MKL Zoo

MKL Zoo, has a various collection of animals ranging from mild to wild, reptiles
from all over the world. MKL Zoo would like to promote and improve their popularity
and financial situation. As a software engineering consultant you are required to
solve the problem.

TO Do: (Complete this assignment by 30 Nov)

a) Prepare a problem statement and state the significance.


b) Sketch a mind map and illustrate for the proposed zoo system showing
the existing scenario and your proposed solution.
Draw a fishbone diagram and identify the Schedules, Milestones, and
documents on the diagram.
d) List the functional and non-functional requirements.
e) Which process model is suitable, and explain briefly and justify why?
c)

f)
g)
h)
i)
j)

Develop a Use case diagram (UCD)


Develop a Sequence diagram
Develop the different architectures (any three)
Construct a data flow diagram.
Sketch a GUI, and explain briefly the functionality of each component
you have considered in you GUI design with reference to the UCD
developed.
k) Write a code to develop a GUI,
l) Suggest a testing method for the project and explain how do you test it?
m) How do you verify and validate the Software package of MKL Zoo?
Optional: Create a DB of MKL Zoo, and connect your GUI to the MKL DB