You are on page 1of 18

Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount

ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
3000 Earth work excavation for foundations and depositing the same on bank Earth work excavation Earth work excavation for 308 & 310 1031.95 Ten cum 309585
with an initial lead of 10mtrs. And lift of 2 mtrs., in all kind of soils, stiff clay, for foundations foundations
black cotton soils, red earth, ordinary morrum and soft dis-integrated rock
mixed with 50% fair sized boulders in all conditions such as dry, wet,
slushy including shoring, shuttering and strutting etc., complete as directed
by the Site Engineer (excluding dewatering charges).
BUILDING FOUNDATIONS

350 Sump / Septic Tank etc. Sump / Septic Tank Sump / Septic Tank etc. 308 & 310 589.7 Ten cum 20639.5
etc.
2100 Providing pre construction anti termite treatment from stand firm approved Providing pre Providing pre SS 138.35 One Sqm 290535
by departmental officer as per manufacturers specifications and as construction anti construction anti termite
specified in IS 613 (part-II) 1981 by injecting emulsifiable concentration of termite treatment treatment
Heptachlor / Chlocodoem / chlas pysiphes mixed with water and creating a
chemical barrier on top of plinth filling junction of inside walls and floors on
top of damp proof course (DPC) as in masonary at the level of plinth all
complete under 10 years guarantee with all materials, labour and all
necessary operations tools etc., complete as directed above to get
executed by specified agency after obtaining the approval from
Department

390 Laying plain cement concrete (1:4:8) prop. using 40mm graded hard Laying plain cement Laying plain cement 401 & 402 2521 One cum 983190
granite machine crushed metal including cost of machine mixing, levelling, concrete (1:4:8) prop. concrete (1:4:8) prop.
tamping with iron rammer, curing etc., complete including cost and
conveyance of all materials, seignoirage and labour charges for
foundations and "under flooring".
300 Supplying and placing the ready (design) mix concrete:M20 grade from Supplying and placing Supplying and placing SS 4311.05 One cum 1293315
standard suppliers approved by the departmental officers including cost the ready (design) the ready (design) mix
and conveyance of all materials and labour charges, steel shuttering with mix concrete:M20 concrete:M20
acrow type and adjustable props, vibrating, with pin/plate vibrator, laying
levelling, lift charges boomer pumping charges of concrete but excluding
cost of steel and its fabrication charges etc. Complete for finished item of
work. FOOTINGS

30 Pedestals Pedestals Pedestals SS 4558.55 One cum 136756.5


110 Plinth beams Plinth beams Plinth beams SS 4546.1 One cum 500071

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
130 Roof Beams of any size, shape and height up to 14'-00" a) GROUND Roof Beams of any Roof Beams of any size, SS 5593.35 One cum 727135.5
FLOOR size,
130 (ii) First floor (ii) First floor (ii) First floor SS 5593.35 One cum 727135.5
260 Roof slab of any shape and height up to 14'-00" i) GROUND FLOOR Roof slab of any Roof slab of any shape SS 5480 One cum 1424800
shape and height and height
260 (ii) First floor (ii) First floor (ii) First floor SS 5480 One cum 1424800
11 (iii) Second floor (iii) Second floor (iii) Second floor SS 5480 One cum 60280
120 Vibrated reinforced cement concrete (1:1 1/2:3) prop. using 20mm to 6mm Vibrated reinforced Vibrated reinforced 402 & 403 5527.6 One cum 663312
gauge hard granite machine crushed metal, including cost and cement concrete (1:1 cement concrete (1:1
conveyance of cement and all other materials from source to site, cost of 1/2:3) prop 1/2:3) prop
form work (steel centering) and operational charges for machine mixing,
laying vibrating with pin/plate vibrator as directed by the Departmental
Officers, but excluding cost of steel and its fabrication charges, including
cost and conveyance of all materials to site, conveyance of water, all
incidental and operational and labour charges, seignorage charges, lead
and lift charges etc., complete for finished item of work. COLUMNS (I)
GROUND FLOOR

66 (ii) First floor (ii) First floor (ii) First floor 402 & 403 5575.4 One cum 367976.4
5 (iii) Second floor (iii) Second floor (iii) Second floor 402 & 403 5646.15 One cum 28230.75
25 Lintels and Bressumers (i) GROUND FLOOR Lintels and Lintels and Bressumers 402 & 403 5156.3 One cum 128907.5
Bressumers
25 (ii) First floor (ii) First floor (ii) First floor 402 & 403 5204.15 One cum 130103.75
2 (iii) Second floor (iii) Second floor (iii) Second floor 402 & 403 5274.85 One cum 10549.7
235 R.C.C. (1:1 1/2:3) Prop: wide for sunshade (Chajja) 75mm thick at the R.C.C. (1:1 1/2:3) R.C.C. (1:1 1/2:3) Prop: 402 & 403 674.55 One Sqm 158519.25
fixed end and 50mm thick at the free end average 62.50mm thick cast Prop: wide for wide for sunshade
monolithically with lintel / bressumers using 6mm to 12mm gauge machine sunshade (Chajja) (Chajja)
crushed graded hard granite metal chips and finishing the exposed faces
with 12mm thick plastering in CM (1:5) and (1:3) Prop: with dubara sponge
finishing and drip mould including seigniorage and conveyance of all
materials, labour charges, steel centering, machine mixing, vibrating curing
all leads and lifts etc., complete but excluding cost of steel and its
fabrication charges. (i) GROUND FLOOR.

