You are on page 1of 2

PRINCIPLE SECRETARY IS HEAD OF THE R&B DEPARTMENT, ENGINEER-IN-CHIEF IS THE EXECUTIVE HEAD OF THE R&B DEPARTMENT AND IS IN CHARGE

HIRARCHY

HIRARCHY IN R&B
HIRARCHY
DEPARTMENT
IN OSMANIA UNIVERSITY

PRINCIPLE SECRETARY
ENGINEER-IN-CHIEF
REGISTRAR
EXECUTIVE
ENGINEER-IN-CHIEF
CHIEF ENGINEER

SUPERINTENDING
SUPERTINTENDING
ENGINEER SUPERINTENDING
ENGINEER
ENGINEER HEAD OF THE ENGINEERING DEPARTMENT
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER
DY. EX.ENGINEER
DY EXE ENGINEER
DY EXE.ENGINEER
ASST EXE/ASSTASSTEXE/ASST
ENGINEER
ASST
ENGINEER
EXE/ASST ENGINEER
WORKCHARGED
WORKCHARGED
ESTABLISHMENT
WORK
ESTTCHARGED ESST
POWRS OF ENGINEER-IN-CHIEF
ADMINISTRATIVE
V.C
APPRPROVAL
IS ADMINISTRATIVE
UP TO CERTAIN
SANCTION
LEVEL
AUTHORITY
PROFESSIONALSUPERINTENDING
ADVISOR TO THE GOVT
ENGINEER
ON MATTERS
HEAD OFRELATING
THE ENGINEERING
TO ENGINEERING
DEPARTMENT AND ADVICER TO UNIVERSITY
HIGHEST TECHNICAL SANCTIONING AUTHORITY
INSPECTS THE WORKS COSTING MORE THAN 500LAKHS
CAN PASS EXCESS EXPENDITURE OVER ORIGINAL TECHNIAL SANCTION UP TO 15%
CAN WRITE OFF VALUE OF IRRECOVERABLE STORES OR PUBLIC MONEY
SUPERINTENDING
ADMINISTRATIVE
ENGINEER NOAPPRPROVAL
POWERS
UP TO CERTAIN LEVEL
TECHNICAL SANCTION
TECHNICAL
FORSANCTION
PLAN WORKS
TO ANY
UPTO
EXTENT
RS.500LAPPROVED BY THE V.C

PREPERATION OF
BUDGET
BUDGET
ALLOTMENT
FOR HIS CIRCLE
MADE BY
CONSISTS
THE VC OF 4-5 DIVISIONS WORKS WITH 200CRORES EACH NEARLY 800CRORES BUDGET/YE
INSPECTS THE WORKS
HAS TO INSPECT
COSTINGTHE
MORE
WORKS
THAN COSTING
50LAKHS MORE
IN VIEW
THAN
OF THE
10LAKHS
WIDE RANGE OF VICINITY ABOUT 3 TO 5 THOUSAND KMS
CAN ACCEPT TENDERS
SE HAS NO
UP POWERS
THT LIMT TO
OF ACCEPT
ACCORDING
TENDERS
TECHNINAL
SINCE SANCTION
THERE IS A TENDER COMMITTEE WHICH IS HEADED BY THE VC

HIGHEST AGREEMENT
EXECUTIVE
CONCLUDING
ENGINEERAUTHORITY
IS CONCLUDING
FOR TENDERS
AGREEMENTS
ACCEPTED
SINCEBY
THERE
HIM AND
IS NO
HIGHER
POST OF
AUTHORITIES
SE UPTO 2015 AND THE POWERS ARE

HEAD OF THE ADMINISTRATIVE


REGISTRAR IS HEAD
UNITOF
IN THE DEPARTMENT
ADMINISTRATIVE
BY FOR
WHICH
ENTIRE
HE CONTROLS
UNIVERSITY,
THENO
ENGINEERING
SUCH POWERS
STAFF
AREWORKING
GIVEN, DOESN'T
UNDER HAVE
HIM PO
APPOINTING AUTHORITY
V.C/REGISTRAR
FOR WORK-CHARGED
IS APPOINTING AUTHORITY
ESTA FOR SKILLD
FOR ANY
CLASS
POST
III IN
AND
UNIVERSIYTY
ABOVE

