vxsnn aan 132/11kV, 32/40 MVA POWER TRANSFORMER
ao SITE ACCEPTANCE TEST FORMAT
(QSTAR POWER TRANSMISSION SYSTEM EXPANSION PHASE-10
commer
comnact xo: GTC A71A/2010
Hee MRGENERAL ELECTRIC Hee ee oumess.-
L_supstaTion NAME, IS2/L KY LOGISTIC VILLAGE. DRAWING NO PHIO-1A-15-15-PO0S
EQUIPMENT ISDIIRVDIAOMVA POWER ‘CHAPTER NO. Sesame celtics
5, VECEOR GROUP TEST
(Applicable Standard ~ IEC 60076-1:2011- Clause 11.3)
‘Test Set Up
Test procedure
- Do the connections as shown in the fig
. Select the normal tap
Isolate primary/secondary/neutral earth.
|. Short R-r, Apply 3 phase 415V to R-Y-B HV side of the terminals.
Measure the voltages given below table.
From the measured voltages check the following conditions
Condition to check for Dyn
B-b=B-y
Y-y |hog.q) B-b | B7m-A| Bon (393-7
COMPARE THE VALUES FOR THE FOLLOWING COMBINATIONS.
3. Yey <¥eb
4. R-B=R-nt B-n
VECTOR GROUP Dyni: Ok Not OK
1 BIA-A = BIAA
2. 313-6 < Ao@d
3. 313-6 K 4e3-9
A. AoB-2 = 19-394 3838-1 &
% 403-08
step WINESSED VERTED,
LARSEN & TOUBRO KAFIRAMAA/FARSONS BRINCKERHOFF
Sear cs PMaly
NAME VMAGHISVARAN Mean Kendeon
DATE, the OS~ 2013 ly-o¢- 2013 Ba