235 (ii) First floor (ii) First floor (ii) First floor 402 & 403 688.25 One Sqm 161738.75

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
10 (iii) Second floor (iii) Second floor (iii) Second floor 402 & 403 701.95 One Sqm 7019.5

660 Construction of CRS Masonry 2nd sort in cement mortar (1:8) Prop: for Construction of CRS Construction of CRS 612 2202.3 One cum 1453518
foundation and basement using hard granite stones including cost and Masonry 2nd sort in Masonry 2nd sort in
conveyance of all materials to site and labour charges, curing and all other cement mortar cement mortar
incidental and operational charges , seignorage charges etc., complete for
finished work as per standard specification
90 Cutting hard rock / sheet rock by chiseling and stacking the stones to Cutting hard rock / Cutting hard rock / sheet SS 583.85 One cum 52546.5
Departmental gauge for pre-measurements, with cost and conveyance of sheet rock by rock by chiseling
all materials and all labour charges etc., complete for finished items of chiseling
work
150 Drilling of 25mm dia holes in sheet rock using a pneumatic compressor Drilling of 25mm dia Drilling of 25mm dia SS 98.3 One Rmt 14745
etc., complete with cost and conveyance of all labour and materials holes in sheet rock holes in sheet rock
charges etc., complete.
150 Grouting holes with cement slurry with cost and conveyance of all Grouting holes with Grouting holes with SS 72.8 One Rmt 10920
materials and labour charges etc., complete for finished item of work. cement slurry cement slurry
3350 Refilling foundation basement with excavated soil other than sand and Refilling foundation Refilling foundation 309 & 310 345.8 Ten cum 115843
black cotton soils in layers not exceeding 15CM compacted and thickness basement with basement with excavated
complying with standard specifications for filling foundation and basement excavated soil soil
including breaking clods, watering and tamping etc., complete.

4020 Filling basement with carted earth other than black cotton soils and other Filling basement with Filling basement with SS 226.2 One cum 909324
clay soils, for filling in basement including loading and unloading and filling carted earth other carted earth other than
in the basement in layers of 15CM each with watering and temping and all than black cotton black cotton
other incidental charges including 20% consolidation etc., complete as
directed at site with 2KM lead.
510 Construction of brick masonry in CM (1:8) Prop: using 2nd class/Ground Construction of brick Construction of brick 501 & 504 2412.2 One cum 1230222
moulded bricks including seignorage charges for super structure including masonry in CM (1:8) masonry in CM (1:8)
all leads and lifts, scaffolding charges, cost and conveyance of all Prop: Prop:
materials all incidental and operational charges, all labour charges, curing
etc., complete for finished item of work at all heights (the strength of brick
shall not be less than 35kg/cm2). (A) GROUND FLOOR

500 (b) First floor (b) First floor (b) First floor 501 & 504 2489.2 One cum 1244600

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
139 (c ) Second floor (c ) Second floor (c ) Second floor 501 & 504 2514.15 One cum 349466.85
27 Reinforced brick masonry partition walls 4 1/2" thick in cement mortar (1:6) Reinforced brick Reinforced brick masonry 501, 504 & 2728.45 One cum 73668.15
Prop: using 2nd class/ground moulded bricks reinforced with 2nos. Of masonry partition partition walls 4 1/2" thick 509
6mm dia M.S round bars placed horizontally in the centre of walls at every walls 4 1/2" thick in in
6th layer embedded into the end walls or columns with perfect lines, over
reinforced brick wall at every 3'-00" height including cost and
conveyance of all materials and labour charges using seignoirage,
scaffolding all leads and lifts all other incidental and operational charges
etc., complete but excluding cost of steel and its fabrication charges and
concrete etc., complete for finished item of work.. (i) GROND FLOOR.

20 (b) First floor (b) First floor (b) First floor 501, 504 & 2805.4 One cum 56108
509
1800 Supplying and fixing of rabbit wire mesh to walls at beam and columns to Supplying and fixing Supplying and fixing of SS 35.4 One Sqm 63720
avoid joint cracks to required length and size with nails and cement mortar of rabbit wire mesh to rabbit wire mesh to walls
etc., including cost and conveyance of all materials, labour charges, walls at beam at beam
scaffolding charges etc., complete.
1950 Cement plastering 12mm thick with base coat of 9mm thick in CM (1:5) Cement plastering Cement plastering 12mm 904 1441.25 Ten Sqm 281043.75
prop: and top coat of 3mm thick in CM (1:3) prop: with dubara sponge 12mm thick with base thick with base coat of
finishing including scaffolding charges, using cost and conveyance of all coat of 9mm thick in 9mm thick in CM (1:5)
materials, seignorage labour charges, all other incidental and operational CM (1:5) prop: prop:
charges etc., complete for finished item of work. (a) GROUND FLOOR.

1900 (b) First floor Cement plastering Cement plastering 12mm 904 1490.65 Ten Sqm 283223.5
12mm thick with base thick with base coat of
coat of 9mm thick in 9mm thick in CM (1:5)
CM (1:5) prop: prop:

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
1600 Plastering in cement mortar 20mm thick two coats with first coat of 16mm Plastering in cement Plastering in cement 904 1694.65 Ten Sqm 271144
thick in CM(1:6) prop: and top coat of 4mm thick in CM(1:4) Prop: with mortar 20mm thick mortar 20mm thick two
dubara sponge finishing including cost and conveyance of all materials, two coats coats
labour charges, scaffolding charges, curing, seignorage charges complete
for all internal &external walls.(a) Exterior faces (with an admixture of
water proofing compound material of CONPLAST water proofing
liquid @ 150ml/50kg of cement bag) or any other approved water
proofing compound material. (a) GROUND FLOOR

1600 (b) First floor (b) First floor (b) First floor 904 1745.65 Ten Sqm 279304
1250 (c ) Second floor (c ) Second floor (c ) Second floor 904 1793.8 Ten Sqm 224225
4000 Internal plastering (a) GROUND FLOOR Internal plastering Internal plastering 904 1675.4 Ten Sqm 670160
3600 (b) First floor (b) First floor (b) First floor 904 1726.35 Ten Sqm 621486
1600 (c ) Second floor (c ) Second floor (c ) Second floor 904 1775.25 Ten Sqm 284040
195 Providing high yeild strength Deformed steel bars (Fe 415 as per IS 1786- Providing high yeild Providing high yeild 126 & 402 52930 One MT 10321350
1979) / mild steel bars (Fe250 grade as per IS 432) of different diameters, strength Deformed strength Deformed steel
including labour charges for cutting, bending to require size and shape steel bars bars
placing in position with cover blocks of approved materials and size and
tying with binding wire of 20SWG, formating grills for reinforcement work
as per approved design and drawing, including all wastages such as
overlaps, couping, welde joints, chairs, spacers including cost and
conveyance of steel bars, binding wires, cover blcoks and all incidental
and operational labour charges such as cutting, binding placing in position,
tying etc., complete for finished item of work for all floors . Note: The
overlaps shall not be less than 50d. TOR STEEL: GROUND FLOOR ,
FIRST FLOOR, SECOND FLOOR.

