Professional Documents
Culture Documents
Checking of Load On Pile 100111
Checking of Load On Pile 100111
7.04
1.5
5
1.1
SEISMIC
D5
m2
m
m
266
P MAX
X DIR
4.50
26.40 T
22.81 T
320 T
Base Shear V =
64
T
X DIR
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
P
V
El + 0.3M
m
m4
64 T
12.80 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
within 10 % overloading
Hence O.K.
5
1200
500
2200
1200
2200
P MAX
4.5 T
18.15 T
13.068 T
301.72 T
211.2 Tm
1.44 Pm^2
1.44 Pm^2
2.4 Pm
2.4 Pm
148.34 T < 180T x 1.25 = 225 T
Hence O.K.
-27.66 T < 36 T PULL OUT
Hence O.K.
X DIR
64 T
12.80 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
within 10 % overloading allowable lateral load = 13.75 T
Hence O.K.
1200
1200
500
2200
1200
3200
L/C DL+LL+SL+X FOR D5
(as obtained from ESP- LOAD DATA )
Vertical Load P=
266 T
Base Shear V=
64 T
SEISMIC
P MAX
4.50 T
26.40 T
19.01 T
315.91 T
211.2 Tm
2.16 Pm^2
5.76 Pm^2
3.6 Pm
4.8 Pm
96.65 T < 185T x 1.25 = 231.25 T
Hence O.K.
8.65 T
Hence O.K.
D5
X DIR
64 T
10.67 T < 10T x 1.25 = 12.5T
Hence O.K.
PG-5 P(185)
CHECKING LOAD ON PILES
Area of pile cap A =
Thickness of pile cap t =
Number of piles n =
Distance from centre to edge of pile cap L =
7.04
1.5
5
1.1
SEISMIC
D5
m2
m
m
250
P MIN
X DIR
4.50
26.40 T
19.01 T
300 T
Base Shear V =
64
T
X DIR
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
P
V
El + 0.3M
m
m4
64 T
12.80 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
within 10 % overloading
Hence O.K.
5
1200
500
2200
1200
2200
P MIN
4.5 T
18.15 T
13.068 T
1.44 Pm^2
1.44 Pm^2
2.4 Pm
2.4 Pm
145.14 T < 180T x 1.25 = 225 T
Hence O.K.
X DIR
64 T
12.80 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
within 10 % overloading allowable lateral load = 13.75 T
Hence O.K.
1200
1200
500
2200
1200
3200
L/C DL+LL+SL+X FOR D5
(as obtained from ESP- LOAD DATA )
Vertical Load P=
250 T
Base Shear V=
64 T
SEISMIC
P MIN
4.50 T
26.40 T
19.01 T
299.91 T
211.2 Tm
2.16 Pm^2
5.76 Pm^2
3.6 Pm
4.8 Pm
D5
X DIR
PG-3 P(185)
CHECKING LOAD ON PILES
SEISMIC
C5,E5
340
P MAX
X DIR
4.500 T
18.797 T
13.534 T
376.831 T
Base Shear V =
34
T
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
X DIR
P
V
El + 0.3M
m
m4
34 T
11.33 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
Hence O.K.
PG-3 P(400)
GR- 5
Z
1000
3
1650
923
X
577
1077
850
500
1500
2500
L/C DL+LL+SL+X FOR C5, E5 =
(as obtained from ESP- LOAD DATA )
Vertical Load P=
340 T
Base Shear V=
34 T
SEISMIC C5,E5
340
P MAX
5.1025 m2
4.500 T
18.797 T
13.777 T
1.518 Pm^2
1.125 Pm^2
1.644 Pm
1.500 Pm
Yx =
Yz =
0.923
0.75
X DIR
Hence O.K.
CHECK AGAINST LATERAL LOAD
Lateral load
Lateral load per pile
34 T
11.33 T < 10T x 1.25 = 12.5T
Hence O.K.
PG-3 P(185)
CHECKING LOAD ON PILES
SEISMIC
C5,E5
176 T
P MIN
X DIR
4.500 T
18.797 T
13.534 T
212.831 T
Base Shear V =
34
T
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
X DIR
P
V
El + 0.3M
m
m4
34 T
11.33 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
Hence O.K.
