1. Vertical Loads
30 PSF
(20 PSF Live Load and 10 PSF Dead Load)
On the Northport Fire Station No. 2 building, the vertical loads total to 30 PSF, which includes
the live and dead loads. The roof live load is 20 PSF and the roof dead load 10 PSF. The
following flow chart explains the process of load distribution in the flat roof area of the building:

Loads bearing on PVC roof are transferred to 1 1/2" x 22 gauge type "IR" metal
decking.

Metal decking distributes load to K-series steel joists.

K-Series steel joists transfer load to a wide flange (W) stuctural steel beam member.

The W-member steel beams transfer the load to a hollow structural steel (HSS) column.

The HSS columns transfer the load to a concrete pier (Figure 1) or spread footing
(Figure 2).

In the case of a concrete pier, the load is transferred from the pier to the spread footing.

Lastly, the spread footings transfer the load to the earth. The earth reacts with the gravity load pushing
upwards. The soil has a bearing value of 2,500 PSF.

Analysis area for vertical load tracing

Structural Area Map

Figure 1 Load Distribution with concrete piers

Figure 2 Load Distribution with concrete spread footings only

2. Lateral Loads (Wind)


General
For Northport Fire Station No. 2, there are a few methods to stabilize lateral loads. The majority
of the structural framing is stabilized by moment connections. A moment connection is a welded
beam to the columns for this project. The beam flange welds transmit full flange strength to the
column. The shear tab, welded to the column, and bolted to the beam web, supports the beam
until it is welded and offers permanent shear resistance. This connection stabilizes a frame
against lateral forces without the use of diagonal bracing or shear walls. Moment connections
stabilize the flat roof area in the central part of the building and the north metal truss area.
Structural CMU walls support lateral loads in the south end of the building. Metal trusses on the
south transfer their loads to the structural CMU walls. A CMU shear wall in the south end also
supports lateral loads in the east and west directions.
In general, lateral loads in the metal truss roof systems are transferred through the roof
diaphragm and down to CMU structural walls or steel framing members. The flat roof system
transfers the load to structural steel members and down to the earth.

Moment connection example

North Wind at 90 mph, 21 PSF

South Wind at 90 mph, 21 PSF

West Wind at 90 mph, 21 PSF

East Wind at 90 mph, 21 PSF

Structural Analysis
20

19

3. Special Structures

See architectural for roofing above metal deck.

15

12"

12"

6"

6"

1.5", 22 gage, "wide rib"metal decking

1.5", 22 gage, "wide rib"metal decking

L2x2x16ga continuous bent edge angle.


Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

Cold formed metal trusses @


48" o.c. max by truss designer.

L2x2x16ga continuous bent edge angle.


Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

Cold formed metal trusses @


48" o.c. max by truss designer.

Truss Section Cut, South End Vertical Load


Coordinate heel height and end
profile with architectural

TOP OF PARAPET
15' - 4"

See architectural for additional infill stud


framing and waterproofing required

Infill 600S162-43 (18ga) @ 16" o.c.


typical w/ 1/2" exterior gypsum
sheathing, see architectural for
additional information

Veneer - see architectural

Description
Compression
D
F
S

P
0
1

10

d
oa

dL

ea

Tension

1.5", 22 gage, "wide rib" metal decking

PS

FD
ea

dL

Sloping steel beam - see plan

Roof

Metal Truss

oa

2.5K1s @ 5'-0" o.c. max

Sloping steel joist - see plan

Fasten 6" stud walls together


w/ #8 screws @ 12" o.c. max
between each pair of studs

600S162-97 (12ga) @ 16" o.c. typical


w/ 1/2" interior gypsum sheathing,
see architectural for additional information

3/21/2014 11:11:50 AM

Veneer - see architectural

60'-0"
Structural CMU Wall

Veneer - see architectural

Copyright Ward Scott Architecture, Inc. All Rights Reserved

NORTHPORT AL 35473

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

See architectural for flashing

20 PSF Live Load

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

HWY 69 NORTH

TOS ADMIN EL
17' - 4"

CITY OF NORTHPORT FIRE STATION NO. 2

Coordinate heel height and end


profile with architectural

C:\Users\Josh\Dropbox\__JOBS\JOSH\Ward Scott\Northport Fire Station #2\Northport Fire Station #2.rvt

See architectural for roofing above metal deck.

