You are on page 1of 7

PROJECT : THE HUB

SUBJECT : PUNCHLIST & RECOMMENDATION TO SOME PARTICULAR


SITE CONDITION.
The following is in response to punchlist and some query issued by
FastServices Corporation and JJPI during meeting at the HUB Cabuyao,
Laguna, to JOC Fab. Const. Corp.

SLOPE PROTECTION ALONG SLEX


PARTICULARS: MUD FLOOD COMING FROM SLEX

3 POSSIBLE SOLUTION

1) INSTALLATION OF CONCRETE CANAL ABOVE THE SLOPE


2) INSTALLATION OF ADDL SERIES OF GABION WALL UP THE ROAD END.
( FOR COMMENTS OF ENGR. MORALES )

FILL MATERIALS BETWEEN SILTATION TANK AND CISTERN TANK


PARTICULARS : FILL MATERIALS WASHED AWAY BY RAIN WATER

RECOMMENDATION:
THIS IS BEING ADDRESS BY LAYING OF BOULDERS AS SUB BASE WITH EARTHFILL ON TOP
TO PREVENT FURTHER SCOURING OF SOIL.

PAVEMENT INFRONT MODULE 6


PARTICULARS: WATER PONDING AT PAVEMENT

RECOMMENDATION:
THIS IS ALSO SCHEDULED FOR RE GROUTING TO LEVEL THIS AREA

AT PALLET AREA
PARTICULARS:

WATER SPILLAGE AROUND PALLET WASH AREA

RECOMMENDATION:
INSTALLATION OF ADDITIONAL CANAL WITH STEEL GRATING COVER ON THE
PHERIPHERAL OF PALLET WASHER TO AVOID WATER SPILLAGE DURING WASHING
( WAITING FOR FINAL LAY-OUT AND DRAWING FROM ALLAN ALANIS )

AT LOADING AREA
PARTICULARS:

OVER FLOW OF RAIN WATER

RECOMMENDATION:
MUST MAINTAIN FREE FLOW OF WATER ON THE DRAINAGE THIS CAN DONE BY
CHECKING ANY MATERIAL ( I.E. PLASTIC BAGS, BOTTLE CONTAINER S, ETC.)
BLOCKING THE INLET.

AT SILTATION TANK
PARTICULARS: BACK FLOW OF DUE TO HIGH WATER AT S. TANK
WATER LEVEL

RECOMMENDATION:
WE CAN CONSTRUCT ADDITIONAL HOLE AT EVERY WALL CHAMBER
TO MAINTAIN CONTINOUS FLOW OF WATER.