Earth work excation in HG soils for pipe line trench of size 0.50 * 0.75 m
Work
oved
@ 12%
3%
ze 0.50 * 0.75 m
63mm
6kg/cm2
81.00
9.72
0.29
91.01
DATA SHEET
Name of
Work :
Index
S.I No code
1
2
Description of Work
3
Pipe Data Approved
Add Excise Duty @ 12%
Add Cess@ 3%
63mm
6kg /cm2
81.00
9.72
Earth work excation in HG soils for pipe line trench of size 0.50 * 0.75 m
leying and jointing of 63mm dia PVC 6Kgs/cm2 pipe with necessary specials
includind the refilling the trench with executive soils from Sugar Factory to
Kasturiba school
0.375 cum Earth work in HG soil
116.48 1 cum
0.375 cum Add 12% extra for pipe line
116.48 1 cum
1.0 Rmt Laying and jointing charges
6.58
1 cum
Rate as per cum
mi Reddy Project
Mandal
e 0.50 * 0.75 m
necessary specials
m Sugar Factory to
43.73
52.47
6.58