1 MILD STEEL GROUND FLOOR, FIRST FLOOR, SECOND FLOOR. MILD STEEL MILD STEEL 126 & 402 51709 One MT 51709

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
200 Impervious coat over RCC roof with 20mm thick plaster in CM (1:4) prop: Impervious coat over Impervious coat over 903 & 912 1760.55 Ten Sqm 35211
mixed with an admixture of CONPLAST / or equivalent aprpoved brand RCC roof with 20mm RCC roof with 20mm
@150ml/ 1 bag of cement of water proofing compound liquids and laid thick plaster thick plaster
when the slab is green including fine rendering with neat cement and
thread lining at 1'-6" intervals including providing gultha at the junction of
slab and parapet with 9" wide wall cost and conveyance of all materials
and labour charges, curing etc., complete duly forming ridges, vallies and
slopes for proper draining of rain water etc., complete for finished item of
work. (a) GROUND FLOOR

2100 (b) First floor (b) First floor (b) First floor 903 & 912 1780.35 Ten Sqm 373873.5
6 Supplying and fixing 1st class teak wood ornamental main door fully Supplying and fixing Supplying and fixing 1st SS 7244 One Sqm 43464
panelled double shutter using 3"x 6" frame 7"x 2" styles, lock and top rails 1st class teak wood class teak wood
of 6''x2'' and bottom rail of 10"x 2" rail and intermediate rails of 21/2"x 2" , ornamental main door ornamental main door
11/4" thick B.T.wood planks1st class &alround covering with 3/4"x1/2"
ornamental best teak wood beading (as per enclosed drawing) and fixing
the following fixtures: (1) 8 nos of MS hold fast 9"x2"x1 1/2" (2) 4 nos. of
150mm long brass butt hinges to each shutter. (3) 1 no. 350mm long
brass aldrop heavy duty fancy type(4) 1no. Of 300mm long brass
latch of heavy fancy type duty (5) 3 nos. of 200mm long brass tower
bolt of heavy duty(6) 2 nos. of 300mm long brass grip handles to
each shutter (fancy handles) 7) 1 No. of door stopper (Brass heavy
duty) to each shutter, including cost & conveyance of all materials &
labour charges erc., complete for finished item of work.

74 Supplying & fixing best teak wood door with 2 1/2'' x 4'' size frame with Supplying & fixing Supplying & fixing best SS 3099.6 One Sqm 227820.6
champherred edges 38mm thick flush type solid core both side teak best teak wood door teak wood door with 2
veneer ply wood (single shutter / double shutter) and teak wood external with 2 1/2'' x 4'' size 1/2'' x 4'' size frame
lipping 12 months alround, 6nos. MS holdfasts of size 9'' x 2'' x 1/6'', 4 frame
No. 5'' long MS powder coated butt hinges of ISI mark heavy duty and
20mm wide teak wood ornamental stepped beading on front side as per
approved design and drawing including cost & conveyance of all materials
labour charges complete for finished item of work. (Raavela/Kutty/Anand
wood Crafts) (a) SINGLE SHUTTER

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
81 b) Double shutter b) Double shutter b) Double shutter SS 3323.25 One Sqm 269183.25

43 Supplying & fixing best teak wood door with 2 1/2'' x 4'' size frame with Supplying & fixing Supplying & fixing best SS 2907.15 One Sqm 125007.45
champherred edges 38mm thick flush type solid core one side teak veneer best teak wood door teak wood door with 2
ply wood and other side water proof sheet and teak wood external lipping with 2 1/2'' x 4'' size 1/2'' x 4'' size frame
12 monthsalround, 6nos. MS holdfasts of size 9'' x 2'' x 1/6'', 4 No. 5'' long frame
MS powder coated butt hinges of ISI mark heavy duty and 20mm wide
teak wood ornamental stepped beading on front side as per approved
design and drawing including cost & conveyance of all materials labour
charges complete for finished item of work. (Anand wood
Crafts/Raavela/Kutty)

70 Plain Cement Concrete for bed blocks in (1:2:4) proportion using 20mm to Plain Cement Plain Cement Concrete 402 & 618 3877.25 One cum 271407.5
6mm guage hard graded granite (machine crushed), including machine Concrete for bed for bed blocks in (1:2:4)
mixing, laying, centring charges, curing, cost & conveyance of all blocks in (1:2:4) proportion
materials, seigniorage charges, all labour charges etc., complete for proportion
finished item of work.(For D.P.C, 4 1/2'' & 9'' wall). (a) GROUND FLOOR

60 b) First Floor b) First Floor b) First Floor 402 & 618 3925.1 One cum 235506
4 a) Second Floor a) Second Floor a) Second Floor 402 & 618 3995.8 One cum 15983.2
660 Providing 16mm thick cement plastering in CM (1:6) prop.including Providing 16mm thick Providing 16mm thick 904 & S S 1011.75 Ten Sqm 66775.5
scaffolding charges, curing, cost and conveyance of all materials, cement plastering in cement plastering in CM
seigniorage charges, labour charges, and all other incidental and CM (1:6) (1:6)
operational charges etc., complete for finished item of work for base coat
under glazed tiles. (a) GROUND FLOOR
400 b) First Floor b) First Floor b) First Floor 904 & SS 1021.35 Ten Sqm 40854

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
376 Providing & fixing of windows made of pre-painted steel (Base steel as Providing & fixing of Providing & fixing of SS 3941.6 One Sqm 1482041.6
per IS 513 of 0.6mm thick galvanised as per IS 277 with zink of 150 GSM), windows made of windows made of pre-
primer coated with epoxy primer of 5-7 microns thick, finish painted with a pre-painted steel painted steel
polyester paint of 12-16 microns thick and back coated with 5-7 microns
thick alkyd backer. Section for outer frame should be of 48x50mm, center
mullion should be of 48x50mm, section for shutters should be of 47x20mm
and 5mm thick tinted glass fixed glass beading section should of
12x12mm. Outer frame & mullions to have rebate for glazed shutters and
a 20mm provision for guard bars/grills. The sections are to be cut to length
meter jointed with corner brackets. Centre mullion is to be fixed with
mullion cap. Seccolor handle, 8'' stay made of aluminium, 2 nos. of heavy
duty stainless steel pivot hinges shall be provided per shutter. The
windows should be panelled with 5mm thick plain float glass. Rubber
Gaskets are provided all round the glass. The above frames should
be fixed to the concrete / masonary wall by means of self expanding
screws, including 12mm MS PC square guard bars @ 4'' c/c and all
shutters openable & central mullion.

