Professional Documents
Culture Documents
Using the following scale, to what degree did each team member contribute to the project?
1
2
3
No
Contribution
Member Names
1. Yourself
2.
3.
4.
6
7
Without this member
there would be no project
Ranking
If you were grading this person on a four point scale where 4 is an A, 3 a B, 2 a C and 1 a D,
what grade would you give each team member? Explain all Cs and Ds
Member Names
1. Yourself
2.
3.
4.
5.
Grade
Fill in the names of team members, starting with yourself. For each item you have 100 points to
distribute across all team members. If all team members performed equally on an item each
team member would receive 25 points (if there are 4 team members 33.3 if 3 team members).
Team #
Attendance at
Team Meetings
Participation in
Interface
Design
Participation in
Paper
Prototype
Creation
Participation in
Paper
Prototype
Testing
Participation in
Documentation
Part 1
Participation in
Documentation
Part 2
Participation in
Documentation
Part 3
Myself
Member 1
Member 2
Member 3
Total
100
100
100
100
100
100
100