600S162-43 (18ga) @ 16" o.c. typical


w/ 1/2" exterior gypsum sheathing,
see architectural for additional information

Fasten 600T200-54 to slab with


1/2" dia x 4" Simpson Titen HD
anchors @ 4'-0" o.c. max

This truss is a typical truss on Northport Fire Station No. 2 on the south end of the
building. The is a Triple Howe truss spanning 60. The truss has 20 PSF live Load and a
10 PSF dead load applied to it. The trusses throughout the building primarily bear on
structural steel beams. However, in this location on the south end, the trusses bear on
structural CMU walls. Overall, the trusses are braced and attached to structural steel
members or structural CMU walls.

CONSTRUCTION
DOCUMENTS

#4 (18"x48") hook bars @ 2'-8" o.c.


Fill all voids below finish
floor with grout

1st Floor FF EL
0' - 0"

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

3-17-2014
DATE:
PROJ NO: 13-054

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

REVISIONS
#

DESC

DATE

8" CMU w. #5 bars @ 32" o.c.


6" CMU filled w/ grout

SECTION CUTS &


DETAILS

Section 1
3/4" = 1'-0"

S502

Structural Analysis
20

19

15

12"

See architectural for roofing above metal deck.

12"

6"

6"

Truss Section Cut, South End Lateral Load (Wind)

1.5", 22 gage, "wide rib"metal decking


L2x2x16ga continuous bent edge angle.
Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

See architectural for roofing above metal deck.


1.5", 22 gage, "wide rib"metal decking

Cold formed metal trusses @


48" o.c. max by truss designer.

L2x2x16ga continuous bent edge angle.


Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

Cold formed metal trusses @


48" o.c. max by truss designer.

Coordinate heel height and end


profile with architectural

Coordinate heel height and end


profile with architectural

North Wind at 90 MPH,


21 PSF

Uplift on Roof

See architectural for additional infill stud


framing and waterproofing required

Infill 600S162-43 (18ga) @ 16" o.c.


typical w/ 1/2" exterior gypsum
sheathing, see architectural for
additional information

Veneer - see architectural

1.5", 22 gage, "wide rib" metal decking

Metal Truss

Sloping steel beam - see plan


2.5K1s @ 5'-0" o.c. max

Sloping steel joist - see plan

60'-0"

Structural CMU Wall

Fasten 6" stud walls together


w/ #8 screws @ 12" o.c. max
between each pair of studs

Deflection caused by
(wind)

600S162-97 (12ga) @ 16" o.c. typical


lateral load
w/ 1/2" interior gypsum sheathing,
see architectural for additional information

3/21/2014 11:11:50 AM

Veneer - see architectural

600S162-43 (18ga) @ 16" o.c. typical


w/ 1/2" exterior gypsum sheathing,
see architectural for additional information

Veneer - see architectural

Copyright Ward Scott Architecture, Inc. All Rights Reserved

NORTHPORT AL 35473

TOP OF PARAPET
15' - 4"

Roof

HWY 69 NORTH

See architectural for flashing

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

CITY OF NORTHPORT FIRE STATION NO. 2

C:\Users\Josh\Dropbox\__JOBS\JOSH\Ward Scott\Northport Fire Station #2\Northport Fire Station #2.rvt

TOS ADMIN EL
17' - 4"

This is a section cut of the south end of the building with a metal truss bearing on
structural CMU walls. The north wind loads acting on the structural system of the building
creates a lateral force that stresses the structural CMU walls in a horizontal direction. The
structural CMU walls deflect the concrete footings and the trusses react to limit deflection.
The wind creates an uplift force on the trusses, but the truss bracing reacts the uplift to
hold the them in place.
Fasten 600T200-54 to slab with
1/2" dia x 4" Simpson Titen HD
anchors @ 4'-0" o.c. max

CONSTRUCTION
DOCUMENTS

#4 (18"x48") hook bars @ 2'-8" o.c.

Fill all voids below finish


floor with grout

1st Floor FF EL
0' - 0"

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

3-17-2014
DATE:
PROJ NO: 13-054

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

REVISIONS
#

DESC

DATE

8" CMU w. #5 bars @ 32" o.c.


