You are on page 1of 2
Design of Temporary Tubular Suspended Working Platform FORTHE PROJECT AT Jalan Toa Payal TECHNICAL DATA 1885950 - 2000 Allowable yield stress of steel fy = 275.00 Nimm2 Sectional Details of Suspended Scaffold Access Platform Existing RC 1 Beam 1.50 M 1.50 M 1.50 M fe) Safety Rail \ 1.00 M [Working Platform — 220 _KgiM M 10.80, M$ p> LOADING CONSIDERATION : Standards spacing Dead Load Less than Hee 1.80 Mole 3mStandard tubes [2.00] X 6.00 | ke Transion /Ledger | _3.00|_X 4.50| Ke/No. 13.50 ke Bracing Member 0.00] Xx. 0.00 0.00/ ke | Joint Pin [0.00/ x 053 0.00/ ke | Clamps 400] xX 0.60] 2.40 ke Tread Board 6.00| xX 8.00|Ke/No| = | 4800/ kx | J Dead Load for W2 = 69.90 [Kg = kN | Live Load 720.00/ke = | _220)kN_| Partial Load Factor for Live Load. is 1.60|Ke | 352 Ke System Live Load wi 3.52 KN/M2" Dist. from the support A LI= 130 M the System Load Mi= 0,99 KN-M_— Moment produeed by WI Zx= 3.60 om3 Size & Properties of Tube The size ofthe steel tbe provided 4 = 48.60 mm dia Wall thickness of the tube © = 250 mm Inx= 13.80 emt Zxx= 4.60 md ey = 1ST em As= 557.00 mm2 Provide 1.00 nos of transion tubes foreach suppor of the acess platform which willhave — Zxx= 3.92. em3 which is greater than Zx= 360 ems > oK Front View

You might also like