12 Providing & fixing top hung and fixed louvered ventilators made of pre- Providing & fixing top Providing & fixing top SS 3015 One Sqm 36180
painted steel (Base steel as per IS 513 of 0.6mm thick 'D' quality, hung and fixed hung and fixed louvered
galvanised as per IS 277 with zink of 120 GSM), primer coated with epoxy louvered ventilators ventilators made of pre-
primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 made of pre-painted painted steel
microns thick and back coated with 5-7 microns thick alkyd backer. Section steel
for outer frame should be of 46x52mm, section for shutter should be of
46x46mm, section for mullion should be of 46x70mm, and section for
beading should be 18x25mm and section for louvered ventilation should
be of 33x57mm box section. 5mm thick pin headed glass panes for
ventilators with Ethy propylene Diamine monomer Gasket (EPDM). The
sections are to be cut to length and jointed with corner brackets. Centre
mullion is to be fixed with mullion cap. Handle made of high grade
aluminium powder coated and nylon receiver.Gaskets made of Ethyl
propylene Diamine monomer Gasket (EPDM) Corner brackets made of
CRCA with Zinc Phasphating. The above frames should be fixed to
the concrete / masonary wall by means of self expanding screws,
including 12mm MS PC square guard bars @ 4'' c/c and all shutters
openable & central mullion. (Fixed Louvers)

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
1800 Supplying & laying 25.4mm thick machine cut with slice cutting & highly Supplying & laying Supplying & laying 903 & 912 4054.9 Ten Sqm 729882
polished shahabad stone slabs (Tandur Blue Variety) of size 45 cm x 45 25.4mm thick 25.4mm thick machine
cm or any other approved size with uniform colour fixed over a bed of machine cut with slice cut with slice
20mm thick laid in CM (1:8) proportion & neat cement slurry of honey like
consistency @ 3.3 Kg /Sqm, pointed to full depth with neat cement
including cutting to required size & shape on all sides & laid to proper
slopes etc., seigniorage charges, wastage, cost & conveyance of all
materials, lead &lift charges, labour charges etc., complete for finished
item of work FLOORING: (a) GROUND FLOOR

1700 b) First Floor b) First Floor b) First Floor 903 & 912 4074.7 Ten Sqm 692699
105 Window Sills, Stair case Treads & Risers Etc., (a) GROUND FLOOR Window Sills, Stair Window Sills, Stair case 903 & 912 446.5 One Sqm 46882.5
case Treads Treads
70 b) First Floor b) First Floor b) First Floor 903 & 912 448.5 One Sqm 31395

1100 5'' Height Skirting (a) GROUND FLOOR 5'' Height Skirting 5'' Height Skirting 903 & 912 57.85 One Rmt 63635
1100 b) First Floor b) First Floor b) First Floor 903 & 912 57.85 One Rmt 63635
1100 2'' Wide Patty (Black shabad stone 2" wide patty) (a) GROUND 2'' Wide Patty 2'' Wide Patty 903 & 912 29.6 One Rmt 32560
FLOOR
1100 b) First Floor b) First Floor b) First Floor 903 & 912 29.6 One Rmt 32560
1350 Oil bound distemper to all internal faces of walls and ceilings in two coats Oil bound distemper Oil bound distemper to all 911 620.1 Ten Sqm 83713.5
of approved make/ shade (Asian/Berger/Garwere/ Johnson & to all internal faces of internal faces of walls
Nicholson/Nerolac) over a primer coat, including cost & conveyance of all walls
materials & labour charges, scaffolding, all incidental & operational
charges etc., complete (Total 3 coats)
8000 Supplying & finishing Altek or equivalent brand to interior faces of new Supplying & finishing Supplying & finishing SS 72.8 One Sqm 582400
walls of approved colour as per manufacturers specification including cost Altek or equivalent Altek or equivalent brand
and conveyance of all materials to site and labour charges for preparing brand to interior to interior
the wall, applying primer coat etc., complete for finished item of work.(only
walls)
450 Application of French polish to wood work in 3 or more coats to get the Application of French Application of French SS 2013.75 Ten Sqm 90618.75
glossy surface, including cost of all materials , labour charges, etc; polish to wood work polish to wood work
cmplete finished item of work.

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
320 Supplying & fixing 110mm dia PVC rain water spouts of Nandi / Sudhakar Supplying & fixing Supplying & fixing SS 226 One Rmt 72320
(ISI) to with stand 4Kg/ cm2 pressure including PVC shoes, offsets and 110mm dia PVC rain 110mm dia PVC rain
bends, brackets to be fixed after cutting holes in RCC Chajja/ roof if water spouts of water spouts of
necessary and finishing with CM (1:3) prop. including cost of all materials ,
labour charges, Bombay nails etc., complete for finished item of work.

30 Supplying and fixing of stair case railings using 20mm MS Sqare bars Supplying and fixing Supplying and fixing of SS 1687.15 One Sqm 50614.5
vertical & brasing 20 x 6mm MS flats bent into circle or semicirclar shape of stair case railings stair case railings using
as per approved drawing & 30 x 6mm MS flat welded on top for fixing BT using 20mm 20mm
Wood ornamental hand rail of 3'' x 4'' and welding the vertical bars to main
reinforcement of waist slab, with one coat of red oxide paint including cost
and conveyance of all materials and labour charges lead & lift charges etc;
complete for finished item of work.

