Decomposition

Technique


Define major elements how the project will be managed
(phases of life cycle as the top level)
Decompose upper level WBS into lower level detailed
components
Deciding if the adequate cost and duration can be
estimated at this level of detail for each element
Identify tangible deliverable results for performance
measurement
Check the correctness of the decomposition.