Professional Documents
Culture Documents
Oiaw-01 Jan 2015
Oiaw-01 Jan 2015
RWY/Area
affected
AD 2-5 OIAW
1 JAN 15
Ahwaz
Remarks
Obstacle type
Elevation/ HGT
Markings/LGT
Coordinates
Obstacle type
Elevation / HGT
Markings/LGT
Coordinates
Building
12 FT AGL
NIL
312030N
0484526E
Burning gas exists on final RWY 12 and left side of RWY 30.
Ahwaz
Hours of service
MET Office outside hours
H24
Briefing/consultation provided
Ahwaz TWR
Dimensions of
RWY
(M)
TRUE BRG
Strength(PCN)
and surface of
RWY and SWY
THR
coordinates
THR geoid
undulation
12
124.24GEO
3398 x 45
55/F/C/X/T
Asphalt
30
304.25GEO
3398 x 45
55/F/C/X/T
Asphalt
Slope of
RWY - SWY
SWY
dimensions
(M)
CWY
dimensions
(M)
Strip
dimensions
(M)
OFZ
Remarks
10
11
12
0.06 %
298 x 45
NIL
NIL
NIL
NIL
0.06 %
298 x 45
NIL
NIL
NIL
NIL
312045.69N
0484449.80E
GUND 52 FT
311943.81N
0484636.23E
GUND 52 FT
6
THR 66 FT
THR 59 FT
TORA (M)
TODA (M)
ASDA (M)
LDA (M)
Remarks
12
30
3398
3398
3696
3695
3696
3695
3398
3398
NIL
NIL
AMDT 1/15