434 Groove pointing to C.R. Masonary for basement in CM (1:4) prop. after Groove pointing to Groove pointing to C.R. 906 1099.2 Ten Sqm 47705.28
raking the joints of masonary to 20mm depth including cost & conveyance C.R. Masonary for Masonary for basement
of all materials, seigniorage charges and labour charges etc., complete for basement in CM (1:4) in CM (1:4)
finished item of work
72 Providing expansion joint treatment over the terrace using RCC slabs (1:1 Providing expansion Providing expansion joint SS 1007.15 One Sqm 72514.8
1/2:3) prop., brick walls, Mastic pad, 12mm thick plastering in CM (1:5) & joint treatment treatment
(1:3) prop.but excluding the cost of steel and its fabrication charges,
including cost of scaffolding, seigniorage, all leads, lifts, operational
charges etc., complete as per drawing.
70 Laying RCC 2 1/2'' thick slabs (1:2:4) prop. Using 20mm to 6mm grade Laying RCC 2 1/2'' Laying RCC 2 1/2'' thick SS 384.2 One Sqm 26894
HBG metal, steel form work, mixing, laying, vibrating, curing, including cost thick slabs (1:2:4) slabs (1:2:4) prop.
& conveyance of all materials, seigniorage charges and labour charges prop.
etc., complete but excluding the cost of steel & its fabrication charges. for
Lab platforms, sinks etc.,
60 Supplying & fixing 50.4mm dia OD MS medium weight pipes for purlins Supplying & fixing Supplying & fixing SS 308.4 One Rmt 18504
under AC sheet roofing, including pipe ends closing with MS plate, 50.4mm dia OD MS 50.4mm dia OD MS
including cost & conveyance of all materials, seigniorage charges and medium weight pipes medium weight pipes
labour charges, MS hold fasts, CC bed blocks etc., complete.

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
70 Providing and fixing 6mm thick corrugated AC sheet roofing Providing and fixing Providing and fixing 6mm SS 2748.7 Ten Sqm 19240.9
charminor/Ramco brand fixed with polymer coated J or L hooks, bolts, 6mm thick corrugated thick corrugated AC
nuts, bitumon washers, to 50.4mm dia 'B' class MS pipes embeded in AC sheet sheet
brick masonary, including cost of materials, necessary hardware, labour
charges etc., complete.
70 Supplying & fixing powder coated anodised Aluminium ISI marked fixtures Supplying & fixing Supplying & fixing SS 198.65 Each 13905.5
including cost of materials, necessary hardware, labour charges etc., powder coated powder coated anodised
complete. (Jyothi / Crown) (a) 300MM long 16mm anodised Aluminium Aluminium ISI
dia rod Aldrop ISI
10 b) 250mm long 16mm dia rod Aldrop b) 250mm long 16mm b) 250mm long 16mm dia SS 183.05 Each 1830.5
dia rod Aldrop rod Aldrop
30 c) 200mm long 16mm dia rod Aldrop c) 200mm long 16mm c) 200mm long 16mm dia SS 153.95 Each 4618.5
dia rod Aldrop rod Aldrop
125 d) 250mm long tower bolt d) 250mm long tower d) 250mm long tower bolt SS 79.05 Each 9881.25
bolt
125 e) 150mm long tower bolt e) 150mm long tower e) 150mm long tower bolt SS 53.05 Each 6631.25
bolt
200 f) 150mm grip 'D' type handles f) 150mm grip 'D' type f) 150mm grip 'D' type SS 65.55 Each 13110
handles handles
110 g) 150mm long MS powder coated door stopper g) 150mm long MS g) 150mm long MS SS 26 Each 2860
150 Supplying & fixing 110mm wide heavy guage Aluminium sheet to Supplying & fixing Supplying & fixing SS 338 One Sqm 50700
expansion joint with necessary drilling holes in RCC / Brick work, nails, 110mm wide heavy 110mm wide heavy
including cost of materials, necessary hardware, labour charges etc., guage Aluminium guage Aluminium
complete.
40 Supplying & fixing 450mm dia NP2 class RCC hume pipe plain ended Supplying & fixing Supplying & fixing SS 697.35 One Rmt 27894
pipes conforming to BIS 458/1988 including cost of materials, labour 450mm dia NP2 class 450mm dia NP2 class
charges etc., complete. RCC RCC
520 Providing ornamental stepped Cornice to parapet wall top & roof level as Providing ornamental Providing ornamental SS 240.6 One Rmt 125112
directed by the Dept. & drawing using brick & nominal reinforcement & stepped Cornice to stepped Cornice to
finishing the same in CM 1:6 & 1:4 prop. In two coats with dubara sponge parapet wal parapet wal
finishing including cost of materials, labour charges, scaffolding charges
etc., complete. but excluding cost of steel and its fabrication charges.

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
340 Supplying & fixing vitrified polished floor tiles of first quality of approved Supplying & fixing Supplying & fixing SS 1201.3 One Sqm 408442
make of size 600 x 600 of 8mm thick set over a bed of CM (1:8) prop. vitrified polished floor vitrified polished floor
including neat cement slurry of honey like consistancy spread at the rate of tiles tiles
3.3 Kg per Sqm. and 3mm wide spacers joints filled with Laticrete chemicl
paste including cost and conveyance of all materials, labour charges etc.,
complete for finished item of work. including wall skirting, border tiles etc.,
complete. (a) GROUND FLOOR AND FIRST FLOOR

100 S/F Mastic pad 25.4mm thick mastic pad of approved make for expansion S/F Mastic pad S/F Mastic pad 25.4mm SS 911.3 One Sqm 91130
joints including cutting & placing in position, cost & convayance of material 25.4mm thick mastic thick mastic pad
and all labour & incidental charges complete for finished item of work. pad

4600 Application of ACE paint to all exterior faces of walls in two coats with Application of ACE Application of ACE paint S S & 911 949.1 Ten Sqm 436586
approved shade & colour over a base coat of water base primer ( total 3 paint to all exterior to all exterior faces of
coats) including cost and conveyance of all materials, labour charges etc., faces of walls walls
complete for finished item of work.
162 Supplying & fixing 20mm thick polished Granite slab (any colour) of Supplying & fixing Supplying & fixing 20mm 903 & 912 2299.15 One Sqm 372462.3
approved quality and shade laid over base coat of 20mm thick CM (1:8) 20mm thick polished thick polished Granite
prop: over CC bed / R.C.C. already laid including neat cement slurry of Granite slab slab
honey like consistancy spread at the rate of 3.3 Kg per Sqm. including cost
of seigniorage charges on all materials, labour charges etc., complete for
finished item of work.

