Group 2 Project Status Report Best Case Scenario Rwade
Group 2 Project Status Report Best Case Scenario Rwade
Schedule
Percent Complete:
Cost
Risks
30%
Quality
The project is currently on schedule. Having successfully finished the Business Case (WBS
1.1), Planning (WBS 1.2), and Design (WBS 1.3) phases of the project, we are now in the
position to commence the Build (WBS 1.4) phase.
All elements of the project status remain in the green thus far with little or no variance to
cause for concern.
The current actual value of the project as of 3/25/2016 is $124,855.00. To date, this matches
with the earned value of the project (or budgeted cost) of $124,855.00. With no variances in
either cost or scheduling, the Estimate at Completion remains at $235,560.00 which is inline
with the original proposed budget of the project of $235,560.00. With 70% of the project
remaining based on the schedule, there is a remaining cost of $128,704.00 for the project.
As of the date of this report both Cost Performance Index (CPI) and Schedule Performance
Index (SPI) are both registering at 1 (One) which is an indication that the progress of the project
both in cost and in schedule is going according to the project plan. However, should there be
any variance reported, we will make sure to communicate these and take appropriate steps
necessary for correction.
OPEN ISSUES
Awaiting sign off from client on site design to move forward with Build Phase (WBS 1.4)
OPEN RISKS
Currently there are no open risks
WBS
Planned
Forecasted
Actual
Status
1.1.1
1.1.3
1.2
1.3
1.5
12/22/15
1/14/16
2/24/16
3/25/16
5/26/16
12/22/25
1/14/16
2/24/16
3/25/16
5/26/16
Met
Met
Met
Completed
Completed
Completed
On Schedule
On Schedule
1.6
7/18/16
7/18/16
On Schedule
1.7
8/17/16
8/17/16
On Schedule
Change Request
Number
Request Date
Current Status