Exc 0.

75
PCC Width 0.05
Exc- GL to Bottom
Level 0.5
PCC Ht 0.1

Pile
No. OF
Sr. No Struture ID Piles Dia in M Length Concrete
37 P236A 4 1 30.00 94.26
38 P236B 4 1 15.00 47.13
39 P237A 5 1 15.00 58.91
40 P237B 4 1 17.50 54.99
41 P238A 4 1 14.00 43.99
42 P238B 4 1 25.00 78.55
67 P263A 4 1 16.00 50.27
68 P263B 5 1 28.00 109.97
69 P264A 5 1 29.00 113.90
70 P264B 4 1 16.00 50.27
71 P265A 4 1 14.00 43.99
72 P265B 4 1 23.00 72.27
73 P266A 5 1 15.00 58.91
74 P266B 4 1 14.00 43.99
164 P355A 4 1 25.00 78.55
165 P355B 4 1 25.00 78.55
166 P356A 4 1 25.00 78.55
167 P356B 4 1 25.00 78.55
177 P366A 4 1 32.00 100.54
178 P367A 4 1 32.00 100.54
183 P372A 4 1 26.00 81.69
184 P373A 4 1 28.00 87.98
185 P374A 4 1 33.00 103.69
186 P375A 4 1 26.00 81.69
187 P376A 4 1 26.00 81.69
188 P377A 4 1 26.00 81.69
189 P378A 4 1 26.00 81.69
192 P366B 4 1 32.00 100.54
193 P367B 4 1 32.00 100.54
198 P372B 4 1 26.00 81.69
199 P373B 4 1 28.00 87.98
200 P374B 4 1 33.00 103.69
201 P375B 4 1 26.00 81.69
202 P376B 4 1 26.00 81.69
203 P377B 4 1 26.00 81.69
204 P378B 4 1 26.00 81.69
205 P379A 4 1 26.00 81.69
206 P379B 4 1 26.00 81.69
Pile Cap Pier

