Professional Documents
Culture Documents
Cluster Post Drive Report Template
Cluster Post Drive Report Template
Prepared By:
Reviewed By:
Page 1 of 14
Table of Contents
1 INTRODUCTION..................................................................................................3
1.1 DT Route/Area............................................................................................3
1.2 On-Air Status of Cluster............................................................................4
2 PROCEDURE......................................................................................................5
3 CALL SUMMARY................................................................................................5
4 RF INDICATORS DISTRIBUTION PLOTS.........................................................6
4.1 RxLev(Sub).................................................................................................7
4.2 RxQuality(Sub)...........................................................................................8
4.3 C/I....................................................................Error! Bookmark not defined.
4.4 Handover Failure......................................................................................11
4.5 Call Drop...................................................................................................11
4.6 Data Throughput(Downlink)....................................................................11
5 UPDATED ENGINEERING PLANNING DATA:......ERROR! BOOKMARK NOT
DEFINED.
6 RECOMMENDATION & TECHNICAL OVERVIEW..........................................13
7 PUNCH LIST......................................................................................................13
Page 2 of 14
1 Introduction
1.1 DT Route/Area
Page 3 of 14
Page 4 of 14
2 Procedure
The procedure for the drive tests is described below:
Cluster drive tests shall perform 3 call scenarios: short call, long call, and PS call. GPRS functionality
drive tests were performed by downloading a huge file from an FTP server throughout the cluster drive
test route. Configuration of MS is as follows in the DT Kit:
MS1= Long call (MS to MSC Test Number ,continous call )
MS2 = Short call (MS to MSC Test Number, 30sec., 3 sec. delay)
MS3 = EGPRS downloading
MS4 = Idle
3 Call Summary
Content
Call Drop(Long Call)
Handover(Long Call)
Downlink Throughput
Value
Contionous call
0%
91
100%
Handover Success
38
Handover Attempt
38
100%
57.35
Remark
Page 5 of 14
4.2 RxLev(Sub)
Page 6 of 14
Legend
-68 to 0
Bin count
3598
Percentage
50.22
Page 7 of 14
-76 to -68
-84 to -76
-92 to -84
-110 to -92
Total
1429
1467
622
48
7164
19.95
20.48
8.68
0.67
100
4.3 RxQuality(Sub)
Page 8 of 14
Legend
Bin count
Percentage
0-4
5
6
7
Total
6992
93
64
15
7164
97.60
1.30
0.89
0.21
100
4.3 C/I
Page 9 of 14
Legend
20 to 35
Bin count
6257
Percentage
91.08
Page 10 of 14
12 to 20
9 to 12
5 to 9
0 to 5
-10 to 0
TOTAL
611
1
1
0
0
6870
8.89
0.01
0.01
0
0
100
Page 11 of 14
GPRS was not connected in Gandhinagar site & Muvattupuzha sites 2nd sector, informed to OMCR.
Page 12 of 14
Page 13 of 14
6 Punch List
Sr. No.
Item
Date Closed
No
Page 14 of 14