PG-3 P(400)
Pile Capacity = 185 T
Pile Size = 400 X 400
No of Piles in the Group =
Z
1000
3
1650
923
X
577
1077
850
500
1500
2500
L/C DL+LL+SL+X FOR C5, E5 =
(as obtained from ESP- LOAD DATA )
Vertical Load P=
176 T
Base Shear V=
34 T
SEISMIC C5,E5
176
P MIN
X DIR
5.0125 m2
4.500 T
18.797 T
13.777 T
71.02
74.80
1.518 Pm^2
1.125 Pm^2
1.644 Pm
1.500 Pm
Yx =
Yz =
0.923
0.75
Hence O.K.
CHECK AGAINST LATERAL LOAD
Lateral load
Lateral load per pile
34 T
11.33 T < 10T x 1.25 = 12.5T
Hence O.K.
PG-3 P(185)
CHECKING LOAD ON PILES
SEISMIC
C5,E5
340
P MAX
X DIR
4.500 T
18.797 T
13.534 T
376.831 T
Base Shear V =
34
T
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
X DIR
P
V
El + 0.3M
m
m4
34 T
11.33 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
Hence O.K.
PG-3 P(400)
Pile Capacity = 185 T
Pile Size = 400 X 400
No of Piles in the Group =
Z
1000
3
1650
923
X
577
1077
850
500
1500
2500
L/C DL+LL+SL+X FOR C5, E5 =
(as obtained from ESP- LOAD DATA )
Vertical Load P=
266 T
Base Shear V=
39 T
SEISMIC B5,C5,E5
266
P MAX
5.1025 m2
4.500 T
18.797 T
13.777 T
1.518 Pm^2
1.125 Pm^2
1.644 Pm
1.500 Pm
Yx =
Yz =
0.923
0.75
Z DIR
Hence O.K.
CHECK AGAINST LATERAL LOAD
Lateral load
39 T
Lateral load per pile
13.00 T > 10T x 1.25 = 12.5T
within 10 % overloading 12.5 X1.10 = 13.75 T
Hence O.K.
PG-3 P(185)
CHECKING LOAD ON PILES
SEISMIC
C5,E5
340
P MAX
X DIR
4.500 T
18.797 T
13.534 T
376.831 T
Base Shear V =
34
T
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
X DIR
P
V
El + 0.3M
m
m4
34 T
11.33 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
Hence O.K.
PG-3 P(400)
Pile Capacity = 185 T
Pile Size = 400 X 400
No of Piles in the Group =
Z
1000
3
1650
923
X
577
1077
850
500
1500
2500
L/C DL+LL+SL+X FOR C5, E5 =
(as obtained from ESP- LOAD DATA )
Vertical Load P=
250 T
Base Shear V=
39 T
SEISMIC B5,C5,E5
266
P MIN
5.1025 m2
4.500 T
18.797 T
13.777 T
1.518 Pm^2
1.125 Pm^2
1.644 Pm
1.500 Pm
Yx =
Yz =
0.923
0.75
Z DIR
Hence O.K.
CHECK AGAINST LATERAL LOAD
Lateral load
39 T
Lateral load per pile
13.00 T > 10T x 1.25 = 12.5T
within 10 % overloading = 12.5 X1.10 = 13.75 T
Hence O.K.
PG-3 P(185)
CHECKING LOAD ON PILES
SEISMIC
D4,D6
125
P MAX
X DIR
4.500 T
18.797 T
13.534 T
161.831 T
Base Shear V =
34
T
Moment M=
0
T-m
(Highest value taken considering Seismic Load Wind Loads)
X DIR
P
V
El + 0.3M
m
m4
34 T
11.33 T < 10T x 1.25 = 12.5T
T < 12.5 X 1.1 = 13.75 T
Hence O.K.
PG-3 P(185)
Pile Capacity = 185 T
Pile Size = 400 X 400
No of Piles in the Group =
Z
1000
3
1650
923
X
577
1077
850
500
1500
2500
L/C DL+LL+SL+X FOR D4,D6 =
(as obtained from ESP- LOAD DATA )
Vertical Load P=
125 T
Base Shear V=
34 T
125
SEISMIC
P MAX
5.1025 m2
4.500 T
18.797 T
13.777 T
1.518 Pm^2
1.125 Pm^2
1.644 Pm
1.500 Pm
Yx =
Yz =
0.923
0.75
D4,D6
X DIR
Hence O.K.
CHECK AGAINST LATERAL LOAD
Lateral load
Lateral load per pile
34 T
11.33 T < 10T x 1.25 = 12.5T
Hence O.K.