L B H Concrete Height Dia Concrete


4.50 4.50 1.50 30.38 10.09 3.15 31.79
6.01 4.00 1.50 36.06 10.47 3.15 32.99
6.00 5.50 1.50 49.50 10.41 3.15 32.78
4.50 4.50 1.50 30.38 10.72 3.15 33.76
4.50 4.50 1.50 30.38 10.46 3.15 32.96
4.50 4.50 1.50 30.38 10.81 3.15 34.05
4.50 4.50 1.50 30.38 9.06 3.15 28.54
6.00 5.50 1.50 49.50 9.06 3.15 28.54
6.00 5.50 1.50 49.50 9.77 3.15 30.78
4.50 4.50 1.50 30.38 9.77 3.15 30.78
4.50 4.50 1.50 30.38 8.56 3.15 26.98
4.50 4.50 1.50 30.38 8.91 3.15 28.05
6.00 5.50 1.50 49.50 8.73 3.15 27.51
4.50 4.50 1.50 30.38 9.01 3.15 28.38
4.50 4.50 1.50 30.38 8.00 3.15 62.35
4.50 4.50 1.50 30.38 8.00 3.15 62.35
4.50 4.50 1.50 30.38 8.00 3.15 62.35
4.50 4.50 1.50 30.38 8.00 3.15 62.35
4.50 4.50 1.50 30.38 13.48 3.15 105.06
4.50 4.50 1.50 30.38 13.31 3.15 103.76
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.48 3.15 105.06
4.50 4.50 1.50 30.38 13.31 3.15 103.76
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
4.50 4.50 1.50 30.38 13.39 3.15 104.39
Pier Pier Cap S
Crash Pedestal
Barrier concrete Staging Reinforceshuttering Concrete Span
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 31.00
3.85 1.70 51.47
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 34.00
3.85 1.70 51.47
3.85 1.70 51.47 31.00
3.85 1.70 51.47
3.85 1.70 51.47 31.00
3.85 1.70 51.47
3.85 1.70 51.47 31.00
3.85 1.70 51.47 31.00
3.85 1.70 51.47 25.00
3.85 1.70 51.47 28.00
3.85 1.70 51.47 28.00
3.85 1.70 51.47 28.00
3.85 1.70 51.47 28.00
3.85 1.70 51.47 28.00
3.85 1.70 51.47 31.00
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 51.47
3.85 1.70 16.47 29.28
3.85 1.70 16.47 29.28
Segment Parapet Fixing
no of no of Qnty for Total
segment Qnty for 1 Total Qnty Parapet 1 Qnty
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
11.00 15.61 171.71 22.00 2.00 44.00
- 15.61 - - 2.00 -
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
12.00 15.61 187.32 24.00 2.00 48.00
- 15.61 - - 2.00 -
11.00 75.00 150.00 22.00 2.00 44.00
- 75.00 150.00 - 2.00 -
11.00 75.00 150.00 22.00 2.00 44.00
- 75.00 150.00 - 2.00 -
11.00 75.00 150.00 22.00 2.00 44.00
11.00 75.00 150.00 22.00 2.00 44.00
9.00 75.00 150.00 18.00 2.00 36.00
10.00 75.00 150.00 20.00 2.00 40.00
10.00 75.00 150.00 20.00 2.00 40.00
10.00 75.00 150.00 20.00 2.00 40.00
10.00 75.00 150.00 20.00 2.00 40.00
10.00 75.00 150.00 20.00 2.00 40.00
11.00 75.00 150.00 22.00 2.00 44.00
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
- 75.00 150.00 - 2.00 -
10.00 75.00 150.00 20.00 2.00 40.00
10.00 75.00 150.00 20.00 2.00 40.00
g
2.55
text level not approved 15.89 5.30
Pile Pile Cap Pier length Pier Cap I Girder for Span I Girder For Portal Deck Slab For Span Deck Slab for Portal
pile TOTAL Steel Con.
PIER ID no. of plies pile dia length LENGTH PCC qnt Length Width Height Pilecap Qnty Pier length pier width/Dia pier height pier qnty Piercap Qnty Steel Nos Length Con. Qty Qty. Nos Length Qty Steel Qty. Concrete Steel Concrete Steel
PP366A 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 14.32 72.51 16.5 6.50 7 31 184.45 32.90 4 11.497 40.4694 6.97 79.05 9.17 34.49 4
PP367A 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 14.23 72.03 16.5 6.50 7 31 184.45 32.90 4 11.505 40.4976 6.98 79.05 9.17 34.52 4
PP372A 5 1.00 30.00 150.00 2.54 6.00 5.50 1.50 49.50 2.25 2.25 13.83 70.02 16.5 6.50 2 14.505 24.6585 9.40 4 13.6 47.872 8.25 36.99 4.29 40.80 5
PP373A 5 1.20 18.00 90.00 3.97 7.20 ### 1.80 93.31 2.25 2.25 14.20 71.89 16.5 6.50 6 31 158.1 28.20 4 13.356 47.0131 8.10 79.05 9.17 40.07 5
PP374A 5 1.20 18.00 90.00 3.97 7.20 ### 1.80 93.31 2.25 2.25 13.69 69.28 16.5 6.50 6 17.6 89.76 28.20 4 13.375 47.08 8.11 44.88 5.20 40.13 5
PP375A 5 1.20 18.00 90.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 13.99 70.80 16.5 6.50 5 25.9 110.075 23.50 4 13.375 47.08 8.11 66.05 7.66 40.13 5
PP376A 5 1.20 24.00 120.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 13.99 70.80 16.5 6.50 5 15 63.75 23.50 4 13.375 47.08 8.11 38.25 4.44 40.13 5
PP377A 5 1.20 24.00 120.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 13.99 70.80 16.5 6.50 6 31 158.1 28.20 4 12.375 43.56 7.50 79.05 9.17 37.13 5
PP378A 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 13.14 66.53 16.5 6.50 7 28 166.6 32.90 4 15 52.8 9.10 71.40 8.28 45.00 6
PP379A 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 14.20 71.90 16.5 6.50 3 31 79.05 14.10 4 16.3 57.376 9.89 79.05 9.17 48.90 7.5
Total 94 3,832.00 91.91 2,110.56 2,247.60 536.61 227.50 2,344.40 484.10 470.83 81.12 1,695.94 196.68 401.27 51.50

