POST-TENSIONING PROTOCOL
(The sequence of stressing)

BRIDGE 02 - km 65+711
BRIDGE 03 - km 66+041
BRIDGE 04 - km 66+848

Page 1 of 4

Matini broj: 20688980


PIB: 106831661
ifra delatnosti: 7112

"DB INENJERING" doo


Hadi erina 22, 11000 Beograd, Srbija
tel./fax: +381 11 24 00 995
tel./fax: +381 11 344 68 72
e-mail: db_Inzenjering@yahoo.com

1) General notes
PT tendons (cables):
Cables shall be stressed when concrete has attained strength of min. 35 MPa (70% MB50), but not
before 3 days after pouring
Cables shall consist of 15 strands 15.7mm diameter
Low relaxation strands (max 2.5% relaxation after 1,000 hours), min. UTS of 279 kN/strand, 15
strands per cable, and minimum tensile strength of 1860 Mpa
Cable jacking force: 3348 kN for cable (80% UTS)
The anchorage pull in locking off: 5 mm
Input parameters used for PT tendons calculation:

Units : Length(m), Cross-section(m), Force(KN), Stress(KN/m2)


Tendon nominal area :
+2.25000e-03
Tendon duct area :
+5.67000e-03
Friction (my)
:
0.20000
Wobble coefficient (k) [rad/m]
0.005 (=0.30 deg/m)
E-Modul - static :
+1.95000e+08
E-Modul - prestress.:
+1.95000e+08
Allow. stress
:
+1.39500e+06
Wedge slip
:
0.00500

Page 2 of 4

Matini broj: 20688980


PIB: 106831661
ifra delatnosti: 7112

"DB INENJERING" doo


Hadi erina 22, 11000 Beograd, Srbija
tel./fax: +381 11 24 00 995
tel./fax: +381 11 344 68 72
e-mail: db_Inzenjering@yahoo.com

Tendon Action

Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------101
STRESS
START
3348.000
3140.307
0.24842
34.051
Tendon Action

Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------102
STRESS
START
3348.000
3164.825
0.24920
34.028
Tendon Action

Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------103
STRESS
START
3348.000
3189.536
0.25003
34.012

Page 3 of 4

Matini broj: 20688980


PIB: 106831661
ifra delatnosti: 7112

"DB INENJERING" doo


Hadi erina 22, 11000 Beograd, Srbija
tel./fax: +381 11 24 00 995
tel./fax: +381 11 344 68 72
e-mail: db_Inzenjering@yahoo.com

Stressing sequence
The cables shall be stressed from one side only with full jacking force of 3348 kN, according to the
following schedule:
K2 (middle cable) K3 (top cable) K1 (bottom cable)

Cable
Lnet
Position
Type
Action
Fjack
Elongation
No
[m]
X [m]
[kN]
l [mm]
2
34.028 START 0.00 1515.7 STRESS 3,348.00
249
3

34.051 START 0.00 1515.7 STRESS 3,348.00

248

34.012 START 0.00 1515.7 STRESS 3,348.00

250

Belgrade,
June 2016.
Responsible designer: