3 POSSIBLE SOLUTION
RECOMMENDATION:
THIS IS BEING ADDRESS BY LAYING OF BOULDERS AS SUB BASE WITH EARTHFILL ON TOP
TO PREVENT FURTHER SCOURING OF SOIL.
RECOMMENDATION:
THIS IS ALSO SCHEDULED FOR RE GROUTING TO LEVEL THIS AREA
AT PALLET AREA
PARTICULARS:
RECOMMENDATION:
INSTALLATION OF ADDITIONAL CANAL WITH STEEL GRATING COVER ON THE
PHERIPHERAL OF PALLET WASHER TO AVOID WATER SPILLAGE DURING WASHING
( WAITING FOR FINAL LAY-OUT AND DRAWING FROM ALLAN ALANIS )
AT LOADING AREA
PARTICULARS:
RECOMMENDATION:
MUST MAINTAIN FREE FLOW OF WATER ON THE DRAINAGE THIS CAN DONE BY
CHECKING ANY MATERIAL ( I.E. PLASTIC BAGS, BOTTLE CONTAINER S, ETC.)
BLOCKING THE INLET.
AT SILTATION TANK
PARTICULARS: BACK FLOW OF DUE TO HIGH WATER AT S. TANK
WATER LEVEL
RECOMMENDATION:
WE CAN CONSTRUCT ADDITIONAL HOLE AT EVERY WALL CHAMBER
TO MAINTAIN CONTINOUS FLOW OF WATER.