40 Supplying and laying 1 1/2 thick (finished thickness) shelves racks in Supplying and laying Supplying and laying 1 903 & 912 482.15 One Sqm 19286
(1:2:4) prop. Using 12 to 6mm chips steel form work including 1/2" thick 1 1/2 thick (finished 1/2 thick (finished
plastering in c.m (1:5) and (1:3) prop. Both side using nominal thickness) thickness)
reinforcement but excluding cost of steel and its fabrication charges etc.,
complete for finished item of work.
18 WATER SUPPLY AND SANITARYFITTINGS:-Supplying and fixing Supplying and fixing Supplying and fixing 1326 1515 Each 27270
584.2mm long Orissa pan of Parry ware / Nycer /Hindware make with 'P' or 584.2mm long Orissa 584.2mm long Orissa
'S' trap of ISI mark including cost & conveyance of all materials, labour pan of Parry ware / pan of Parry ware / Nycer
charges etc., complete for finished item of work. Nycer

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
8 Supplying and fixing European type Parryware/ Nycer / Hindware WC best Supplying and fixing Supplying and fixing 1326 1284 Each 10272
Indian make white glazed with 'P' trap , and best Indian make seat cover & European type 584.2mm long Orissa
buffers as per IS 2548 - 1963make with 'P' or 'S' trap of ISI mark including Parryware/ Nycer pan of Parry ware / Nycer
cost & conveyance all all materials, labour charges etc., complete for
finished item of work.
24 Construction of brick masonary seat for Urinals / WC etc., in CM (1:6) Construction of brick Construction of brick 1326 165 Each 3960
prop. With plastering including cost & conveyance of all materials, labour masonary seat for masonary seat for
charges etc., complete for finished item of work. Urinals / WC etc., Urinals / WC etc.,
100 Chasing brick masonary walls and repairing the same etc., complete. Chasing brick Chasing brick masonary 1326 19 One Rmt 1900
masonary walls and walls and repairing
repairing
24 Supply & fixing of PVC LL cistern Parryware, Slim line with integral Supply & fixing of Supply & fixing of PVC 1326 820 Each 19680
components & short bend including cost & conveyance of all materials, PVC LL cistern LL cistern Parryware,
labour charges etc., complete for finished item of work. Parryware, Slim line Slim line
55 Supplying and Fixing 76.2mm (3")dia CI Nahany trap(Culcutta / Nagpur Supplying and Fixing Supplying and Fixing 1326 221 Each 12155
make) with NP cover including cost & conveyance of all materials, labour 76.2mm (3")dia CI 76.2mm (3")dia CI
charges etc., complete for finished item of work. Nahany Nahany trap(Culcutta /
trap(Culcutta / Nagpur Nagpur make)
make)
24 Supply, fixing white glazed porcelain half stall (large) urinal with heavy Supply, fixing white Supply, fixing white 1326 2118 Each 50832
brackets, 1 1/4'' CP waste coupling/ dome waste, 1/2'' dia CP spreader, CP glazed porcelain half glazed porcelain half stall
connection pipe, including cost & conveyance of all materials, labour stall
charges etc., complete for finished item of work.(Hindware/ Parry ware /
Nycer)
45 Providing & Laying cinder concrete (1:4:8) prop. Using 12.5mm size cinder Providing & Laying Providing & Laying cinder S S & 1326 1985.05 One Cum 89327.25
mixed, consolidation with iron rammers, including cost & conveyance of cinder concrete concrete (1:4:8) prop.
all materials, labour charges etc., complete for finished item of work. (1:4:8) prop.

30 Supplying & placing of FRC 10T capacity Manhole covers including cost & Supplying & placing Supplying & placing of S S & 1326 1010.05 Each 30301.5
conveyance of all materials, labour charges etc., complete for finished of FRC 10T capacity FRC 10T capacity
item of work. Manhole covers Manhole covers

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
50 Supplying & fixing PVC/ rigid connections with brass unions, CP coated Supplying & fixing Supplying & fixing PVC/ 1326 67 Each 3350
nut including cost & conveyance of all materials, labour charges etc., PVC/ rigid rigid connections with
complete for finished item of work. (a) 1/2" DIA PIPE connections with brass unions,
brass unions,
60 b) 11/4'' dia pipe b) 11/4'' dia pipe b) 11/4'' dia pipe 1326 20 Each 1200
45 c) 11/4'' dia PVC rigid pipe c) 11/4'' dia PVC rigid c) 11/4'' dia PVC rigid 1326 37.5 One Rmt 1687.5
pipe pipe
10 Supplying , laying, jointing,testing & commissioning GI pipes of ISI mark of Supplying , laying, Supplying , laying, 1326 131 One Rmt 1310
medium weight including all fittings, cost of pipe, thread, oil & labour jointing,testing & jointing,testing &
charges etc., complete except cost of unions. (a) 1/2" DIA PIPE commissioning GI commissioning GI

