No Routine Flaring
Length
Breadth
Depth
330 m
61 m
33.5 m
POB 240
Entity in charge
Location
FPSO Topsides
Consortium - NETCO/IESL/DELTAAFRIK
(led by NETCO)
Lagos, Nigeria
Worley Parsons
Melbourne, Australia
Lagos, Nigeria
PACE
All locations
Hull
SHI
Geoje, Korea
Topsides
JV SHIN/LADOL - 6 modules
SHI other modules
Lagos, Nigeria
Geoje, Korea
Hull
SHI
Geoje, Korea
JV SHIN/LADOL
AVEON
NESTOIL / PONTICELLI(TBC)
Lagos, Nigeria
Port-Harcourt, Nigeria
SHI/Ladol
SHI
Lagos, Nigeria
Geoje, Korea
Pressure Vessels
DORMANLONG
AVEON
NESTOIL / PONTICELLI(TBC)
Lagos, Nigeria
Port-Harcourt, Nigeria
JV SHIN/LADOL (6 Modules)
SHI
Lagos, Nigeria
Geoje, Korea
DETAILED ENGINEERING
FABRICATION
INTEGRATION
FPSO Topsides Integration
SHIN (Nigeria)
SHI (Korea)
Management
HSE / Quality
SHIN
Hull
Engineering
Procurement
Management
Interfaces
NETCO (Leader)
DeltaAfrik
IESL
- Topsides Engineering
Consortium
Procurement
Support
PACE
- Nigerian Human
Capacity Development
(NHCD)
Hull Fabrication
AVEON
Topside
Fabrication &
Integration
Construction
- Pressure Vessels
PACE
Dorman Long
Construction
- Pressure Vessels
PWO
Others (TBC)
- Living Quarters
Engineering
Ponticelli
Nestoil
Offshore Works
Other Sub
Contracts (TBC)
- Hull & Modules
Transportation
(12 modules)
Pre-Comm. &
Commissioning
Transportation /
Tow
PACE
-Pre-Comm &
Commissioning
WP Melbourne
Feed Verification & Studies
Project Management
Total Man-hours: 317,520hrs,
NC Man-hours: 287,100hrs,
NC%: 90%
Office Locations
Man-Hours
287,100
Engineering
Total Man-hours: 1,300,727hrs,
Office Locations
NC Man-hours: 1,065,320hrs
ManHours
Main Subcontractors
Consortium of
NETCO/DeltaAfrik/
IESL led by NETCO
Popham Walter Odusote
(PWO)
NETCO/DeltaAfrik Offices,
Lagos
969,200
Lagos
96,120
Total
1,065,320
NC%: 82%
Scope
Commissioning Engineering/MIE
Total Man-hours: 281,732hrs,
Office Locations
Lagos
NC Man-hours: 130,776hrs,
Man-Hours
130,776
NC%: 46%
Main Subcontractors
Scope
PaCe
Procurement
FPSO Procurement Centre in Lagos for Management of all procurement activities.
Issuance of Procurement Procedures, Work Flow Schemes, RFQs & POs.
Company & SHI Procurement teams already mobilized in Lagos at NETCO/DeltaAfrik
offices.
Global Interface with Detailed Engineering teams, Vendors Representatives & SHI
Procurement Support Centres.
Sacrificial anodes
Valves
Protective paints
Measurement
Unit
Quantity
Tonnage
1,225
Length
801,301
Number
2810
Liters
870,514
Key Vendors
8
Items to be Fabricated
Modules
(P1, P4, P8, S1, S2, S8)
FABRICATION IN
NIGERIA
INTEGRATION IN NIGERIA
Total
Tonnage
NC Tonnage
NC %
NC
Tonnage
NC %
Main
Subcontractors
Yard Locations
28,143
6,265
22.2%
6,094
22%
JV SHI/LADOL
Lagos
Lagos
Port Harcourt
Lagos
Hull Appurtenances
supports/protectors,
vertical
caissons/protectors, riser
porch, etc)
7,258
7,258
100%
5,895
81%
JV SHI/LADOL
AVEON/NESTOIL
Dorman Long
Flare Tower
830
830
100%
0%
JV SHI/LADOL
Lagos
2,575
1,030
40%
44
2%
JV SHI/LADOL
Lagos
33 Pressure Vessels
529
529
100%
171
32%
AVEON
Dorman Long
Port Harcourt
Lagos
Total
39,335
15,912
40%
12,204
31%
(Risers/I-tube
Living Quarters
(Accommodation levels)
Portside view
Red colour : Fabricated and integrated in NIGERIA
Flare
Module
P4
Module
P8
Crane
Pedestral
Module
P1
Crane Pedestals
Helideck
&
Radar Mast
LQ blocks
Riser Porch
Secondary
Muster
Station
Laydown
Area
Crew berthing
structure
Mooring
Protector
Caisson
Protector
Vertical
Caissons
Mooring
Protector
Starboard view
FLARE
Flare
Crane Pedestals
Helideck
&
Radar Mast
LQ blocks
Modules
S1 & S2
Pancake
S8
Riser Porch
Laydown
Area
Chemical &
Paint Store
Mooring
Protector
Mooring
Protector
Capacity Building
11
(P1,P4,P8,S1,S2,S8)
JV SHIN/LADOL
- Hull appurtenance
(Fabrication yard)
-Topside modules
JV SHIN/LADOL
- Dredging works
Training Center @ JV
SHIN/LADOL
(SaNTA)
12
Quay wall
- Length 410m
- Berth Draft CD.(-)9.50m
1
2
Dredging
- Volume 1,200,000m3
- Dredging Level CD.(-)9.50m
13Discipline
Type of Training
Trainees Man-hours
21,120 man-hours
Engineering
25,344 man-hours
Procurement
16,896 man-hours
Construction Onshore
38,720 man-hours
Construction Offshore
& Hook up
24,640 man-hours
Pre-com. &
Commissioning
24,640 man-hours
Project Management
Total Man-hours
Electric Connection
Grinding
151,360
Welding
THANK YOU