MMKI PROJECT (Press & Welding Factory) (HARIANTO) (09 s/d 15 Sept 2015)

HOLIDAY

1. Install clamp & hanger rod for highbay lighting line 3 (09-092015).

2. Install clamp & hanger rod for highbay lighting line 5 (10-09-2015). 3. Install clamp & hanger rod for highbay lighting line 6 (11-09-2015).

4. Install hanger rod for highbay lighting line 7 (12-09-2015).

5. (13-09-2015).

Press & Welding Factory

6. Install clamp & hanger rod for highbay lighting line 8 (14-092015).

7. Install clamp & hanger rod for highbay lighting line 10 (15-092015).

2
3
4
6

MMKI PROJECT (Press & Welding Factory) (KARSONO) (09 s/d 15 Sept 2015)

NO ACTIVITY

1. (09-09-2015).

2. Install clamp for supportingcable rack W300 (20 kV system) at


column Dx line 10-11 (10-09-2015).

3. Install clamp & hanger rod cable rack W500 column Dx-F line 10 & 4. Install clamp & hanger rod for cable rack W500 column F-Gx line
11 (11-09-2015).
10 & 11 (12-09-2015).

5. Install clamp for cable rack W500 column Dx line 10-11 (1209-2015).

Press & Welding Factory

8. Install pvc 2" for coaxcial cable 35mm2 - lightning protection


plan "B" column Fx line 10-12 (15-09-2015).

3
6. (13-09-15)

HOLIDAY

3
4

7. Install clamp for supporting coaxcial cable 35mm2 - lightning


protection plan "B" column Fx line 10-12 (14-09-2015).