P
M
950
PILE
250
1700
1300
867
1300
X
X
1500
433
908
950
475
Z
1500
2450
**********************************************************************************************************
**********************************************************************************************************
HZ
MX
-4.11
0
PILE GROUP
PG3
-5.88
FOR DL + LL+WL/EL
266.71
18.09
-11.03
7.617 T
17.025 T
10.832 T
295.665 T
14.2 MT
4.42 MT
1.127 Pm^2
Yx =
1.125 Pm^2
Yz =
1.300 Pm
1.500 Pm
0.867
0.75
4.11 T
1.37 T < 10T
132.695 T
14.2 MT
4.42 MT
1.127 Pm^2
Yx =
1.125 Pm^2
Yz =
1.300 Pm
1.500 Pm
0.867
0.75
Hence O.K.
4.11 T
1.37 T <10T
***********************************************************************************************************
FOR DL+LL+WL/EL
FOR MAX P
Total Vertical Load = 266.71+7.617+17.025+12.107 =
TOTAL Moment Mx = 0 +5.78 X (1.95+1.5) =
TOTAL Moment MZ = 0 + 11.03 X (1.95+1.5) =
Ixx=P X 0.867X0.867 + 2XP X 0.433X 0.433 =
Izz = 2 X (P X 0.75X0.75 ) =
Zxx = 1.127/ 0.867
Zzz = 1.125/ 0.75
302.185 T
19.94 TM
38.05 TM
1.127 Pm^2
Yx =
1.125 Pm^2
Yz =
1.300 Pm
1.500 Pm
0.867
0.75
Hence O.K.
Hence O.K.
Maximum load on pile = P/n + Mz/Zzz =
Minimum load on pile = P/n - Mz/Zzz =
11.03 T
3.68 T < 12.5T
Hence O.K.
FOR DL+LL+WL/EL
FOR MIN P
Total Vertical Load = 18.09+7.617+17.025+12.107 =
TOTAL Moment Mx = 0 +5.78 X (1.95+1.5) =
TOTAL Moment MZ = 0 + 11.03 X (1.95+1.5) =
Ixx=P X 0.867X0.867 + 2XP X 0.433X 0.433 =
Izz = 2 X (P X 0.75X0.75 ) =
Zxx = 1.127/ 0.867
Zzz = 1.125/ 0.75
Maximum load on pile = P/n + Mx/Zxx =
53.565 T
19.94 TM
38.05 TM
1.127 Pm^2
Yx =
1.125 Pm^2
Yz =
1.300 Pm
1.500 Pm
0.867
0.75
11.03 T
3.68 T < 12.5T
MZ
0
CG1
E3 E4 E5 E6 E7
F3 F4 F5 F6 F7
PILE GROUP
PG1
FOR DL + WL/EL
1568.72 -186.35
10
FOR DL+WL/EL
COMP
225 T
LATERAL LOAD 12.5T
PULL OUT 45T
1700
X
2000
-3900
Area of pile cap A =
Thickness of Pile Cap Assumed = 1.5 m
Height of Soil Backfill = 1.7 m
Pedestal Size = 2.1 m X 2.1 m
34.7
21.499 T
173.500 T
92.687 T
FOR DL+LL
m2
FOR MAX P
1464.506 T
102.879 Tm
18.182
60.84 Pm^2
13.50 Pm^2
15.60 Pm
9.00 Pm
Yx =
Yz =
155.07 T<180T
29.82 T
2.98 T <10T
FOR DL+LL
FOR MIN P
493.306 T
102.879 Tm
18.182
60.84 Pm^2
13.50 Pm^2
15.60 Pm
9.00 Pm
Yx =
Yz =
29.82 T
2.98 T <10T
FOR DL+LL+WL/EL
FOR MAX P
1856.406 T
330.476 Tm
263.339
60.84 Pm^2
13.50 Pm^2
15.60 Pm
9.00 Pm
Yx =
Yz =
FOR DL+LL+WL/EL
95.76 T
9.58 T <12.5T
FOR MIN P
101.336 T
330.476 Tm
263.339
60.84 Pm^2
13.50 Pm^2
Yx =
Yz =
15.60 Pm
9.00 Pm
95.76 T
9.58 T <12.5T
HZ
-29.82
76.33
95.79
MX
P
V
MZ
0
250
3.9
1.5
Hence O.K.
Hence O.K.
T
Hence O.K.
3.9
1.5
Hence O.K.
Hence O.K.
T
Hence O.K.
3.9
1.5
Hence O.K.
Hence O.K.
Hence O.K.
Hence O.K.
T
Hence O.K.
3.9
1.5
Hence O.K.
T < 45 T PULL OUT
Hence O.K.
Hence O.K.
T < 45 T PULL OUT
Hence O.K.
T
Hence O.K.