PROJECT TEST
ENG . YASSER FATHY
NFPA 13 , NFPA14
PROJECT TEST.fiw
07, 2016
Civil Defense
Building Owner:
Phone at Building:
Project Data
Description Of Hazard:
Design Area Of Water Application:
Default Sprinkler K-Factor:
Inside Hose Stream Allowance:
In Rack Sprinkler Allowance:
Sprinkler Specifications
Make:
Size:
Ordinary 1
1500
5.65
100.00
0.00
ft
K
gpm
gpm
Model:
Temperature Rating:
0.5"
160 F
Date Of Test:
0
0.00
280.05
0
ft
gpm
gpm
psi
Static Pressure:
Test Residual Pressure:
Calculated Inflow Residual Pressure:
0.00 psi
0.00 psi
87.99 psi
Demand
14.50 psi
17
16
11
0.15 gpm/ft
0
0
07 , 2016