RESPONSIBLE TO
MAKE
INSPECT
RESPONSIBLE
IMPORTANT
TO INSPECT
WORKS IN
ALL
HISIMPORTANT
CIRCLE THAT
WORKS
THE SYSTEMS
IN UNIVERSITY
OF MANAGEMENT
WITHOUT ANY
ARE
FINANCIAL
EFFICIENT
LIMITS
, ECONOMICAL, THA
RESPONSIBLE TO
NOWATCH
RESPONSIBILITY,
AND CONTROL
MAKETHE
SE RATES
RESPONSIBLE
PAID FOR THE WORKS

THE SE AND AUDIT


NO AUDIT
OFFICER
OFFICER
SHOULD
IS WORKING
ASSIST EACH
UNDER
OTHER
SE. IN
THE
RENDERING
DAO(W) IS MANAGEMENT
WORKING UNDER
OF DEPARTMENTAL
CONTROL OF THE
ACCOUNTS
EXECUTIVE
ASENGINEERS
PERFECTLYA

CAN PASS EXCESS


NO SUCH
EXPENDITURE
POWERS OVER
GIVEN,ORIGINAL
ADVISABLE
TECHNIAL
TO GIVESANCTION
POWERS TO
UP PASS
TO 10%
EXCESS EXPENDITURE OVER ORIGINAL TECHNICAL SAN
CAN UNDERTAKE
NOFULL
SUCH
CONTRIBUTION
POWES, SE HAS
WORKS
TO FACILITATE
UP TO RS TO
1-00l
TAKE UP THE WORKS OF EMERGENT NATURE OF WORKS
CAN AWARD WORK
NO SUCH
ON NOMINATION
POWERS, ADVISED
UPT RS1-00L
TO GIVE PERMISSION TO AWARD WORK ON NOMINATION UPTO RS.0-50L
RESPONISIBLE NO
FORSUCH
INSPECTION
SYSTEMOF
IS DIVISIONS
THERE
ANNUALLY
THE SE HAS TONO
ARRANGE
SUCH ARRANGEMENT
FOR DUSTRIBUTION OF GRANTS ALLOTTED TO THE CIRCLE DIVISION WISE

RESPONISBLE TO
EXECUTIVE
SUBMIT PROGRESS
ENIGINEER-1
REPORTS
IS SUBITTING
TO WATHC
THE EXPENDITURE
THE EXPENDITURE
AGAINST
AGAINS
THE THE
GRANTS
GRANT
ALLOTTED
ALLOTTED
ONON
MONTHLY
A MONTHLY
BASIS
BASIS
WITH TH
HAS TO MAINTAIN
DIVISION
REGISTER
OFFICE
OF ESTIMATES
IS MAINTAINING
SANCTIONED
THE REGISTERS WHICH HAS TO BE MAINTAINED AS PER THE FINANCIAL POWERS
HAS TO MAINTAIN
DIVISION
REGISTER
OFFICE
OF AGREEMENTS
IS MAINTAINING
CONCLUDED
THE REGISTERS WHICH HAS TO BE MAINTAINED AS PER THE FINANCIAL POWERS

HAS TO CHECKMEASURE
HAS TO CHECK
THE WORKS
MEASURE
COSTING
THE WORKS
RS50LCOSTING
AND ABOVE
RS ATLEAST
10L AND ABOVE
30%OFATLEASE
THE VALUE
30%
OFOF
WORK
THE VALUE OF THE WORK
EXECUTIVE ENGINEER
ADMINISTRATIVE
NOAPPRPROVAL
POWERS
UP TO CERTAIN LEVEL
TECHNICAL SANCTION
NO POWERS
FOR PLAN WORKS UPTO RS.10L
INSPECTION OFINSPECTION
WORKS COSTING
EVERYRS.5
WORK
TO 5O LAKHS
CAN ACCEPT THE
NOTENDERS
POWERS UPTO RS.10L

CAN CONCLUDECONCLUDING
THE AGREEMENT
AGREEMENTS
UPTO RS10L
TO ANY EXTENT IS TO BE WITHDRAWN AND TO BE PERMITTED TO CONCLUDE TO AN EXTENT

You might also like