6" CMU filled w/ grout

SECTION CUTS &


DETAILS

Section 1
3/4" = 1'-0"

S502

S500

1' - 0"

6"

6"

16" concrete lintel

30'-0"

Cold formed metal trusses @


4'-0" o.c. max, 6/12 slope

16" concrete lintel

16" concrete lintel

56' - 6"

57' - 0"

16" concrete lintel

62' - 11 1/4"

6"

12' - 3 1/2"

S500

16" concrete lintel

12' - 3 1/2"

12' - 3 1/2"

16" concrete lintel

6"

13' - 10 3/16"

6"

21' - 4"

X
10
X
10

1' - 0"
6"

8
3/

8
3/

W14X22

W14X22

6"

6"

W18X35

20' - 5"

W14X22

6"

1' - 4"

13' - 1 3/4"

11' - 6"

1' - 0"
6"

10' - 3"

W18X35

W16X26

13' - 10 1/4"

W14X22

2.5K1

2.5K1

2.5K1

13' - 8"

12' - 6"

W24

8
3/
X
5
5X
S
S
H

Cold formed metal trusses @


4'-0" o.c. max, 10/12 slope

18' - 8"

Column below and


post above - see
column schedule

8
3/
5X
5X
SS
H
13' - 10 1/4"

S503

12' - 8 15/16"

W14X22

18' - 1 1/2"

12' - 4"

8
3/
X
5
5X
S
S
H

MC

8
3/
X
5
5X
S
S
H

3"

29' - 5 5/8"

13' - 1 3/4"

S504

W21X44

12' - 8 15/16"

6"

Provide L4x4x1/4" edge angle


anchored to CMU wall for roof
edge support

X
10
X
0
1
SS
H

SS
H

6"

8
3/
X
5
5X
S
S
H

6"

9"

10K 200/100

1' - 0" 6"

21' - 4"

10' - 10 1/8"

24' - 0"

15' - 6 11/16"

6"

9"

8' - 4"

W18X35

8
3/
X
5
5X
S
S
H

15' - 6 11/16"

6"

W14X22
12' - 4"

11' - 3"

3"

23' - 10"

13' - 1"

13' - 8"

W16X26

11' - 3"

8
3/
5X
5X
SS
H

8
3/
X
5
5X
S
SW14X22
H

13' - 1"

12' - 4"

8
3/
X
5
5X
S
S
H

3"

12' - 8 15/16"

8
3/
X
5
5X
S
S
H

8
3/
5X
5X
SS
H

7' - 6"

64' - 10"

10

6' - 6"

8
3/
5X
5X
13' - 8"
SS
W14X22
H

11

W14X22

25' - 0"

W16X26

13' - 1"

12' - 8 15/16"

W16X26

12' - 4"

2' - 8"

12' - 8 15/16"

14' - 0"

13' - 6 3/4"

W14X22

13

4' - 6"

MC

12

8
3/
5X
5X
SS
H

8
3/
5X
5X
13' - 8"
SS
W14X22
H

LOW

HIGH

13' - 8"
MC

9' - 6"

3"

2.5K1
2.5K1
W14X22

2.5K1

8
3/
5X
5X
SS
H

6"

14

6"

2.5K1

2.5K1

2.5K1

W14X22
2.5K1

W14X22

17' - 4"

W14X22

17' - 4"

HIGH W14X22

TOS varies

13' - 1"

8
3/
5X
5X
SS
H

17' - 4"

8
3/
X
5
5X
S
S
H

15' - 4"

2
S501

23' - 6"

LOW W14X22

17' - 4"

8
3/
X
5
5X
S
S
H

13

64' - 8"

5' - 0"

5' - 0"

6"

15

7' - 0"

9"

6"

1' - 0"

8
3/
5X
5X
SS
H

17' - 4"

8
3/
5X
5X
SS
H

17' - 4"

17' - 4"

16

W14X22

17' - 4"

17' - 4"

17' - 4"

17

W14X22

18

W14X22

8
3/
5X
5X
SS
H

6"

4' - 0"

6"

17' - 4"

17' - 4"

1' - 0"

S502

17' - 4"

2' - 9"

1' - 0"

8
3/
5X
5X
SS
H

19 20

9"

MC

17' - 4"

8
3/
X
5
5X
S
S
H

4' - 0"

8
3/
X
8
5
3/
5X
5X SS
5X
H
SS
H

6' - 8"

