Myself, a Graduate Civil Engineer [AMIE] is working as DPM (Civil) in NCCL.

WORK EXPERIENCE :TOTAL 13 YEARS 05 MONTHS

Summary of Employment:

S. Designation Organization Period Duties


No
1 DPM NCC Limited 20/10/2020  Construction of Patna
(Civil) To metro viaduct and
Till Date station.(PC-01 Project)
2 Manager YFC Project 1/12/2019  Construction of IICC
(Civil) To Metro Station at
30/09/2020 Dwarka Delhi(YFC
Project)

3 Sr. Engg. YFC Project 1/4/2017  Construction of Metro


(Civil) To Station at CC 34 (YFC
30/11/2019 Project) Noida
4 Project Panchsheel 10/11/2013  Construction of Multi
Engineer Buildtech To Story Building (Six
(Civil) 31/03/2017 Block).
5 Junior Delhi Metro 10/08/2012  Works of one Elevated
Engineer Rail To Viaduct of Phase-III of
(Civil) Corporation 31/10/2013 Line 7 of DMRC.
Ltd.
6 Junior Delhi Metro 15/03/2009  Viaduct of Badarpur
Engineer Rail To Phase-II of line -7.
(Civil) Corporation 09/08/2012 Misc. other works such
Ltd. as estimation, report
preparation, design of
structures etc.
7 Junior Delhi Metro 28/04/2008  Works of one Elevated
Engineer Rail To Viaduct & 3 Stations of
(Civil) Corporation 14/03/2009 Noida line Phase-II of
Ltd. Line 7 of DMRC.
 Misc. other works such
as estimation, misc
finishing work etc.
8 Site Crossing 01/08/2007  General layout of
Engineer Republic To township
(civil) Ghaziabad 20/04/2008  Construction of
roundabout with
basement.
A. NCC Limited (Patna Metro Project PC01) (Delhi Metro Rail Corporation Ltd)

 Execution of barricading and piling work.


 Barricading fabrication work.
 Soil Investigation Work.
 BOQ (Bill of quantities) for the organization and reporting them to the team
lead.

 Making All Sub Contractor Bills & Client Bill.


 Verified the bills for correctness and accuracy.

 YFC Project (IICC Metro Staion Dwarka Delhi) ( Delhi Metro Rail
Corporation Ltd)

 Preparing cash flow reports and BOQ (Bill of quantities) for the
organization and reporting them to the team lead.
 Making All Sub Contractor Bills & Client Bill.
 Verified the bills for correctness and accuracy.
 Coordinated inter-departmental billing operations and maintained a
record of the same.
 Informed the company about prevailing market rates of material and labor.
Also, maintained a record of changing trends in the market conditions.
 Executed costing related activities concerning civil projects.
 Construction of IICC Metro Station R.Wall , Station Slab and Sub wal
Construction.

 YFC PROJECT(CC 34-Sector 34Metro station to ECC Station) )( Delhi


Metro Rail Corporation Ltd)

 Preparing cash flow reports and BOQ (Bill of quantities) for the
organization and reporting them to the team lead.
 Making All Sub Contractor Bills & Client Bill.
 Verified the bills for correctness and accuracy.
 Coordinated inter-departmental billing operations and maintained a
record of the same.
 Informed the company about prevailing market rates of material and labor.
Also, maintained a record of changing trends in the market conditions.
 Executed costing related activities concerning civil projects.
 Construction of 61 Noida Metro Station and Viaduct of structure
work(Such as pile, pile cap, pier & pier cap.
 Launching of spans including pre-stressing and grouting, this also includes
installation and testing of the launcher.
 Parapet Erection and Bearing Fixing of

B. Panchsheel Buildtech

Project: Green-II
Project Cost: 600Crores
Architect: Optimum Consultant
Position: Project Engineer
Nature of work: LB+UB+S+25storey residential project comprising of
4500units.

C. Delhi Metro Rail Corporation Ltd

 Phase III Works


a. Launching of spans including pre-stressing and grouting, this also
includes installation and testing of the launcher of Yaumana Bridge(CC-03)
and Stretch Karkardooma to Krishna Nagar(CC-12) of Line 7 in DMRC
(Mukundpur to Yamuna Vihar Corridor) .
b. Segment and Parapet casting and BBS work of Yaumana bridge
c. Piling, Pile Cap, Pier and Pier Cap Reinforcement and Casting Work.
Well Foundation Fork.
 Utility Survey (identifying exact location of various utilities to avoid
hazards during execution of work) and interfacing with utility owning
departments so that those can be relocated.

 Ashok nagar to Noida Corridor(BC-13)


a. Construction of City Center, Golf Course and Botanical Garden Metro
stations including Construction of UG Water Tank and Viaduct Work
(Piling, Pile Cap, Pier And Pier cap and pedestal casting and reinforcement
Work of Gammon India Ltd.
b. Launching of spans including pre-stressing and grouting, this also
includes installation and testing of the launcher.
a. Parapet Erection and Bearing Fixing of M/s Gammon India Ltd.
c. Finishing work including Flooring, Painting, Structural Glazing Roof
Portal fabrication, erection and Sheeting of elevated stations.
Miscellaneous works regarding opening of the corridor which includes
installation of high fencing, fixing and aligning of handrail along parapet,
house-keeping of station premises on the inaugural day where the opening
ceremony was scheduled etc.

d. Interfacing with Operation & Maintenance wing for handing over of the
station and viaduct.

 Central Secretariat to Badarpur Corridor(BC-26)


a. Launching of spans including pre-stressing and grouting, this also
includes installation and testing of the launcher.
b. Parapet Erection and Bearing Fixing of M/s Silmec India Ltd.
c. Miscellaneous works regarding opening of the corridor which includes
installation of high fencing, fixing and aligning of handrail along parapet,
house-keeping of station premises on the inaugural day where the opening
ceremony was scheduled etc.

 Airport Express Metro Line(AMEL)


a. Rectification work of AMEL of Replacement of Elastomeric Bearing
and Crack Repairing of U-Girder (contractor M/s Bridgecon India Ltd.)
b. Preliminary works including survey, traffic management plan
Development and its diversion.
EDUCATION /ACADEMIC PERFORMANCE
Marks % of
Sl. Name of marks
Year of obtained/
Examination Board/ or Remarks
No. passing Total
University
marks C. P. I.

Bachelor of AMIE CGPA


1 Civil 2013 Calcutta 65.52% 1ST Class
Engineering 6.93

Diploma of
2 Civil 2007 B.T.E.U.P 1776/2370 74.94% 1st Class
Engineering

Higher
UP Board 2nd
2 Secondary 2004 272/500 54.44%
Allahabad Division
(12th level)

COMPUTER KNOWLEDGE
 Operating system : Windows
 Other software packages : MS Office including MS Project, other related
software.

PERSONAL INFORMATION

Date of Birth : 10th Jan, 1988


Gender : Male
Marital status : Married
The information given above is true to the best of my knowledge.
Nationality : Indian
Father’s Name : Rajendra Tyagi
Languages Known : English & Hindi
Current CTC : 12 lac Per Annum
…………..………………………….
Place :Period
Notice GHAZIABAD : 15 Days (Vikas Tyagi)