Concrete in Steel in
Sr. No Str. ID Cum MT
1 Pile 4,089.06 159.80
2 Pile Cap 2,110.56 280.00
3 Pier 2,247.60 910.00
4 Pier Cap 536.61 227.50
5 Portal 872.10 132.62
6 I Girder 484.10 484.10
7 Deck Slab 1,695.94 196.68
Total 12,035.98 2,390.70
Work Description UOM Qty
1 1 m DIA Pile Meter 710.00
1.2 m DIA Pile Meter 3,122.00
Pile Cap PCC Cum 91.91
Pile Cap Cum 2,110.56
Pier
pier qnty (empty)
1.00
3.14
3.80
4.46
5.06
5.30
Total Result
3.142 3 3.142
3.80182 1 3.80182
4.46182 6 4.46182
5.0625 20 5.0625
5.30182 3 5.30182
2.55
text level not approved 15.89 5.30
Pile Pile Cap Pier length Pier Cap I Girder for Span I Girder For Portal Deck Slab For Span Deck Slab for Portal
pile TOTAL Steel Con.
PIER ID no. of plies pile dia length LENGTH PCC qnt Length Width Height Pilecap Qnty Pier length pier width/Dia pier height pier qnty Piercap Qnty Steel Nos Length Con. Qty Qty. Nos Length Qty Steel Qty. Concrete Steel Concrete Steel
P364 4 1.20 28.00 112.00 2.17 5.30 ### 1.80 50.56 2.20 2.50 1.00 4.46 21.19 6.50 4.00 31.00 105.40 18.80 79.05 9.17
P364A 4 1.00 26.00 104.00 1.57 4.50 ### 1.50 30.38 2.20 1.00 3.80 10.60 6.50 2.00 32.41 55.09 9.40 82.64 9.58
P365 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.20 2.50 1.00 4.46 21.19 6.50 4.00 31.00 105.40 18.80 79.05 9.17
P365A 4 1.00 29.00 116.00 1.57 4.50 ### 1.50 30.38 2.00 1.00 3.14 10.60 6.50 2.00 32.50 55.25 9.40 82.88 9.61
PP366A 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 7 31 184.45 32.90 4 11.497 40.46944 6.97 79.05 9.17 34.49 4
PP366B 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 0 - 0 - -
PP367A 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 7 31 184.45 32.90 4 11.505 40.4976 6.98 79.05 9.17 34.52 4
PP367B 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
P368 4 1.20 31.00 124.00 2.50 5.70 ### 1.80 58.48 2.20 2.50 1.00 4.46 21.19 6.50 4.00 31.00 105.40 18.80 79.05 9.17
P368A 4 1.00 29.00 116.00 1.57 4.50 ### 1.50 30.38 2.00 1.00 3.14 10.60 6.50 2.00 31.20 53.03 9.40 79.55 9.23
P369 4 1.20 30.00 120.00 2.17 5.30 ### 1.80 50.56 2.20 2.50 1.00 4.46 21.19 6.50 4.00 19.00 64.61 18.80 48.46 5.62
P369A 4 1.00 29.00 116.00 1.57 4.50 ### 1.50 30.38 2.00 1.00 3.14 10.60 6.50 2.00 19.00 32.30 9.40 48.45 5.62
SCP370 5 1.20 28.00 140.00 3.54 6.80 ### 1.80 83.23 1.00 1.00 6.50 0 - - -
SCP371 5 1.20 28.00 140.00 3.54 6.80 ### 1.80 83.23 1.00 1.00 6.50 4 13.8 46.92 18.80 35.19 4.08