W14X22

17' - 4"

17' - 4"

5' - 0"

8 MC
3/
X
5
5X
S
S
H

17' - 4"

35' - 4"

15' - 2"

W14X22

17' - 4"

8' - 0"

1' - 0"

15' - 4"

8
3/
X
5
5X
S
S
H

Cold formed metal trusses @


4'-0" o.c. max, 6/12 slope

8
3/
5X
5X
SS
H

17' - 4"

8
3/
X
5
5X
S
S
W14X22
H

17' - 4"

MC

6"

MC HIGH W14X22

9"
8
3/
X
15' - 4"
5
5X
S
S
H

15' - 2"

17

8
3/
X
5
5X
S
S LOW W14X22
H

16

6"

3' - 8"

75' - 4"

Sheet Notes:
1. See S001-S006 Sheets for typical details and general notes.
2. Reference all elevations to finish floor elevation (+) 0'-0"
3. See plan for Joist Bearing Elevations, and Truss Bearing Elevations. (TOS) = Top of Steel Beam
4. Roof construction 1 1/2" x 22 ga. type "IR" painted metal deck on steel joists or on light gauge metal trusses supported by steel beams. See sheet S005 for attachment details.
5. All beam reactions are working (unfactored). Minimum reaction shall be taken as 10kips. Unless noted otherwise design 18" and deeper beams for a minimum reaction of 25kips.
6. Refer to architectural drawings for all dimensions, slopes, elevations, etc... not illustrated on this plan. Coordinate all final dimensions and elevations with architectural.
7. Truss loading: Top Chord Live Load = 18psf for 6/12 slope & 14psf for 10/12 slope, Top Chord Dead Load = 10psf, Bottom Chord Dead Load = 10psf.
8. Truss requirements: (note that all of these requirements must be included in the truss submittal prior to receiving approval)
a) Furnish design calculations sealed by a Professional Engineer licensed in the state of Alabama for all truss members.
b) Truss manufacturer shall specify and provide all truss to truss and truss bearing connections, and not contain mention of "by others" in relation to design.
c) Truss manufacturer shall be responsible for providing and illustrating all temporary and permanent bracing required.
d) Truss manufacturer shall provide 6", 18 gage, studs minimum for top and bottom chords of trusses.
9. MC = steel moment connections, see roof plan for locations and see typical detail on S005 for additional information.

1/8" = 1'-0"

ROOF FRAMING PLAN

6"

W14X22

8
3/
X
5
5X
S
S
H

6"

6' - 0"

10

6" 6' - 0" 6"

Roof hatch - see


architectural and S005

W16X26

10' - 4"
1' - 0"
6"

211' - 8"

3' - 0"

6"

9"

8
3/
5X
5X
SS
H

W14X43 LOW

15' - 6 11/16"

12' - 8 15/16"

8
3/
X
5
5X
S
S
H

5' - 6 1/2"

2' - 11 7/8"

14' - 9"

8
3/
X
5
5X
S
S
H

8
3/
X
5
5X
S
S
H

24' - 0"
8
24' - 0"
3/
5X
5X 24' - 0"
SS W14X22 HIGH
H

3' - 0"

6"

MC

S501

13' - 8"
8
3/ 15' - 6 11/16"
5XW14X43
LOW
5X
SS
W14X22
H
HIGH

W16X26

3' - 4 1/2"

48' - 0"

12KSP 250/100 + AHUs

6"

12KSP 250/100 + AHUs

57' - 0"

12KSP 250/100 + AHUs

6" 1' - 0"

80' - 4"

1' - 0" 6"

16" concrete lintel

16" concrete lintel

16" concrete lintel

16" concrete lintel

9' - 5"

6"

11' - 1"

11' - 0"

6' - 6"

10K 200/100

10K 200/100

12K 200/100

16K 200/100

12KSP 250/100 + AHUs

6"

3' - 8"

W24X76

W24X76

W24X76

14' - 4 1/2"

11' - 8 1/2"

22' - 0"

6"

9"

3' - 5"

21' - 0"

6"

10K 200/100

10K 200/100

12K 200/100

16K 200/100

10K1

10K 200/100

9"

10' - 8"

20' - 10 1/2"

12' - 2 1/2"

10K 200/100
10K 200/100
12K 200/100
10K1

12K 200/100
10K1

10' - 8"
W21X44

5' - 0"

