ECG 3033(L)

HIGHWAY LABORATORY REPORT

TOPIC

SKID RESISTANCE TEST

PROGRAMME

EV101

SEMESTER
GROUP MEMBERS

05
1
2

SECTION

03

DATE

15/8/2016

PTM140709051
PTM140708516

ADIB AZALI BIN SALLEH


MUHAMMAD AMIRUL ASYRAF BIN
MOHD RANI
AIN NUR AISHAH BT MOHD YUSOF

4
5

ANISAH FARHAH BINTI AHMAD


AMELIA BT ABD KARIM

PTM140708619
PTM140708636

LECTURER

SIR DZUL HELMI BIN ARIFIN

ASSISTANT
LECTURER

SIR SYED

PTM140708669

TABLE OF CONTENT
NO
1
2
3
4
5
6
7
8
9

CONTENTS
INTRODUCTION
OBJECTIVES
APPARATUS
PROCEDURES
CALCULATION
DISCUSSION
CONCLUSION
REFERENCES
APPENDIX

PAGES
5
7

1. INTRODUCTION

2. OBJECTIVES

3. APPARATUS

Figure 1.1 A bottle of water

Figure 1.2 Portable pendulum skid resistance tester

4. PROCEDURES

5. CALCULATION

Cement Surface

Road Pavement Surface

Dry

Dry

110

120

110

Average: 113.33

81

78

Average: 81.33
Wet

135

85

140

Average: 137.33

Wet
137

120

100

95

Average: 105.00

6. DISCUSSION

7. CONCLUSION

8. REFERENCES

9.

APPENDIX