PP372A 5 1.00 30.00 150.00 2.54 6.00 5.50 1.50 49.50 2.25 2.25 1.00 5.06 16.5 6.50 2 14.505 24.6585 9.40 4 13.6 47.872 8.25 36.99 4.29 40.80 5
PP372B 4 1.00 27.00 108.00 1.57 4.50 ### 1.50 30.38 2.25 2.25 1.00 5.06 16.5 6.50 6 28.7 146.37 28.20 73.19 8.49
PP373A 5 1.20 18.00 90.00 3.97 7.20 ### 1.80 93.31 2.25 2.25 1.00 5.06 16.5 6.50 6 31 158.1 28.20 4 13.356 47.01312 8.10 79.05 9.17 40.07 5
PP373B 4 1.20 15.00 60.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP374A 5 1.20 18.00 90.00 3.97 7.20 ### 1.80 93.31 2.25 2.25 1.00 5.06 16.5 6.50 6 17.6 89.76 28.20 4 13.375 47.08 8.11 44.88 5.20 40.13 5
PP374B 4 1.20 15.00 60.00 2.50 5.70 ### 1.80 58.48 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP375A 5 1.20 18.00 90.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 5 25.9 110.075 23.50 4 13.375 47.08 8.11 66.05 7.66 40.13 5
PP375B 4 1.20 15.00 60.00 2.17 5.30 ### 1.80 50.56 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP376A 5 1.20 24.00 120.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 5 15 63.75 23.50 4 13.375 47.08 8.11 38.25 4.44 40.13 5
PP376B 4 1.20 24.00 96.00 2.17 5.30 ### 1.80 50.56 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP377A 5 1.20 24.00 120.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 6 31 158.1 28.20 4 12.375 43.56 7.50 79.05 9.17 37.13 5
PP377B 4 1.20 24.00 96.00 2.17 5.30 ### 1.80 50.56 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP378A 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 7 28 166.6 32.90 4 15 52.8 9.10 71.40 8.28 45.00 6
PP378B 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
PP379A 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 3 31 79.05 14.10 4 16.3 57.376 9.89 79.05 9.17 48.90 7.5
PP379B 5 1.20 25.00 125.00 3.54 6.80 ### 1.80 83.23 2.25 2.25 1.00 5.06 16.5 6.50 0 - - -
P380 4 1.20 25.00 100.00 2.17 5.30 ### 1.80 50.56 2.50 2.50 1.00 5.30 15.89 6.50 3.00 31.00 79.05 14.10 79.05 9.17
P381 4 1.20 25.00 100.00 2.17 5.30 ### 1.80 50.56 2.50 2.50 1.00 5.30 15.89 6.50 3.00 31.00 79.05 14.10 79.05 9.17
P382 4 1.20 29.00 116.00 2.17 5.30 ### 1.80 50.56 2.50 2.50 1.00 5.30 15.89 6.50 3.00 22.00 56.10 14.10 56.10 6.51
P383 4 1.20 21.00 84.00 2.17 5.30 ### 1.80 50.56 2.20 2.50 1.00 4.46 15.89 6.50 3.00 27.73 70.72 14.10 70.72 8.20
P384 4 1.20 21.00 84.00 2.17 5.30 ### 1.80 50.56 2.20 2.50 1.00 4.46 15.89 6.50 3.00 27.73 70.72 14.10 70.72 8.20
Total 94 3,832.00 91.91 2,110.56 159.15 536.61 227.50 2,344.40 484.10 470.83 81.12 1,695.94 196.68 401.27 51.50
159.80

