A REPORT ON FLEXIBLE PAVEMENT DESIGN

A REPORT ON PAVEMENT DESIGN FOR THE SECTION OF ROAD


FROM THE ADMINSTRATIVE
BLDG.(VNIT) TO SBI(VNIT) INSIDE THE CAMPUS
1) INTRODUCTION:The section of the road from Administrative building to SBI is a single lane road
carrying low passenger traffic. It is proposed to overlaying of the entire road. The
pavement design for the portion is proposed based on the existing carriageway.
Based on the soil investigation performed by VNIT students, the de- sign is
proposed. The existing road structure is evaluated through Benkelman Beam
Deflection techniq- ue and the overlay for the existing road is proposed using BBD
test as per IRC 81 : 1997 Guidelines for Strengthening of flexible road pavements
using Benkelman Beam Deflection technique. The proposed overlay portion is
designed as per IRC 37 : 2001 Guidelines for the design of flexible pavements.
The section of the road is divided into 2 portions and the BBD survey is conducted
for each section. The design for overlaying portion is proposed individually for the two section.
2) SOIL CONDITION:Soil is having a higher moisture content because BBD test is performed next day of
the rain. The area is comes within the Nagpur, having major part of black cotton
soil and dark black soil. So the plastic index will be high for this region. Nagpur
comes under the low rainfall area having rainfall less than 1300 mm
3) PAVEMENT AND SOIL DATA:MOISTURE CONTENT OF SOIL:- 18%
PLASTIC INDEX >15
SEASONAL FACTOR=1.05 , RAINFALL OF NAGPUR <1300mm(From NMD site)

A REPORT ON FLEXIBLE PAVEMENT DESIGN

SR NO.

INITIAL
READING

INTERMEDIATE
READING

FINAL
READING

TEMPRATURE
0
C

0.82

0.8

49.6

0.94

0.8

52

0.95

0.9

53

0.72

0.6

51.8

0.61

0.59

49.8

0.75

0.63

50

0.86

0.75

51.6

0.66

0.6

52.3

0.9

0.79

53.2

0.88

0.8

49.9

DEFLECTION VALUES:SECTION 1 :-

A REPORT ON FLEXIBLE PAVEMENT DESIGN

FOR SECTION 2:-

A REPORT ON FLEXIBLE PAVEMENT DESIGN


SR.NO.

INITIAL
READING
INTERMEDIATE
READING

(mm)

FINAL
READING

TEMP
0
C

0.6

49.6

1.9

1.4

52

0.36

0.32

49.8

0.39

0.36

52.3

1.1

0.9

51.8

0.54

0.4

51.6

TRAFFIC DESIGN DATA:ASSUME INITIAL TRAFFIC VOLUME= 20 CVPD


DESIGN PERIOD = 10 YEARS
GROWTH RATE = 4%
LANE DISTRIBUTION FACTOR= 1(SINGLE LANE ROAD)
VEHICAL DAMAGE FACTOR= 1.5 (A=20 CVPD<150 &PLAI TERRIAN)

4)

A REPORT ON FLEXIBLE PAVEMENT DESIGN

5) CALCULATION FOR OVERLAY OF PAVEMENT:PROFORMA FOR RECORDING FIELD INFORMATION COLLECTED DURING
PAVEMENT CONDITION SURVEY

NAME OF ROAD:- VNIT CAMPUS ROAD FROM


DATE OF SURVEY:-25/8/15
APPLIED PHY. TO MATH
A REPORT ON
FLEXIBLE PAVEMENT DESIGN
DEPARTMENT
TRAFFIC INTENSITY:-LOW
SECTION NO:-1`

ANNUAL RAINFALL :-LOW


SUBGRADE SOIL TYPE:-

TRAFFIC LAN- ONE LANE ROAD

PAVEMENTS DETAILS
SR.
NO

SUB
SECTIO
N FROM
TO

PAVEMEN
T
CONDITI
ON

AB

GOOD

SURFACING
TYPE

BASE

THIC
KNES
S

BITUMI
N
LAYER

--

TYP
E
--

SUB BASE

THICK TYPE
NESS
--

--

REMARK

THICK
NESS
--

BC

GOOD

BITUMI
N
LAYER

--

--

--

--

--

CD

GOOD

BITUMI
N
LAYER

--

--

--

--

--

DE

FAIR

BITUMI
N
LAYER

--

--

--

--

--

EF

FAIR

BITUMI
N
LAYER

--

--

--

--

--

FG

FAIR

BITUMI
N
LAYER

--

--

--

--

--

GH

FAIR

BITUMI
N
LAYER

--

--

--

--

--

HI

FAIR

BITUMI
N
LAYER

--

--

--

--

--

IJ

FAIR

BITUMI
N
LAYER

--

--

--

--

--

10

READINGS
ARE NOT
TAKEN AT
THE TIME OF
PERFORMANCE.

