You are on page 1of 2

CEB 30903 Sept 2016

Waste Management

Solid and Hazardous

Solid and Hazardous Waste Management Project


Proposal (Part I)

Objectives:

At the end of mini project, student should be able to:

Form a group consisting of SIX (6) members


Design a project consist of reduce, reuse and recycle
Identify the activities that can create awareness to MICETians
regarding 3R
Prepare a project proposal to be implemented by the whole
class

This Mini Project (Part I (Proposal) and Part 2 (Implementation)) will


contribute 10 % to the overall assessment for this course. The time frame
for mini project part I is 2 weeks starting from Week 2 towards end of Week
3. As a result, the students will be required to prepare a proposal (group) and
present (group). The presentation (power point format consist of 1-2 slides,
5 min of Q&A) will be scheduled on 12 October 2016 and the proposal need
to be submitted on 14 October before 12 noon. Group members
participation and contribution will be evaluated using Peer Evaluation form by
every student. Completed progress report form needs to be compiled
together with the report.

A: Structure of the Proposal Report:

Front cover
Abbreviations
Table of Content
List of Table and Figure
Contents
References
Appendix

B: Contents and marking:

CEB 30903 Sept 2016


Waste Management

1.

Introduction on 3R [10 marks]

2.

Introduction to the project [20 marks]


- Types of activities
- Objectives of the activities
- Implementation of the activities
- Advantages and limitation of the project

3.

Marketing strategies [10 marks]

4.

Gantt Chart on planning & progress [5 marks]

5.

Conclusion [5 marks]

Solid and Hazardous

You might also like