3. MCI3 Location
4. MCI4 Planner Group
5. MCI5 Damage Analysis
6. MCI6 Object Statistics
7. MCI8 Cost Analysis
8. MCIS UserDefined Analysis
All of these PMIS reports have different analysis criterion which can
be used in decision making for business processes.
In case you need any different analysis tool other than MCI1 MCI7
reports, you may configure a new Info Structure, which can be used
for analysis through MCIS User Defined analysis report
These user defined Info Structure can be copied from standard Info
Structure or by adding the key figures required in analysis for
example In cost analysis Planned Cost, Actual Cost, Number of
Orders & Notifications created with material costs and labor cost are
taken as Key Figures which can be defined while creating Info
Structure
Info Structure requires frequent updating of data, which can be
defined through update rules defined through Info Structure in
Tcode MC26,this can be below units
Day
Week
Month
Posting Period
Comparing PMIS data with Order data Currency Conversion and Cost
Differences
The data will be same in case reports being executed in Statistical Currency,
if your statistical currency is USD than the data will be same in MCIS and
IW38 or in technical words PMIS and PMCO will give same data related to
costs for example Estimated Costs, Plan / Actual Cost, Material & Labor
costs etc.
In case the Object Currency for PM Orders is different from USD, for
example if Object Currency is EUR and we need to analyze the report in
EUR as currency then there may be differences in Costs data in PMIS and
PMCO Tables.
Examples:
Order Costs are shown as below screenshot:
There is a difference in EUR cost which should be 40.49 EUR but Order
shows 34.72 EUR.
The reason for this difference is that Order cost get updated at the time of
goods issue, this cost is fetched from the inventory or the Price / Unit in
material master.
Material Master has USD Price = 44.73 USD and EUR Price = 34.72 EUR
Approx. below screenshot for reference
Above image shows that cost figures are same as PMCO & IW33 Order
Fields
MCI8Report
ActualCost
1090.59
StorageMaterialCost
40.59
The reason for difference is explained earlier, as Material Master has EUR
Cost / Unit as 34.72 EUR but Currency conversion as per USD price in
Material Master gives 40.59 EUR 44.73 * 0.90744
Plant Maintenance Order gets the Material Cost in cost tab from Material
Master depending on analysis currency selected i.e.
Object Currency
Controlling Area Currency
AlertModerator
2Comments
HemantRathod
October11,2016at1:55pm
Goodblog.PleaseaddotherPMISreportlikeMCJB,MCJC,MCIZ
ShubhamGupta Postauthor
October12,2016at4:16am
ThanksHemant..
AddComment