Dropped Object Campaign
Dropped Object Campaign
DAY 1
Crown Block, Sheaves, Handrails, Safety cables, Nuts & Bolts, Pins,
Shakles, Grating, Any loose or bent items, Lights & Fixtures, Any items
that are worn and need to be changed. Excess Tar. Air hoist sheaves
and safety lines. Any signs of dirt or rust. Fall arrestors
Date:
Inspected by:
Inspected by:
Remarks:
DAY 2
Beams, Safety pins, Any bent members, ladder, Condition of ladder &
safety cage, Safety chains, lights & fixtures. Cross beam of torque tube.
Torque tube pins and safety. Tong counter weights.
Date:
Inspected by:
Inspected by:
Remarks:
DAY 3
Monkey board, Fingers, Safety belt condition, Handrails, Beams,
Grating, Ropes, Shackles, Safety pins, Talkback, Lights & Fixtures. Any
items that are worn and need to be changed. Condition of stabbing
board hoist and cable. Etc. Any signs of dirt or rust.
Date:
Inspected by:
Inspected by:
Remarks:
DAY 4
Beams, Any bent members, ladder, stabbing board, handrails, Grating,
Ropes, Shackles, Safety pins. Condition of stabbing board. Lights &
Fixtures. Travelling block & hook - guards, pins. Torque tube
Date:
Inspected by:
Inspected by:
Remarks:
DAY 5
Everything on the rig floor to the top of the TDS. Complete inspection of
entire TDS and pipe handler. Beams on top of the doghouse.
Date:
Inspected by:
Inspected by:
Remarks:
DAY 6
Everything under the rig floor, check all chain hoists & arrestors. Safety
chains, lights & fixtures. Beams - loose items.
Date:
Inspected by:
Inspected by:
Remarks:
Name of Driller
Signature
Comments