READINGS
ARE NOT
TAKEN AT
THE TIME OF
PERFORMANCE.

A REPORT ON FLEXIBLE PAVEMENT DESIGN


NAME OF ROAD:- VNIT CAMPUS ROAD FROM
DATE OF SURVEY:-25/8/15
MATH DEPARTMENT TO SBI
TRAFFIC INTENSITY:-LOW
SECTION NO:-2`

ANNUAL RAINFALL :-LOW


SUBGRADE SOIL TYPE:-

TRAFFIC LAN- ONE LANE ROAD

PAVEMENTS DETAILS
SR.
NO

SUB
SECTION
FROM
TO

PAVEMENT
CONDITIO
N

AB

POOR

BITUMIN
LAYER

--

--

--

--

--

BC

POOR

BITUMIN
LAYER

--

--

--

--

--

CD

FAIR

BITUMIN
LAYER

--

--

--

--

--

DE

FAIR

BITUMIN
LAYER

--

--

--

--

--

EF

POOR

BITUMIN
LAYER

--

--

--

--

--

FG

--

--

--

--

--

--

SURFACING

BASE

TYPE

TYPE

THICK
NESS

--

SUB BASE
THICKNESS

TYPE

REMARK
THICKNESS

READING
S ARE
NOT
TAKEN AT
THE TIME
OF
PERFORM
-ANCE.

TRAFFIC VOLUME CALCULATION:N= 365*A ((1+r)^n-1)*LDF*VDF/r


N= 365*75((1+.04)10-1))*1*1.5/.04
N=.13msa
DEFLECTION CALCULATION:STARTING POINT IS A
SR NO. INITIAL INTERMEDIA FINAL
READIN TE
READIN

INTER. R.- REBOUND


TEMPRATUR REBOUND
DEFLECTION( E
DEFLECTION
7

A REPORT ON FLEXIBLE PAVEMENT DESIGN

READING

FINAL R. mm)

(CORRECTED)mm

0.82

0.8

0.02

0.52

49.6

0.374

0.94

0.8

0.14

0.4

52

0.23

0.95

0.9

0.05

0.2

53

0.02

0.72

0.6

0.12

0.8

51.8

0.632

0.61

0.59

0.02

0.94

49.8

0.792

0.75

0.63

0.12

0.74

50

0.59

0.86

0.75

0.11

0.5

51.6

0.334

0.66

0.6

0.06

0.8

52.3

0.627

0.9

0.79

0.11

0.42

53.2

0.238

0.88

0.08

0.4

49.9

0.251

0.8

MEAN

0.4088

STDIV

0.228

DC

0.637

By applying seasonal correction:Finally corrected Dc = 1.05*.637=.67mm (for section 1)

SR.NO
.

INITIAL
READI
NG

INTERMEDIA FINAL
TE
READI
READING
NG

INTER R.FINAL R.

REBOUND
DEFLECTI
ON

0.4

7.13

REBOUND
DEFLECTIO
N
TEMP
0
C

(mm)
A

0.6

49.6

(CORRECTE
D)
(mm)
6.98

A REPORT ON FLEXIBLE PAVEMENT DESIGN

1.9

1.4

0.5

4.11

52

3.94

0.36

0.32

0.04

1.59

49.8

1.44

0.39

0.36

0.03

1.45

52.3

1.28

1.1

0.9

0.2

3.36

51.8

3.20

0.54

0.4

0.14

2.01

51.6

1.85

MEAN

3.12

STDIV

1.97

DC

5.09

By applying seasonal correction:Finally corrected Dc = 1.05*5.09=5.34mm (for section 2)


But for road section 2 sub section ABC is more damaged compare to CDEF so
for ABC part Xm = (6.98+3.94+1.44)/3 =4.12mm
St Dev. = 2.26mm
so Dc = 6.4 mm,
After applying seasonal correction Dc = 6.72 mm
for CDEF part Xm = 1.94mm
St Dev. = .75mm
so Dc =2.7mm
after apply seasonal correction= 2.83 take 3 mm

FROM BELOW CHART:9

A REPORT ON FLEXIBLE PAVEMENT DESIGN

10

A REPORT ON FLEXIBLE PAVEMENT DESIGN

RESULTS AND CONCLUSION:


FOR SECTION 1:NO OVERLAY OF PAVEMENT IS REQUIRED , ROAD IS IN QUITE GOOD CONDITION.
FOR SECTION 2:(a) SUB PART ABC SHOULD BE PROVIDED WITH OVERLAY OF 160mm BM LAYER
IMMEDIATELY .
(b) ALTERNATIVE WE CAN PROVIDE ALSO .7*160= 112mm BDM/AC LAYERS.
(45mmAC+70mmBDM) LAYERS.
(c)SUB PART CDEF IS IN ITS FINAL CONDITION. IT SHOULD BE PROVIDED OVERLAY
OF 25mm BITUMAN LAYER FOR INCREASING ITS DURABILITY AND WORKABILTY.