: Lead Consultant,
Infotech Enterprises Limited,
Bangalore
Date
: 30.3.2010
Use only
approved software,
release,
version
to be consistent with customers expectations.
M=P*L
L
Fixed end
Problem at hand
Note:
indicates reaction
R=P
FBD
Fixed edge
Fixed edge
Load
Bending without
twisting
Load
Bending with
twisting
Important features to be
captured and ignored
Capture, but
check for
presence of
reinforcement
Beading
capture
Structure boundary
Ignore, if filled
Or low stress
region
60 mm
20 mm
10 mm
Capture,
presence of
reinforcement
Ignore, but
check for
presence of
reinforcement
Ignore, but
check for
presence of
reinforcement
Zone of interest
Importance of checklists in
production finite element
analysis
Factor of safety
Include all relevant figures. Create all tables
connecting the relevant sections through
equations.
Build conservatism into the calculations.
Real status: Total stress = Stress due to
mech. Load (Tensile) + Stress due to
temperature effect (Tensile) - Stress due to
bending (Compressive) = Lower stress hence
better RF (Real status, not practiced)
Side wall
(Vertical)
Material direction
Floor panel
(Horizontal)
z
X
y
Cutout