Concrete in Steel in
Sr. No Str. ID Cum MT
1 Pile 4,089.06 159.80
2 Pile Cap 2,110.56 280.00
3 Pier 159.15 910.00
4 Pier Cap 536.61 227.50
5 Portal 872.10 132.62
6 I Girder 484.10 484.10
7 Deck Slab 1,695.94 196.68
Total 9,947.53 2,390.70
6.5
Span Girder NoSpan Length Girder length 1st part
1 P364 - P365 4 31.00 29.70 10.05
2 P364A - P365A 2 32.41 31.11 10.05
3 P365-PP366 4 31.00 29.70 10.05
4 P365A-PP366 2 32.50 31.20 10.05
5 PP366 - PP367 7 31.00 29.70 10.05
6 PP367-P368 4 31.00 29.70 10.05
7 PP367-P368A 3 30.90 29.60 10.05
8 P368 - PP369 4 31.00 29.70 10.05
9 P368A - PP369A 2 32.00 30.70 10.05
10 P369 - SCP370 4 19.00 17.70 10.05
11 P369A - SCP370A 2 19.00 17.70 10.05
12 SCP371 - PP372 4 13.80 12.50 10.05
13 SCP371A - PP372 2 13.86 12.56 10.05
14 PP372 - PP373 4 28.70 27.40 10.05
15 PP372 - PP373 2 28.70 27.40 10.05
16 PP373 - PP374 6 29.80 28.50 10.05
17 PP374 - PP375 6 19.70 18.40 10.05
18 PP375 - PP376 5 25.00 23.70 10.05
19 PP376 - PP377 5 15.00 13.70 10.05
20 PP377 - PP378 6 31.00 29.70 10.05
21 PP378 - PP379 7 28.00 26.70 10.05
22 PP379 - P380 3 31.00 29.70 10.05
23 PP380 - P381 3 31.00 29.70 10.05
24 PP381 - P382 3 31.00 29.70 10.05
25 PP382 - P383 3 22.00 20.70 10.05
26 PP383 - P384 3 27.73 26.43 10.05
7.50
PP366A-PP366B 4 13.06 11.81 10.61
PP367A-PP367B 4 14.084 12.834 10.61
PP372A-PP372B 4 13.651 12.401 10.61
PP373A - PP373B 4 13.325 12.075 10.61
PP374A-PP374B 4 14.458 13.208 10.61
PP375A-PP375B 4 13.426 12.176 10.61
PP376A-PP376 4 13.405 12.155 10.61
PP377A-PP377B 4 12.278 11.028 10.61
PP378A-PP378B 4 14.91 13.66 10.61
PP379A -PP378B 4 16.473 15.223 10.61
40
0.98825 0.235
2nd Part Total Qty Total for I Girder Slab Width Thicknes Concrete Qty.
22.93 32.98 131.90 10.448 0.235 76.11
24.32 34.37 68.73 5.474 0.235 41.69
22.93 32.98 131.90 13.029 0.235 94.92
24.41 34.46 68.92 5.474 0.235 41.81
22.93 32.98 230.83 19.334 0.235 140.85
22.93 32.98 131.90 10.2 0.235 74.31
22.83 32.88 98.64 9.138 0.235 66.36
22.93 32.98 131.90 10.2 0.235 74.31
23.91 33.96 67.92 5.477 0.235 41.18
11.07 21.12 84.48 10.2 0.235 45.55
11.07 21.12 42.23 5.477 0.235 24.45
5.93 15.98 63.91 10.2 0.235 33.08
5.99 16.04 32.08 5.477 0.235 17.84
20.65 30.70 122.81 10.2 0.235 68.79
20.65 30.70 61.41 5.478 0.235 36.95
21.74 31.79 190.74 15.502 0.235 108.56
11.76 21.81 130.85 14.924 0.235 69.09
17.00 27.05 135.23 14.934 0.235 87.74
7.12 17.16 85.82 14.938 0.235 52.66
22.93 32.98 197.85 15.276 0.235 111.29
19.96 30.01 210.08 20.156 0.235 132.63
22.93 32.98 98.93 9.059 0.235 65.99
22.93 32.98 98.93 9.059 0.235 65.99
22.93 32.98 98.93 9.059 0.235 65.99
14.03 24.08 72.24 9.059 0.235 46.84
19.70 29.75 89.24 9.059 0.235 59.04
0.93
5.18 15.80 63.18 11.81 1.08 12.70
6.14 16.75 67.00 12.83 1.08 13.80
5.73 16.35 65.38 12.40 1.08 13.33
5.43 16.04 64.17 12.08 1.08 12.98
6.48 17.10 68.39 13.21 1.08 14.20
5.52 16.14 64.55 12.18 1.08 13.09
5.50 16.12 64.47 12.16 1.08 13.07
4.45 15.07 60.27 11.03 1.08 11.86
6.91 17.52 70.08 13.66 1.08 14.68
8.36 18.98 75.90 15.22 1.08 16.36
3,541.77 1,880.08
708.35 376.02
13.375
12.125
1.25
1.25

1.676
3.895
2.362
2.363
1.895
12.191
Portal Pier Cap Quantity 1 4.3 3.25 1 13.975
1 2.25 2.25 1 5.0625
2 0.5 1.025 1 1.025
1 4.3 3.25 2.4 33.54
Portal Pier Cap Quantity 53.6025
Pier Cap 1 3.5 7.725 0.8 21.63
1 3.5 2.5 1 8.75
2 3.5 1.306 1 9.142
Pier Cap 39.522
I Girder 1 3.75 0.575 2.05 4.420313
2 3 0.175 0.15 0.1575
2 3 0.0025 0.15 0.0023
1 0.3544 2.05 0.72652
5.30662
2 10.6132
5.5 0.932 5.126
Total for 1 Girder for 2.05 size 15.7392
I Girder 1 3.25 0.575 2.2 4.11125
2 2.5 0.175 0.15 0.13125
2 2.5 0.0025 0.15 0.0019
1 0.3544 2.2 0.77968
5.02408
2 10.0482
5.5 0.98825 5.435375
Total for 1 Girder for 2.05 size 15.4835
Cum

2.05
Cum 1.025
7.5 0.35 2050
0.175 -150
29.7 -46
22.2 -300
-150
1404

6.5

0.932
0.05625
0.98825