Professional Documents
Culture Documents
Softwel Roads: Developed For All Kind of Road Projects in Nepal
Softwel Roads: Developed For All Kind of Road Projects in Nepal
Design Data
Alignment Data-1
Alignment Data-2
Profile
Cross-Section
Road_Width
CS_Data
Soil Type Data
Retaining Wall Data
Drain Data
Quantity
Survey Data
SOFTWEL ROADS
Project No.:
Project:
Road Sector :
AD PROJECTS IN NEPAL
Developed by:
SOFTWEL (P) Ltd., Baneshore,
Kathmandu.
ALIGNMENT DATA
Back to Main
Alignment Name:
Starting Chainage:
WCB:
IP-1-IP-2
Co-ordinate of IP1:
0+000.00
351.3000
X-Cor:
10000.000
Y-Cor:
10000.000
Note: Please Cheeck and Enter the correct value in the cell marked as
Data for Traverse Plotting
Traverse Data
IP
IP-IP
Clockwise
Radius
IP
Distance
Horzontal Angle
(no)
(m)
(deg)
(m)
[1]
[2]
[3]
[4]
[1]
IP-1
0.00
0.0000
0.00
1
IP-2
52.00
164.5349
50.00
2
123.456
raverse Data
Cumm
Dist
(m)
[2]
0.00
52.00
Horzontal
Angle
(deg)
[3]
0.0000
164.5349
WCB
(deg)
[4]
351.3000
335.8349
Def
Ang
(deg)
[5]
0.0000
15.4651
Radius
(m)
[6]
0.00
50.00
[1]
1
2
COOORDINATE
X
(m)
[2]
10000.000
9992.134
COOORDINATE
Y
(m)
[3]
10000.000
10051.402
DIST
(m)
[4]
0.00
52.00
WCB
(deg)
[5]
351.3000
335.8349
Def
Ang
(deg)
[6]
0.0000
15.4651
Radius
(m)
[7]
0.00
50.00
T
(m)
[8]
0.00
6.79
CURVE DATA
E
(m)
[9]
0.00
0.46
LC
(m)
[10]
0.00
13.50
BC
(m)
[11]
0+000.00
0+045.21
CHAINAGES
MC
EC
(m)
(m)
[12]
[13]
0+000.00
0+000.00
0+051.96
0+058.71
IP
(m)
[14]
0+000.00
0+052.00