Activity ID

500/200KV Substation at Dasht-E-Alwan


500/220/20KV -DASHT-E-ALWAN SUBSTATION
MILESTONES
Customer Milestones
KEC Milestones
PRILIMINARY ACTIVITIES
Demining
Soil Testing
DESIGN & ENGINEERING
Electrical Engineering
Civil Engineering
PROCUREMENT
Foundation Bult Supply
Tower & Equipment Structure-Supply
Conductor Supply
Insulator Supply
Stringing Clamp Connector & Hardware-Supply
500KV Circuit Breakers-Supply
220KV Circuit Breakers-Supply
500KV Disconnector Switch Supply
220KV Disconnector Switch Supply
500KV CT Supply
220KV CT Supply
500KV CVT Supply
220KV CVT Supply
500KV LA Supply
220KV LA Supply
1-ph 500/220/20kV 133/133/40MVA Autotransformer-Supply
20kV 3-ph Earthing Transformer-Supply
20kV 1-ph Current Limiting Reactor-Supply
20kV 1-ph Earthing Resistor-Supply
20/0.4kV 630kVA Auxiliary transformer-Supply
1-ph 500kV 26.7MVAr shunt reactor-Supply
3-ph high voltage neutral reactor-Supply
500KV & 220KV Control & Protection Panels & Tariff Meters-Supply
RTU & SCADA System-Supply
Telecommunication Panels & Accessories-Supply
20KV Switchgear Supply
AC/DC DB Supply
220V & 48V Battery & Battery Charger Supply
UPS -Supply
MV Cables Supply
LV Power & Control Cable Supply
Earthing Material-Supply
Cable Rack / Tray supply
Fire Detection/Alarm & Protection System-Supply
Illumination Materials & Receptacles Supply
Airconditioning System- Supply
CCTV & Servillance System-Supply
Mandatory Tools Supply
CONSTRUCTION
CIVIL CONSTRUCTION
Subcontractor Selection
Boundary wall Construction
Control Room Building Construction
Transformer Foundations & Fire Wall Construction

Reactor Foundations & FireWall Construction


500KV Switchyard Foundations Construction
Other Utility Building Construction
Water Tank & Plumbing System - Construction
Bay Control Kiosk Construction
ELECTRICAL CONSTRUCTION
Subcontractor Selection
Earthing
Panel Erection
Cable Laying and Termination
Battery & Charger Erection
Aux Transformer Erection
Equipment Erection
Testing
Readiness of Incoming Line
Commissioning
PROJECT CLOSING

Activity Name
Substation at Dasht-E-Alwan
0KV -DASHT-E-ALWAN SUBSTATION

er Milestones

ARY ACTIVITIES

& ENGINEERING
al Engineering

ion Bult Supply


Equipment Structure-Supply
tor Supply

g Clamp Connector & Hardware-Supply


Circuit Breakers-Supply
Circuit Breakers-Supply
Disconnector Switch Supply
Disconnector Switch Supply
CT Supply
CT Supply
CVT Supply
CVT Supply
A Supply
A Supply
0/220/20kV 133/133/40MVA Autotransformer-Supply
ph Earthing Transformer-Supply
ph Current Limiting Reactor-Supply
ph Earthing Resistor-Supply
V 630kVA Auxiliary transformer-Supply
0kV 26.7MVAr shunt reactor-Supply
gh voltage neutral reactor-Supply
& 220KV Control & Protection Panels & Tariff Meters-Supply
CADA System-Supply
munication Panels & Accessories-Supply
witchgear Supply
DB Supply
48V Battery & Battery Charger Supply

es Supply
r & Control Cable Supply
g Material-Supply
ack / Tray supply
ection/Alarm & Protection System-Supply
tion Materials & Receptacles Supply
tioning System- Supply
Servillance System-Supply
ory Tools Supply

ONSTRUCTION
ntractor Selection
ary wall Construction
l Room Building Construction
ormer Foundations & Fire Wall Construction

r Foundations & FireWall Construction


Switchyard Foundations Construction
Utility Building Construction
Tank & Plumbing System - Construction
ontrol Kiosk Construction
CAL CONSTRUCTION
ntractor Selection

Laying and Termination


y & Charger Erection
ansformer Erection
ment Erection

ess of Incoming Line

Original Duration
1093
1093
1036
300
677
168
127
112
293
293
290
584
101
468
398
380
421
416
416
386
386
356
356
356
356
326
326
386
371
371
311
356
386
371
416
416
386
401
461
493
493
544
544
560
584
442
415
503
472
472
572
561
120
120
293
135

Start
10-Jan-16
10-Jan-16
10-Jan-16
10-Jan-16
2-Jan-17
21-Jul-16
22-Jul-16
22-Jul-16
1-Sep-16
1-Sep-16
1-Sep-16
22-Jul-16
24-Feb-17
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
22-Jul-16
24-Sep-16
24-Sep-16
24-Sep-16
11-Mar-17
12-Mar-17
3-May-17

Finish
6-Jan-19
6-Jan-19
10-Nov-18
4-Nov-16
10-Nov-18
4-Jan-17
25-Nov-16
10-Nov-16
20-Jun-17
20-Jun-17
17-Jun-17
25-Feb-18
4-Jun-17
1-Nov-17
23-Aug-17
5-Aug-17
15-Sep-17
10-Sep-17
10-Sep-17
11-Aug-17
11-Aug-17
12-Jul-17
12-Jul-17
12-Jul-17
12-Jul-17
12-Jun-17
12-Jun-17
11-Aug-17
27-Jul-17
27-Jul-17
28-May-17
12-Jul-17
11-Aug-17
27-Jul-17
10-Sep-17
10-Sep-17
11-Aug-17
26-Aug-17
25-Oct-17
26-Nov-17
26-Nov-17
16-Jan-18
16-Jan-18
1-Feb-18
25-Feb-18
6-Oct-17
9-Sep-17
6-Dec-17
5-Nov-17
5-Nov-17
1-Jan-19
17-Dec-18
8-Mar-17
9-Sep-17
9-May-18
22-Nov-17

10%
55%

30%
20

289
120
83
120
60
367
30
90
60
90
30
15
60
60
0
14
56

3-May-17
6-May-17
15-May-17
25-Sep-17
26-Mar-18
15-Jul-17
7-Oct-17
1-Jul-18
12-May-18
10-Jul-18
12-May-18
15-Jul-17
30-Jul-18
19-Aug-18
11-Nov-18
15-Dec-18
21-Oct-18

4-Jul-18
4-Nov-17
23-Sep-17
11-Mar-18
25-Jun-18
1-Jan-19
15-Nov-17
10-Nov-18
18-Aug-18
19-Nov-18
30-Jun-18
2-Aug-17
28-Oct-18
10-Nov-18
11-Nov-18
1-Jan-19
6-Jan-19

10%

5%