10K1
13' - 0" 16K 200/100

6' - 9"

6"

10K1

16K 200/100
10K1

12KSP 250/100 + AHUs


12K 200/100
16K 200/100

12KSP 250/100 + AHUs


12K 200/100
16K 200/100

2' - 4"

6"

9"

10K1

1' - 3" 2' - 9"

10K 200/100

12KSP 250/100 + AHUs


12K 200/100
16K 200/100
W14X22 LOWER 10K1

12KSP 250/100 + AHUs


W18X35
16K 200/100

12KSP 250/100 + AHUs


16K 200/100

12KSP 250/100 + AHUs


16K 200/100

10K 200/100

12KSP 250/100 + AHUs


10K 200/100
16K 200/100

12KSP 250/100 + AHUs


W14X43 LOW

16K 200/100

12KSP 250/100 + AHUs


10K 200/100
16K 200/100

10K 200/100
W18X35
W14X22 HIGH

12K 200/100
16K 200/100
W14X22 HIGH

16K 200/100

10K 200/100
16K 200/100

12KSP 250/100 + AHUs


10K 200/100

MC

200' - 0"

16K 200/100

12KSP 250/100 + AHUs


10K 200/100

9"
6"
21' - 4"
17' - 8"
30' - 2"

12KSP 250/100 + AHUs

9"
10K 200/100

2' - 4"
16K 200/100

10K 200/100
16K 200/100

12KSP 250/100 + AHUs


10K 200/100
W14X22
LOW
16K 200/100

W14X22
LOW

MC
HIGH W14X22
MC
W14X22

W14X22
MC
W14X22
HIGH

9"
1' - 7"

12KSP 250/100 + AHUs


W14X43 LOW

16K 200/100

10K 200/100

3' - 2 1/2"
6"
9"

5"
4' - 9"
4' - 0"

16K 200/100

3' - 7"

W14X22

10K 200/100

1' - 8"
1' - 7"
1' - 0"

14K 200/100

12KSP 250/100 + AHUs


10K 200/100

6"

C:\Users\Josh\Dropbox\__JOBS\JOSH\Ward Scott\Northport Fire Station #2\Northport Fire Station #2.rvt

3/21/2014 11:11:47 AM

Copyright Ward Scott Architecture, Inc. All Rights Reserved

1' - 0"

16K 200/100

9"

6"
9"
6"
3' - 8"

LOW W14X22
MC
MC

6"
8' - 8"
W14X22

6"
23' - 6"

6"
9"
20' - 7"
1' - 2"
6"
6"
1' - 6"
6"

36' - 4"

W14X22

W14X22

W14X22

1' - 0"
W14X22
MC
MC

HIGH
W14X22

MC

MC

2' - 2"
9"
1' - 0"
24' - 4"
3' - 8" 4' - 10"

9"

3"
6"

1' - 0"
6"

Ridge

1' - 0"
6"
9"

3' - 0"
3' - 0"

6"
6"
8' - 0"
6"
6"
34' - 10"

Steelbracing

6"

24'-0"

Structural Analysis

Temporary Truss Bracing:

Hip gable roofs require less bracing


than gables. They tend to self-brace
because of the sloping ends. Even so,
the same concepts of span and length
determine the nature and frequency of
bracing. Two spans lengths need
attention - spans up to 44 and spans
which are 44 to 54. For spans up to
44 m, diagonal bracing is only
required in the gable section between
hip gable ends. That is, between the
apex of opposing ends. Specific
bracing requirements depend on
whether the roof length (L) is longer or
shorter than the half truss span (h). In
this case the shorter scenario occurs.

HWY 69 NORTH

CITY OF NORTHPORT FIRE STATION NO. 2

DATE

S300

ROOF FRAMING
PLAN

DESC

REVISIONS

3-17-2014
DATE:
PROJ NO: 13-054

CONSTRUCTION
DOCUMENTS

NORTHPORT AL 35473

21'-0" Elevation

25'-5 1/2" Long

19

12"
12"
6"

15

See architectural for roofing above metal deck.

9.25"

9.25"

7.25"

18' Hieght
L= 305.47"
D= 7.25"
305.47/7.25 = 42.13"< 50" Good

1.5", 22 gage, "wide rib"metal decking


L2x2x16ga continuous bent edge angle.
Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

21' Height
L= 356.81"
D= 9.25"
356.81/9.25= 38.52"< 50" Good

20

6"

Cold formed metal trusses @


48" o.c. max by truss designer.

