Project Description
2.1
Introduction
With the rapid socio-economic development in India, the GOI felt the importance of the
multiplier effects in economy of Highway Development and took up comprehensive
development of the National Highways. Accordingly, Govemrnent of India created the National
Highway Authority of India (NHAI) and entrusted it with the responsibility of development of
the National Highways. The development of National Highways is being taken up by NFIAI
under different Phases of NHDP programs.
The National Highway, NH-6, starts from Kolkata in West Bengal and ends at Hazfua Port in
Gujarat. It is a major connecting link between the states of West Bengal, Odisha, Chhattisgartg
Maharashtra and Gujarat. The project road stretcll forming part of NH-6, starts from
Chhattisgarh - Orissa Border (Km 88.00) and ends at Aurang in Chhattisgarh (Km 239).It is being
taken up for widening and strengthening to 4 lanes with paved shoulder standard under NHDP
Phase - IV.
The project road stretch falls in the districts of Raipur & Mahasamund in Chhattisgarh State. (The
project road passes through Bamawapura), one of the major tourist attractions. It crosses River
Mahanadi at Km 230. The settlements of Saraipali, BaSn4 Pithor4 Patewa and Tumgaon lie along
the project corridor. Alignment of the project road and its surrounding road network is shown in
Figure 2-L : below.
Ligre
\tq+
11.
Plain / Rolling.
"t
i;[
z-r Uelow;
tu*t
2.2.5
Orissa Border
Section of NH-6(53)
- Au
Fly Over
No.
01
PUP/VUP
No.
24
7.
Culvert
(a)
Hume Pipe
No.
34
o)
Slab Culverts
No.
37
(c)
Box
No.
24
8.
Toll Plaza
No.
02
9.
At grade intersections
No
t6
It,
t
t
E
E
t,
E
E
t
E
E
It
E,
t
t
E
F
Four Laning
Name of Wotk
Aurang
of NH-6(53) in the State of Chhattisgarh to be
Executed as BOT(Toll) on Design, Built, Operate
and Transfer (DBFOT) basis.
2
Client
Concessionaire
Independent Engineer
Design Consultant
EPC Contractor
EPC Cost
Date of CA
L0
Appointed Date
11
Period of Completion
30 months
12
Concession Period
1,3
Lenders Engineer
\r.
;/'-t3
......-
2.2.6
ScoPe of
Concessionlire
below:
Maior scope of work under agreement is as
carriage way
Rehabilitation/ improvement of existing road/
lanes and entry / exit ramps
New pavement construction for additional
a
a
a
a
a
a
a
a
a
a
a
as Per
maintenance schedules
2.2.7
Wewillconductalltheconstructionactivitiesinsuchamarrnerto:
o Ensure healthy and safe working environment for all workers
E
E
E
E
E
E
E
E,
tr
E
E
t,
o
a
a
a
a
a
a
r visible safety
control/ guide
erly planned'
, .- moving construction machinery frorn one
g slow -^-,:--
site to another'
E.
E.
tr
A.
14
t
-
t
t
- Aurang
section of NH-6(s3)
- lanuant
2014
iii
l':'
,
\D
il
1,
Earthwork in Embankments
Cum
52,35,679
Cum
13,05,051
Cum
9,08,653
Cum
6,20,637
Cum
2,36,123
Bituminous Concrete
Cum
1,08,065
Structural Concrete
Cum
2,39,673
RE
24200
I
I
I
I
: :.-q
Detuils of Bypasses
Chair
wall
112+870
119+000
Saraipalli
6130
2.
135+000
139+300
Basna
4300
3.
153+000
156+970
Sankra
3970
f,
a.
169+390
172+740
Pithora
3350
f,
214+700
218+100
Tumgaon
3400
6.
226+260
230+110
Birkoni
3850
233+700
237+600
Aurang
3900
)
)
)
i
)
Total
28.900