Production Diary Day 1

Date 18/11/16
Location Art Room, Manshead School,
Dunstable
Scene(s) filmed Title sequence
Today we filmed approximately half of the
title sequence, using the artwork from
one of our illustrators. In order to do this,
we used the following equipment a tripod, camera, and camera slider. Within
this, we worked collaboratively in terms of creativity and
technique, however Chris was allocated the role of
camera operator (as shown in the images below). By
working as a team, we were able to set up both the
scene and equipment as quickly as possible, this
including the creation of background props (as shown to
the left, wherein Bailee is holding a drawing that is
featured in the background of some shots). Personally, I
undertook my role as director of the production,
discussing creative and technical decisions regarding
filming with my fellow team members.
Evaluation
Overall, I think that our first day of filming was highly
successful. Having reviewed the footage, we are satisfied
that we have produced work which is of a high quality,
and which we will use within post-production. I think that we communicated well
as a team, combining group input and working together to produce the best
possible footage. We will, however, need to use this location again, when filming
the second half of our title sequence. This is because the remaining illustrations
required were not available to us today,
thus meaning we will have to continue
filming the scene at a later date.