170 b) 3/4'' dia pipe b) 3/4'' dia pipe b) 3/4'' dia pipe 1326 146 One Rmt 24820
200 c) 1'' dia pipe c) 1'' dia pipe c) 1'' dia pipe 1326 191 One Rmt 38200
200 d) 11/2'' dia pipe d) 11/2'' dia pipe d) 11/2'' dia pipe 1326 241 One Rmt 48200
100 e) 2'' dia pipe e) 2'' dia pipe e) 2'' dia pipe 1326 309 One Rmt 30900
25 f)2 1/2'' dia pipe f)2 1/2'' dia pipe f)2 1/2'' dia pipe 1326 460 One Rmt 11500
5 Supplying & fixing best quality unions of 1st quality including cost & Supplying & fixing Supplying & fixing best 1326 26 Each 130
conveyance of all materials, labour charges etc., complete for finished best quality unions of quality unions of 1st
item of work. (a) 1/2" DIA 1st quality quality
10 b) 3/4'' dia b) 3/4'' dia b) 3/4'' dia 1326 32 Each 320
30 c) 1'' dia c) 1'' dia c) 1'' dia 1326 48 Each 1440
10 d) 11/2'' dia d) 11/2'' dia d) 11/2'' dia 1326 72 Each 720
10 e) 2'' dia e) 2'' dia e) 2'' dia 1326 88 Each 880
8 f)2 1/2'' dia f)2 1/2'' dia f)2 1/2'' dia 1326 98 Each 784
2 Supplying, fixing & testing of Gun Metal Peet Valves of ISI mark, Indian Supplying, fixing & Supplying, fixing & 1326 327 Each 654
make heavy type of 1st quality including cost & conveyance of all testing of Gun Metal testing of Gun Metal Peet
materials, labour charges etc., complete for finished item of work. (a) 3/4" Peet Valves Valves
DIA
16 b) 1'' dia b) 1'' dia b) 1'' dia 1326 482 Each 7712
10 c) 1-1/2'' dia c) 1-1/2'' dia c) 1-1/2'' dia 1326 983 Each 9830
4 d)2-1/2'' dia d)2-1/2'' dia d)2-1/2'' dia 1326 2706 Each 10824
200 Supplying, fixing CI Pipes / fittings of ISI mark (Culcatta/ Nagpur make) Supplying, fixing CI Supplying, fixing CI Pipes 1326 375 One Rmt 75000
including cost & conveyance of all materials, labour charges etc., Pipes / fittings of ISI / fittings of ISI mark
complete for finished item of work. (i) 3" DIA CI PIPE mark

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
20 ii) 3'' dia CI Plain bend ii) 3'' dia CI Plain ii) 3'' dia CI Plain bend 1326 130 Each 2600
bend
30 iii) 3'' dia CI Plug bend with plug iii) 3'' dia CI Plug iii) 3'' dia CI Plug bend 1326 175 Each 5250
bend with plug with plug
10 iv) 3'' dia single junction with plug iv) 3'' dia single iv) 3'' dia single junction 1326 235 Each 2350
junction with plug with plug
6 v) 3'' dia double junction with plug v) 3'' dia double v) 3'' dia double junction 1326 385 Each 2310
junction with plug with plug
8 vi) 3'' x 6'' offset vi) 3'' x 6'' offset vi) 3'' x 6'' offset 1326 228 Each 1824
8 vii) 3'' dia CI cowl vii) 3'' dia CI cowl vii) 3'' dia CI cowl 1326 157 Each 1256
200 viii) 4'' dia CI Pipe viii) 4'' dia CI Pipe viii) 4'' dia CI Pipe 1326 500 One Rmt 100000
15 ix) 4'' dia CI Plain bend ix) 4'' dia CI Plain ix) 4'' dia CI Plain bend 1326 178 Each 2670
bend
25 x) 4'' dia CI Plug bend with plug x) 4'' dia CI Plug bend x) 4'' dia CI Plug bend 1326 218 Each 5450
with plug with plug
10 xi) 4'' dia single junction with plug xi) 4'' dia single xi) 4'' dia single junction 1326 340 Each 3400
junction with plug with plug
8 xii) 4'' dia double junction with plug xii) 4'' dia double xii) 4'' dia double junction 1326 420 Each 3360
junction with plug with plug
10 xiii) 4'' x 6'' offset xiii) 4'' x 6'' offset xiii) 4'' x 6'' offset 1326 276 Each 2760
8 xiv) 4'' dia CI cowl xiv) 4'' dia CI cowl xiv) 4'' dia CI cowl 1326 178 Each 1424
6 xv) 4'' dia floor trap 1st quality xv) 4'' dia floor trap xv) 4'' dia floor trap 1st 1326 303 Each 1818
1st quality quality
26 Supplying & fixing CP Jaquar fittings of best quality.(Continental series) Supplying & fixing CP Supplying & fixing CP 1326 644 Each 16744
(a)LONG BODY BIB TAP Jaqua Jaqua
40 b) Angle cock b) Angle cock b) Angle cock 1326 631 Each 25240
25 c) Swan neck pillar tap c) Swan neck pillar c) Swan neck pillar tap 1326 800 Each 20000
tap
20 Supplying & fixing 4'' x 24'' white glazed porcelain channel fixed in brick Supplying & fixing 4'' Supplying & fixing 4'' x 1326 705 One Rmt 14100
masonary and pointed with white cement, 4'' x 24'' lenth CI grating, x 24'' white glazed 24'' white glazed
including cost and conveyance of materials, labour charges, etc., complete
for finished item of work

