Professional Documents
Culture Documents
WB AP RDG ax kote to 3Zer0, tren opening tha. sicikh S, dees nok affect the load greatly Awan islanding debechon methods cit VAF bated methods doer not work very wl ASSIGNMENT- 4‘Sample Homework 1: Topics in Power Electronics and Distributed Generation 1. A GGKV sub-transmission line is terminated at a substation by a bank of two delta-star trans- formers. Each 66/11 kV, 10/VA transformer has an impedance of 8% (reactive) on the individual transformers rating as indicated in the Figure below. The 3-phase fault level on the substation transformer primary is 1500./V A, with the ratio of X/R = 4. The zero sequence impedance is twice the positive sequence impedance as seen from the 6BAV trans former primary. The 11kV star point of the transformers are solidly grounded. Eight 2M VA, L1kV distribution lines that are 4ém long emanate trom the LIkV secondary bus of this transformer. The distribution feeder line impedance is (0.5 + j0.5)Q/km. Zero sequence impedance is three times the positive sequence impedance for these 11kV lines. YQ ‘6okV; 3ph fault 1500MVA; XwRe = 4; Z07Z+=2 ZS sstieeiky war cube IOMVA, XI = 8% each or I TRV Be oz] fe} + 2 v + TARY: MA 4 ams Zescose] oayam 202+—3 (a) What is the fault current fora 3-phase fault at the transformer primary? (>) Draw the sequence networks corresponding to the 66/V’ source side SLG fault of the substation transformer, What is the fault current for a SLG fault at the transformer pri- mary?