1) General notes
PT tendons (cables):
Cables shall be stressed when concrete has attained strength of min. 35 MPa (70% MB50), but not
before 3 days after pouring
Cables shall consist of 15 strands 15.7mm diameter
Low relaxation strands (max 2.5% relaxation after 1,000 hours), min. UTS of 279 kN/strand, 15
strands per cable, and minimum tensile strength of 1860 Mpa
Cable jacking force: 3348 kN for cable (80% UTS)
The anchorage pull in locking off: 5 mm
Input parameters used for PT tendons calculation:
Page 2 of 4
Tendon Action
Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------101
STRESS
START
3348.000
3140.307
0.24842
34.051
Tendon Action
Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------102
STRESS
START
3348.000
3164.825
0.24920
34.028
Tendon Action
Nb
Ne
dl
L
Nb%
Ne%
--------------------------------------------------------------------------103
STRESS
START
3348.000
3189.536
0.25003
34.012
Page 3 of 4
Stressing sequence
The cables shall be stressed from one side only with full jacking force of 3348 kN, according to the
following schedule:
K2 (middle cable) K3 (top cable) K1 (bottom cable)
Cable
Lnet
Position
Type
Action
Fjack
Elongation
No
[m]
X [m]
[kN]
l [mm]
2
34.028 START 0.00 1515.7 STRESS 3,348.00
249
3
248
250