CHECKLIST FOR FOOTING - POSTPLACEMENT OF CONCRETE

Project
Client
Contractor

ALIBAUGH - SARAL - Plot No. 06


URBAN RESIDENCEY PVT LTD

Date:__________
Sl. No.
1
2
3
4
5
6
7
8
9
10
Comments:

ITEM DESCRIPTION

YES

Check for Observation for honeycombing


Check for Line & Level
Check for Surface finish
Check for Cracks and air bubbles
Check for Method of curing
Check for stripping/Removing of formwork support etc. after
specified duration of stripping time.
Check for position of embedment
Check for Repair and finish all surface defects by
specification / approved method
Check Surface of part of structure is alright and allowed for
subsequent activity / backfilling
Check for Other if any

Contractor's Representative
Name
Designation
Sign
Date

Name
Designation
Sign
Date

NO

N/A

FOR FOOTING - POSTPLACEMENT OF CONCRETE

Date:______________
Remarks