Professional Documents
Culture Documents
Category
Low Tension
LT I: Domestic
LT I (A): Up to 100 Units/Month
0-50
51-100
LT I (B)(i): Above 100 Units/Month & up
to 200 Units/Month
0-100
101-200
LT I (B)(ii): Above 200 Units/Month
0-200
201-300
301-400
401-800
Above 800 units
LT II: Non-Domestic/Commercial
LT II (A): Up to 50 Units/Month
0-50
LT II (B): Above 50 Units/Month
0-100
101-300
301-500
Above 500
LT II (C): Advertisement Hoardings
LT II (D): Haircutting salons consuming
up to 200 units/month
0-50
51-100
101-200
LT III: Industry
Industries
Seasonal Industries (off season)
Pisciculture/ Prawn culture
Sugarcane crushing
Poultry farms
Mushroom, Rabbit, Sheep and Goat farms
Floriculture in Green House
LT IV: Cottage Industries
Cottage Industries
1|P a g e
Fixed/ Demand
Charges
(INR/ month)
Unit
Rate
Energy Charge
(INR/kWh/kVAh)
1.45
2.60
3.30
4.30
5.00
7.20
8.50
9.00
9.50
kW
50
6.00
kW
kW
kW
kW
kW
60
60
60
60
60
7.50
8.90
9.40
10.00
12.00
kW
kW
kW
60
60
60
5.30
6.60
7.50
kW
kW
kW
kW
kW
kW
kW
60
60
21
21
50
60
60
6.70
7.40
5.20
5.20
4.00
6.30
6.30
kW
20/kW subject to a
minimum of
4.00
Category
Municipalities
Municipal Corporations
LT VII: General
LT VII (A): General Purpose
LT VII (B): Wholly Religious Places
Load up to 2 kW
Load above 2 kW
LT VIII: Temporary Supply
2|P a g e
Fixed/ Demand
Charges
(INR/ month)
Unit
Rate
Rs.30/month
20/kW subject to a
kW
minimum of
Rs.30/month
HP
HP
525 *
525 *
Energy Charge
(INR/kWh/kVAh)
4.00
2.50
0.50
0.50
0.00
0.00
HP
HP
HP
HP
1050 *
1050 *
525 *
525 *
3.50
1.00
1.00
0.50
0.50
HP
20
4.00
kW
kW
kW
32
32
32
6.10
6.60
7.10
HP
HP
HP
32/ HP subject to a
minimum of Rs
50/month
32/HP subject to a
minimum of Rs
100/month
32/HP subject to a
minimum of Rs
100/month
5.00
6.10
6.60
kW
21
7.30
kW
kW
kW
21
21
21
5.40
6.00
11.00
Category
High Tension
HT I(A): Industry General
11 kV
33 kV
132 kV and above
HT I(A):Lights and Fans
11 kV
33 kV
132 kV and above
HT I(A):Poultry Farms
11 kV
33 kV
HT I(A):Industrial Colonies
11 kV
33 kV
132 kV and above
HT I(A):Seasonal Industries
11 kV
33 kV
132 kV and above
HT I(A):Optional Category with Load up
to 150 kVA
11 kV
HT I: Time of Day Tariffs (6 PM to 10
PM)
11 kV
33 kV
132 kV and above
HT I: Time of Day Tariffs (6 AM to 10
AM)
11 kV
33 kV
132 kV and above
HT I: Time of Day Tariffs (10 PM to 6AM)
11 kV
33 kV
132 kV and above
HT I(A): Poultry Farms - Time of Day
Tariffs (6 PM to 10 PM)
11 kV
33 kV
3|P a g e
Fixed/ Demand
Charges
(INR/ month)
Unit
Rate
kVA
kVA
kVA
390
390
390
Energy Charge
(INR/kWh/kVAh)
6.65
6.15
5.65
6.65
6.15
5.65
kVA
kVA
390
390
4.65
4.15
6.30
6.30
6.30
kVA
kVA
kVA
390
390
390
7.60
6.90
6.70
kVA
80
7.00
7.65
7.15
6.65
7.65
7.15
6.65
5.65
5.15
4.65
5.65
5.15
Category
HT I(A): Poultry Farms - Time of Day
Tariffs (6 AM to 10 AM)
11 kV
33 kV
HT I(A): Poultry Farms - Time of Day
Tariffs (10 PM to 6 AM)
11 kV
33 kV
HT I(B):Ferro Alloy Units
11 kV
33 kV
132 kV and above