24' Height
L= 407.29"
D= 9.25"
407.29/9.25= 44.03" < 50" Good

See architectural for roofing above metal deck.

Cold formed metal trusses @


48" o.c. max by truss designer.

Coordinate heel height and end


profile with architectural

*Assume ground brace to be at 45


degrees*

7.25"

There will need to be ground bracing for the trusses to keep the them
from falling over before they are permanently braced. The ground
bracing system will use multiple sizes of 2x lumber. The bracing
system will have vertical member that runs up to the top of the truss
where it meets a lateral member that runs on top of the trusses.
Since the truss spans 40', the top chord temporary lateral bracing
members must be 8" O.C. max. There will be a long diagonal
member running into the ground and secured with a stake. In
addition, there is a horizontal member and short diagonal members
to provide support for the bracing system. The tallest point of the
truss, 24-0", will use a 33'-11" long diagonal using 2x10s in a "T"
formation for the long diagonal support. The intermediate heights on
either side at 21'-0" will use 29'-8" diagonals using 2x10s stacked in
a "T" formation for the long diagonal support. Lastly, the lower level
heights on either side at 18'-0" will use 25'-5 1/2" diagonals using
2x8's stacked in a "T" formation for the long diagonal support.

9.25"
Slenderness Ratio Calculations:

9.25"
Summary

1.5", 22 gage, "wide rib"metal decking

TOS ADMIN EL
17' - 4"

See architectural for additional infill stud


framing and waterproofing required

1.5", 22 gage, "wide rib" metal decking

DATE

S502

SECTION CUTS &


DETAILS

DESC

REVISIONS

3-17-2014
DATE:
PROJ NO: 13-054

CONSTRUCTION
DOCUMENTS

NORTHPORT AL 35473

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

Infill 600S162-43 (18ga) @ 16" o.c.


typical w/ 1/2" exterior gypsum
sheathing, see architectural for
additional information

Sloping steel beam - see plan


2.5K1s @ 5'-0" o.c. max

Sloping steel joist - see plan

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

HWY 69 NORTH

See architectural for flashing

Connection of trusses to wall


and any required permanent
bracing to transfer forces
into the wall below shall be
provided/specified by the
truss designer/manufacturer.

Fasten 6" stud walls together


w/ #8 screws @ 12" o.c. max
between each pair of studs

600S162-97 (12ga) @ 16" o.c. typical


w/ 1/2" interior gypsum sheathing,
see architectural for additional information

600S162-43 (18ga) @ 16" o.c. typical


w/ 1/2" exterior gypsum sheathing,
see architectural for additional information

Fasten 600T200-54 to slab with


1/2" dia x 4" Simpson Titen HD
anchors @ 4'-0" o.c. max
#4 (18"x48") hook bars @ 2'-8" o.c.

4" concrete slab on grade


w/ 6x6 W1.4xW1.4 wwf

8" CMU w. #5 bars @ 32" o.c.

CITY OF NORTHPORT FIRE STATION NO. 2

TOP OF PARAPET
15' - 4"

Veneer - see architectural

Veneer - see architectural

Veneer - see architectural

Fill all voids below finish


floor with grout

1st Floor FF EL
0' - 0"

6" CMU filled w/ grout

Ground Stake

L2x2x16ga continuous bent edge angle.


Fasten deck to edge angle and trusses
using a 36/4 pattern of #12 TEK Screws.
Use (3) #10 TEK Screws for sidelaps of deck.

3/4" = 1'-0"

Diagonals

18'-0" Elevation

Coordinate heel height and end


profile with architectural

Truss Span 40'-0". Max


Spacing for bracing 8'-0"
O.C. max
Section 1

Ground Brace at
33'-11"
Vertical Member
at 24'-0"

C:\Users\Josh\Dropbox\__JOBS\JOSH\Ward Scott\Northport Fire Station #2\Northport Fire Station #2.rvt


3/21/2014 11:11:50 AM

Copyright Ward Scott Architecture, Inc. All Rights Reserved

29'-8" Long
33'-11" Long

Structural Analysis
T.O Truss 24'-0"

You might also like