Summary of Geotech Report
Summary of Geotech Report
Sl. No.
Description
1
BRIDGE OVER SUTLEJ YAMUNA BRANCH CANAL & NARAYANA BRANCH CANAL
2
BRIDGE ON ISMAILABAD BYPASS
3
BRIDGE ON ISMAILABAD BYPASS
4
BRIDGE ON ISMAILABAD BYPASS
5
BRIDGE ON ISMAILABAD BYPASS
6
BRIDGE ON PHEOWA BYPASS
7
BRIDGE ON PHEOWA BYPASS
8
BRIDGE ON PHEOWA BYPASS
9
BRIDGE ON KAITHAL BYPASS
10
BRIDGE OVER KAITHAL MINOR DISTRIBUTORY ON KAITHAL BYPASS
11
RAILWAY OVER BRIDGE ON KAITHAL BYPASS
12
RAILWAY OVER BRIDGE ON EXISTING HUDDA BYPASS
13
VEHICULAR UNDERPASS ON EXISTING HUDDA BYPASS
14
BRIDGE OVER SHERGARH MINOR (KAITHAL BRANCH) ON KAITHAL BYPASS AT
15
BRIDGE OVER AMIN DRAIN ON KAITHAL BYPASS
16
BRIDGE ON SIRSA BRANCH CANAL ON KAITHAL BYPASS
TOTAL LENGTH OF BORE LOG (m)
CHAINAGE No of Bore
Log
21.400
32.200
34.540
34.880
35.080
49.931
50.760
51.600
73.350
74.950
76.960
79.160
79.675
80.060
82.900
83.850
5
3
1
1
1
3
2
4
1
1
4
4
1
1
2
2
36
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
30
Remarks
Total
In Soil
150
90
30
30
30
90
60
120
30
30
120
120
30
30
60
60
1080
150
90
30
30
30
90
60
120
30
30
120
120
30
30
60
60
1080
In Hard
Rock
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
150 m in Soil
90 m in Soil
30 m in Soil
30 m in Soil
30 m in Soil
90 m in Soil
60 m in Soil
120 m in Soil
30 m in Soil
30 m in Soil
120 m in Soil
120 m in Soil
30 m in Soil
30 m in Soil
60 m in Soil
60 m in Soil