HT II Others
11 kV
33 kV
132 kV and above
HT II: Time of Day Tariffs (6 PM to 10
PM)
11 kV
33 kV
132 kV and above
HT II: Time of Day Tariffs (6 AM to 10
AM)
11 kV
33 kV
132 kV and above
HT II: Time of Day Tariffs (10 PM to 06
AM)
11 kV
33 kV
132 kV and above
HT III Airports, Bus stations and Railway
stations
11 kV
33 kV
132 kV and above
HT III: Time of Day Tariffs (6 PM to 10
PM)
11 kV
33 kV
132 kV and above
4|P a g e
Fixed/ Demand
Charges
(INR/ month)
Unit
Rate
Energy Charge
(INR/kWh/kVAh)
5.65
5.15
3.65
3.15
5.90
5.50
5.00
kVA
kVA
kVA
390
390
390
7.80
7.00
6.80
8.80
8.00
7.80
8.80
8.00
7.80
6.80
6.00
5.80
kVA
kVA
kVA
390
390
390
7.50
6.85
6.45
8.50
7.85
7.45
Category
HT III: Time of Day Tariffs (6 AM to 10
AM)
11 kV
33 kV
132 kV and above
HT III: Time of Day Tariffs (10 PM to 06
AM)
11 kV
33 kV
132 kV and above
HT IV (A) Irrigation and Agriculture
11 kV
33 kV
132 kV and above
HT IV (B) CP Water Supply Schemes
11 kV
33 kV
132 kV and above
HT V (A) Railway Traction
HT V (B) HMR
HT VI Townships & Residential Colonies
11 kV
33 kV
132 kV and above
HT VII: Temporary
11 kV
33 kV
132 kV and above
HT VIII: RESCO
11 kV
* Equivalent flat rate tariff - INR/ HP/ year
5|P a g e
Fixed/ Demand
Charges
(INR/ month)
Unit
Rate
Energy Charge
(INR/kWh/kVAh)
8.50
7.85
7.45
6.50
5.85
5.45
6.40
6.40
6.40
5.10
5.10
5.10
7.10
7.00
kVA
kVA
kVA
60
60
60
6.30
6.30
6.30
kVA
kVA
kVA
500
500
500
10.80
10.00
9.80
1.00
Fuel Surcharge Adjustment (FSA) is applicable in accordance with the provisions of the
Electricity Act, 2003.
ii.
The tariffs are exclusive of Electricity duty payable as per the provisions of AP
Electricity Duty Act as adopted by Government of Telangana.
iii.
Voltage surcharge
The voltage surcharge for FY 2016-17 has been withdrawn.
iv.
In case of HT-V(A) and V(B): Railway Traction and HMR, the energy charges shall be
computed at 1.05 times of normal charges on the entire consumption, if RMD exceeds
120% of Contracted Demand.
v.
Minimum charges
Category
LT Categories
LT-I (A)
LT-I (B)(i)
LT-I (B)(ii)
LT-II (A) & II
(B)
LT-II (C)
LT-II (D)
6|P a g e
Category
Three phase
Panchayats
LT-VI (A)
Street lighting
LT-VII (A)
General purpose
LT-VIII
Temporary supply
Municipalities and
INR. 6/ point/
Corporation
month
s
Single phase
INR. 50/ month
Three phase
INR. 150/ month
INR. 125 per kW or part thereof of the
contracted load for first 30 days or part
thereof and for every subsequent period
of 15 days or part thereof a charge of
INR. 75 per kW
HT Categories
Billing demand shall be maximum
demand recorded during the month or
80% of contracted demand whichever
is higher except HT-VI (i.e. Township
and Residential Colonies, for this
category the billing demand is Actual
Demand Recorded)
Billing demand
Industry General
HT-I (B)
HT-II
Others
HT-III
HT-V(A) & V(B)
HT-VI
7|P a g e
Airports, Bus
stations and
Railway stations
Railway traction &
HMR
Townships and
residential
colonies
vi.
