You are on page 1of 1

Final Project II (SYSE 804)

1. On average 2 passengers per minute arrive at Faizabad Metro Station ticketing booth.
It takes 45 seconds (average) to issue ticket and verification machine can process on
average 4 passengers per minutes. After the verification the passenger can board the
bus. Simulate the system for 1 day (6am to 10 pm) to estimate average time from
arriving to boarding the bus for any passenger.
2. Compare with the following situation when on average 3 passengers per minute arrive
and it takes 40 seconds (average) to issue ticket and verification machine can process
on average 5 passengers per minutes.
Use all techniques, graphs and plots to present your findings.

All results should be statistically acceptable.

Best of Luck!