You are on page 1of 1

THE ASSOCIATION FOR THE BRITISH ELECTROTECHNICAL INDUSTRY

V2012

BEAMA CONTRACT PRICE ADJUSTMENT CLAUSE AND FORMULAE


A. LIST OF INDICES

Labour Cost Indices (1980=100)


1. Electrical Engineering (CPA/4)

(1970-2012)

2. Mechanical Engineering (CPA/4)

(1970-2012)

Materials Indices (2005=100)


1.
2.
3.
4.
5.
6.
7.
8.
9.

Basic Electrical Equipment (CPA/1)


Mechanical Engineering Materials (CPA/2)
Factory Built Assemblies of Control Equipment
Distribution Transformer Materials
Industrial Electronics Materials
Basic Iron & Steel and of Ferro Alloys
Large Power Transformer Materials
BEAMA/GB-GB/PGCA Composite Index
BISPA Indices for Materials Used for Steel Forgings

(1969-2012)
(1969-2012)
(2000-2012)
(2000-2012)
(2000-2012)
(2000-2012)
(2000 2012)
(2000 2012)
(2000 2012)

B. LIST OF FORMULAE (Home & Export unless otherwise stated)


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Electrical Machinery
Mechanical Plant
Industrial Electronic Equipment
Rotating Electrical Machinery
Distribution Transformers (Home)
Distribution Transformers (Export) [ <10 MVA ]
Distribution Transformers (Export):[ 10 MVA ]
Turbo Generating and Allied Plant
Distribution Feeder Pillars and Associated Distribution Equipment
Switchgear including MV Distribution Fusegear and loose isolators (36 KV)
Switchgear and loose isolators (>36 KV)
Factory Built Assemblies of Control Equipment: Excluding Erection
Factory Built Assemblies of Low Voltage Switchgear (Home) Excluding erection
Large Power Transformers
Annual Service/Maintenance Contracts
(Copies of the above formulae are available on request)

You might also like