You are on page 1of 3
(acai) Apa (yt geal) As pds SWISS INTERNATIONAL L.L.C. 'Soo) (Part of ISO 9001 : 2008 Certified A Swiss Group 0. Bot, oat Code 28 Kn Suerte ot Onen Tol: +968-24496141, Fax: +968-24496041 small: swissco@omantel net.om,svissoman@kgroup.ae, Website: ww Kgroup.com ‘On-shore & of shore Mechanical Fabrication d Cros county piping Distric Coling sarvices & MEP, Thermal, Cryogenic and Refractory Insulation, Freprofing & Fiesop Dry/ Wet Shacrete and Aled Specialized Civil apliation, Oifeld Contracting and Inport/ Export of Oifeld Supplies, Marne (Sip Repairs and Accommodation Modules December 14, 2015 Page 1 of 3 Ref: SO/QTN/091/15 M/s Al Hassan Engineering Co. S.A.0.G. P.O. Box: 1948, PC: 112, Ruwi Muscat, Sultanate of Oman. 968 ~ 2481 0575 968 - 2481 3412 Attn, — : Mr. Ranganathan. A (GSM: 9388 3589). Subject : Supply & Application of Cementitious Fire Proofing Works for Structural Steel. Project: PDO - Kauther Depletion Compression Phase - 2. Your Ref.: Email, Dated: November 25, 2015. Dear Sir, With reference to your above referred mail for the subject job works as desired, we are pleased to submit our revised offer for fireproofing works using CAFCO Fendolite MII System (manufactured by Promat) for this project. Our offer is detailed as under:- JOB SPECIFICATION : 1. Check the existing surface. 2. Supply and apply fireproofing material onto steel structures. The steel sections up to and including 203mmX203mm shall be protected by solid fill method and others shall be profile. L IFICATION :- CAFCO Fendolite MIL CAFCO PSK 101 CAFCO Plastic Coated Galvanised Mesh. CAFCO Helical CD Weld Pin (Stainless Steel) - for structures only. CAFCO Top Coat 200. Silicone Sealant ~ Promaseal Mastic Sealant. $S316L Tie -in wire. NoMa wy OUR SCOPE OF WORK: 1. We shall carryout the job as per above specification. 2. Provision of all Fireproofing materials, accessories, etc. required to carryout the job. 3. We shall provide all the equipments, trained technicians, supervisors, etc. required to carryout the job as per the above specifications. 4 UAE. Operations: Global Operations: Swiss ital Engg, & Maine Co. LLC. - (Aman) KJ Group rteratoal (hl) Pt Lid - (etal) ‘Al Swiss insulation Co. (LL.C.) - (Shay, Dubai) “KS Foundation - (Kerala) Ecotech Company (LLC) - (Aan, Dubal Stat) Moga Gas & Oi Field Equipment & Senes (LLC) (bu Di) a 4) Group Inman Lid. _ (Canada) December 14, 2015 Page 2.0f3 Ref: SO/QTN/091/15 4, We shall follow all the necessary QA/QC and safety procedures at site and shall comply with the standard application procedures. AHEC'S SCOPE :- 1. Touch ups paints for welding (CAFCO Helical CD Weld Pin) areas. 2. Provision of potable water in proper storage tanks, 3-phase electricity, material storage, equipment handling facilities, disposal of wastage etc. 3. Provision of free accommodation, food, local transport and other facilities at site. 4, Provision of erected scaffolding at free of cost. 5. Provision of site office space with all preliminary facilities and car park facilities. 6. 7. . Any touch-up / repair of fireproofing works damaged due to other trade activity. . Any approvals required from the local authorities like Civil Defence to be arranged and provided by the main contractor at no extra cost to M/s. Swiss Intl LLC. 8. Any Third party Inspection to be arranged and provided by AHEC at no extra cost to M/s. Swiss. PRICE:- Our offer to carry out fireproofing as mentioned above shall be as per the attached sl Area Unit i Materials Thickness! [Shon] | Price Total Price 7 a. [omR] Medium density CAFCO 1. | Fendolite MII System ~ 34mm 19,907 33.000 656,931.000 Structures Medium density CAFCO 2, | Fendolite MIISystem- | 34mm 80 33,000 2,640.000 Equipment PRICE VARIATION:: 1) The prices given in the above mentioned annexure I are for the said quantities based on the bill of quantity provided by you and under assumption of continuous hindrance free work front. 2) Allareas shall be measured / re-measure after application. 4 December 14, 2015 Page 3 of 3 Ref: SO/QTN/091/15 ‘TERMS OF PAYMENT :- Tobe discussed and mutually agreed. VALIDITY :- Our offer is valid for 30 days from the date hereof. COMMENCEMENT:- To be mutually discussed and agreed upon after signing of contract. JOB/CONTRACT ACCEPTANCE :- Itis mandatory to receive our official job acceptance for any contractual obligations. FORCE MAJEURE CLAUSE : Standard Force Majeure Clause prevailing in Oman governs our offer. INSURANCE :- Our Employees are covered under Oman Workmen compensation policy however our quotation for the subject job is based under the presumption that you have already effected the necessary / exclusive Insurance coverage to the Machines / Equipment / Structures, etc., for the damage that might occur during the course of our job execution. We trust that you will find our proposal in line with your requirement. Kindly do not hesitate to contact us in case you require any further information. Yours truly, For Swiss International L.L.C. Adm — Jahangir Alam Sales/Project Engineer (GSM: 92730137)

You might also like