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
16 Supplying & fixing oval shape wash hand basin white (520 x 410mm) Supplying & fixing Supplying & fixing oval 1326 1571 Each 25136
Parryware or equivalent with CI / MS heavy type brackets, including cost oval shape wash shape wash hand basin
and conveyance of materials, labour charges, etc., complete for finished hand basin
item of work
12 Supplying & fixing 18mm thick black granite in CM (1:8) for urinal Supplying & fixing Supplying & fixing 18mm 1326 2290.8 One Sqm 27489.6
partitions / WB platforms including cost and conveyance of materials, 18mm thick black thick black granite in CM
labour charges, etc., complete for finished item of work granite in CM
(a) FOR URINAL PARTITIONS.
20 Making oval shape holes in granite for fixing Wash basin including flat Making oval shape Making oval shape holes 1326 570 Each 11400
nosing & rounding as directed by departmental staff. holes in granite for in granite for fixing
fixing
100 Supplying & fixing CP flange including cost and conveyance of materials, Supplying & fixing CP Supplying & fixing CP 1326 11 Each 1100
labour charges, etc., complete for finished item of work flange flange
30 Construction of 914.4mm dia brick masonary inspection chamber in CM Construction of Construction of 914.4mm 1326 4411 Each 132330
1:6 prop. Upto 1524mm depth including plastering with CM (1:3) 1/2'' thick 914.4mm dia brick dia brick masonary
both inside & out side including RCC cover 22'' dia with nominal steel masonary
reinforcement 3'' thick and hooks for lifting.
15 Supplying and fixing 152.4/101.6mm SWG gully trap of ISI mark Supplying and fixing Supplying and fixing 1326 321 Each 4815
conforming to IS 651 &4127 with CI grating & construction of brick 152.4/101.6mm 152.4/101.6mm
masonary in CM 1:6 prop.intermediate chambers and fitted with 304.8 x
288.6mm CI frame and hinged cover.
60 Supplying, laying, jointing & testing SWG pipes of ISI make conforming to Supplying, laying, Supplying, laying, jointing 1326 183 One Rmt 10980
IS 651 & 4127 with air tight cement joints in CM (1.5 : 1) prop. Including jointing & testing & testing SWG pipes
excavation of trenches and socket pits in any type of soil (except rock SWG pipes
requiring blasting) upto 1524mm depth and refilling, watering and tamping
etc., complete for finished item of work. (a)4" DIA SWG PIPE

200 b) 6'' dia SWG pipe b) 6'' dia SWG pipe b) 6'' dia SWG pipe 1326 254 One Rmt 50800
150 c) 8'' dia SWG pipe c) 8'' dia SWG pipe c) 8'' dia SWG pipe 1326 334 One Rmt 50100
12 Supplying & fixing 5.5mm thick Modiguard long size mirrors with Supplying & fixing Supplying & fixing 5.5mm 1326 2038.45 One Sqm 23646.02
ornamentalteak wood beading (2'' x 11/4'') alround and 6mm thick plywood 5.5mm thick thick Modiguard
back with necessary nails etc., complete including cost and conveyance of Modiguard
materials, labour charges, etc., complete for finished item of work.

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
142 Supplying & fixing coloured design antiskid ceramic tiles flooring with Supplying & fixing Supplying & fixing 1326 5193.45 Ten Sqm 73746.99
approved colour/ shade and size on 20mm thick bed in CM 1:8 prop. and coloured design coloured design antiskid
to full depth with 2mm wide Laticrete chemical paste including cost and antiskid ceramic tiles ceramic tiles
conveyance of materials, labour charges, etc., complete for finished item
of work. (J&J ISI make)
860 Supplying & fixing coloured design glazed tiles of (ISO make) approved Supplying & fixing Supplying & fixing 1326 5256.8 Ten Sqm 452084.8
make, size & shade set over plastered surface with 6mm thick pure coloured design coloured design glazed
cement and filling joints with coloured cement in full depth, including cost glazed
and conveyance of materials, labour charges, etc., complete for finished
item of work. (J&J ISI make)
300 Supplying & fixing 3'' height / wide coloured design border tiles to walls at Supplying & fixing 3'' Supplying & fixing 3'' 1326 107.5 One Rmt 32250
suitable place of approved make, shade over plastered surface including height / wide coloured height / wide coloured
cost and conveyance of materials, labour charges, etc., complete for design border design border
finished item of work.
20000 Providing and placing on terrace at all floor levels Polyetheylene Water Providing and placing Providing and placing on S S & 1326 7.3 One Lit 146000
Storage Tank with double layer of Approved brand and manufacture with on terrace at all floor terrace at all floor levels
cover and suitable Locking arrangement and making necessary holes for levels
inlet and outlets and over flow pipes but with out fittings and base support
for tanks.
4 Supplying & fixing 558.8 x 406.4mm Indian make WB (Hindware / Supplying & fixing Supplying & fixing 558.8 1326 808 Each 3232
Parryware / Parry ware) with 12.7mm NP 400grams piller tap with plug, 558.8 x 406.4mm x 406.4mm
chain complete with CI brackets including wooden block etc., complete.

50 Making half round to the granite slabs including cost and conveyance of Making half round to Making half round to the 1326 101.95 One Rmt 5097.5
materials, labour charges, etc., complete for finished item of work. the granite slabs granite slabs
100 Making holes in brick / RCC / CRS walls and repairing the same etc., Making holes in Making holes in brick / 1326 25 Each 2500
complete. (a) IN BRICK WORK. brick / RCC / CRS RCC / CRS walls
walls
40 b) In CRS masonary b) In CRS masonary b) In CRS masonary 1326 38 Each 1520
25 c) In RCC c) In RCC c) In RCC 1326 38 Each 950
10 Construction of brick masonary chamber over Gully trap / Peet valve & Construction of brick Construction of brick 1326 305 Each 3050
fitted with RCC cover including cost and conveyance of materials, labour masonary masonary
charges, etc., complete for finished item of work.

CONTRACTOR EXECUTIVE ENGINEER (C)


Estim Item Detailed Work Type Item Short APSS / Rate (INR) UOM Amount
ate Specification Description eg. Earth Work, Description Morth Cl. ( Upto 2 ( upto (INR)
Quanti Electrical works.. ( upto 100 Number Decimals ) 50 ( Upto 2
ty etc Characters) ( upto 200 Charact Decimals )
(only ( upto 200 Characters ers)
Figure Characters) )
s)
120 Construction of brickmasonary support for GI pipe line with CM 1:8 OF Construction of Construction of 1326 49 Each 5880
SIZE 304.8 X 223.8 X 223.8mm including plastering, cost and conveyance brickmasonary brickmasonary support
of materials, labour charges, etc., complete for finished item of work. support for GI pipe for GI pipe

45 Supplying & fixing 1 1/4'' dia CP waste coupling of 1st quality including Supplying & fixing 1 Supplying & fixing 1 1/4'' 1326 136 Each 6120
cost and conveyance of materials, labour charges, etc., complete for 1/4'' dia CP dia CP
finished item of work. (Jenance Continental)

CONTRACTOR EXECUTIVE ENGINEER (C)

You might also like