BARAKA POWER LIMITED

51 MW Power Plant
Fenchuganj ; Sylhet

Plant Tripping Report


Grid Power Available: (a) Yes
Date:

(b) No

Cause of Tripping Alarm:


Alarm Code display on belowa. CRP1
..
b. CRP2
.
c. CRP3

Taken Action by Shift Engineer:

Signature for Asst. Shift Engineer


Signature for Shift Engineer
ANY OTHERS COMMENTS: