Professional Documents
Culture Documents
Subcontractor:
Project No.:
Project Name:
Item welded.:
Welding process:
Reference Document:
Subcontractor
Items to inspect
inspected
initials/date
1.0
2.0
Qualification of welders
3.0
4.0
5.0
6.0
Preheat: temp
7.0
Interpass inspection
Company
Hold
Point
Remarks
inspected*
initials/date
8.0
9.0
Report No.
10.0 Repair
Report No.
Signature:
Date:
Signature:
Date:
Signature:
Date:
C:\RB_Forms\RB26C30.DOT\
www.red-bag.com