Customer charges
Consumer category
Low Tension
LT-I: Domestic (Units/ month)
0-50
51-100
101-200
201-300
301-400
401-800
Above 800 units
LT-II: Non-Domestic/ Commercial (Units/
month)
0-50
51-100
101-300
301-500
Above 500 units
LT-II (C): Advertisement Hoardings
LT-II (D): Haircutting Salons with
consumption up to 200 units per
month
0-50
51-100
101-200
LT-III: Industry up to 20 HP
LT-III: Industry 21-50 HP
LT-III: Industry 51-100 HP
LT IV: Cottage Industries
LT V: Agriculture
LT VI: Street Lighting & PWS
LT-VII: General purpose
LT-VIII: Temporary supply
High Tension
HT Consumer at 11 kV
HT Consumers at 33 kV
HT Consumers at 132 kV and above
8|P a g e
INR./ month
INR. 25
INR. 30
INR. 50
INR. 60
INR. 80
INR. 80
INR. 80
INR. 45
INR. 55
INR. 65
INR. 65
INR. 65
INR. 70
INR. 45
INR. 55
INR. 65
INR.75
INR. 300
INR. 1125
INR. 45
INR. 30
INR. 50
INR. 60
INR. 65
INR. 1,685
INR. 1,685
INR. 3,370
vii.
In case of LT- I (A), LT-I (B), LT-II(A), LT-II(D), LT-IV and LT-V (C), if
payment is made after due date, the consumers are liable to pay, Delayed Payment
Surcharge (DPS) per month on the bill amount at the rates given in table below.
LT-I (A)
LT-I (B), LT-II (A), LT-II (D), LT-IV
and LT-V (C)
b)
In case of LT- II(B), LT-II(C), LT-III, LT-VI and LT-VII, the Licensee shall levy
Delayed Payment Surcharge (DPS) on the bill amount at the rate of 5 paisa/
INR.100/ day calculated from the due date mentioned on the bill, up to the date of
payment or INR. 150 whichever is higher. In case of grant of installments, the
Licensees shall levy interest at the rate of 18% per annum on the outstanding
amounts compounded annually and the two (DPS and Interest) shall not be levied
at the same time.
HT Category
a)
viii.
The Licensees shall charge the Delayed Payment Surcharge (DPS) per month on
the bill amount at the rate of 5 paisa/ INR. 100/ day or INR. 550 whichever is
higher. In case of grant of installments, the Licensee shall levy interest at the rate
of 18% per annum on the outstanding amounts, compounded annually and the two
charges shall not be levied at the same time.
Reconnection charges
Low Tension services
LT-I (A)
Overhead LT services
U.G. services
High Tension service
11 kV
33 kV
132 kV and above
ix.
INR. 25
INR. 75
INR. 200
INR. 1,000
INR. 2,000
INR. 3,000
Testing charges
Installation
The first test and inspection of a new installation or
of an extension to an existing installation.
9|P a g e
LT
HT
Nil
Nil
INR. 200
INR. 100
INR. 300
INR. 2,000
INR. 3,000
INR. 3,000
INR. 3,000
INR. 150 per sample
xi.
INR. 20
INR. 100
INR. 100
INR. 100
INR. 100
INR. 600
xii.
Capacitor surcharge
LT consumers having connected loads mentioned in table below shall pay capacitor
surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if capacitors are
found defunct.
Category
LT-II and LT-VII (A)
LT-III and LT-VI (B)
xiii.
Connected load
<10 kW
<20 HP
xiv.
10 | P a g e
consumer requests for further extension, the same can be extended for another 6 months
with the same tariff as applicable to Temporary supply category. After the expiry of 12
months, the consumer is at liberty to seek further extension provided, the consumer pays
twice the regular tariff or the consumer has the choice of availing of regular supply.
11 | P a g e
Sl. No
Category
TSNPDCL
1
2
3
4
6
7
HIGH TENSION
HT Category at 11 kV
HT-I Industry
HT-II Others
HT-III Airports, Railways and Bus stations
HT -IV Lift Irrigation and agriculture & CPWS
HT-VI Townships and Residential Colonies
HT-Temporary Supply
1.65
2.03
1.88
0.36
1.31
2.76
1.66
2.03
1.78
0.21
1.28
-
8
9
10
11
12
HT Category at 33 kV
HT-I Industry
HT-II Others
HT -IV Lift Irrigation and agriculture & CPWS
HT-VI Townships and Residential Colonies
HT -Temporary Supply
1.48
1.81
1.26
1.32
3.34
1.44
1.78
0.86
1.35
-
13
14
15
16
17
18
1.35
1.77
1.51
1.24
1.41
-
1.34
3.55
1.28
1.42
1.28
12 | P a g e