Estimate of the expenses necessary to be incurred for Improvements to LB Main canal from stn. 0+000 to st
3+250 in Girithale Scheme in Minneriya Division in Polonnaruwa Range.
Minneriya
Polonnaruwa
CRIP/WORKS/ID-POL/NCB/113
Climate Resilience Improvement Project
UMMARY OF BILLS
Description
Preliminaries
Improvements to LB Main canal from stn. 0+000 to stn. 0+470 in Girithale
Scheme.
Improvements to LB Main canal from stn. 0+470 to stn. 3+250 in Girithale
Scheme.
Sub Total - Summary of Bills
Physical Contingencies 10%
TOTAL ESTIMATED COST ( A+B )
Vat - 15%
GRAND TOTAL INCLUDING VAT - ( C+D )
repared by :- .
P.D.T. Goonathilake. E.A.
hecked by :-
Eng. M.B.Y. De Silva
ubmitted by :-
Eng. A.M.A.I.B. Abeysinghe
Divisional Irrigation Engineer.
Minneriya.
Page 2
Amount
1,767,600.00
16,450,572.15
13,920,467.65
32,138,639.80
3,213,534.11
35,352,173.91
5,302,826.09
40,655,000.00
Page 3
Estimate of the expenses necessary to be incurred for Improvements to LB Main canal from stn.
stn. 3+250 in Girithale Scheme in Minneriya Division in Polonnaruwa Range.
Division
Package No
: Minneriya
:
CRIP/WORKS/ID-POL/NCB/113
BILL NO. 01
Item
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.2
1.2.1
:
Units
PRELIMINARIES
Qty.
Performance security
Security bonds and guarantees etc.
Insurance of property materials and works at site
Third party insurance,
Insurance against accidents and injury to workmen
Project Manager's facilities
Provisional
Sum
Sum
1.3.2
Month
1.4.2
Sum
1.4.4
Sum
Provisional
Sum
1.4.6
Sum
1.4.7
Sum
1.4.8
1.4.9
10.0
Provisional
Sum
Provisional
Sum
1.4.3
1.4.5
Description
Securities, insurance & etc.
Provisional
Sum
Provisional
Sum
Provisional
Sum
Provisional
Sum
Provisional
Sum
1.3
1.3.1
1.4
1.4.1
Sum
Provisional
Sum
Prepared By :
P.D.T. Goonathilake. E.A.
Checked by :
Eng. M.B.Y. De Silva
Minneriya.
Range : Polonnaruwa
ate Resilience Improvement Project
Rate
30,371,039.80
Amount
(Rs.
Cts.)
(Rs.
Cts.)
182,200.00
182,226.24
0.60%
151,800.00
151,855.20
0.50%
151,800.00
151,855.20
0.50%
91,100.00
91,113.12
0.30%
91,100.00
91,113.12
0.30%
300,000.00
91,100.00
91,113.12
0.30%
182,000.00
18,222.62
0.06%
151,855.20
0.50%
45,500.00
45,556.56
0.15%
45,500.00
45,556.56
0.15%
21,200.00
21,259.73
0.07%
36,400.00
36,445.25
0.12%
60,700.00
60,742.08
0.20%
121,400.00
121,484.16
1,260,398.15
0.40%
18,200.00
20,000.00
151,800.00
24,000.00
1,767,600.00
Minneriya.
182,226.24
(26.24)
(55.20)
(55.20)
(13.12)
(13.12)
-
(13.12)
(22.62)
-
(55.20)
(56.56)
(56.56)
(59.73)
(45.25)
(42.08)
(84.16)
Estimate of the expenses necessary to be incurred for Improvements to LB Main canal from stn
3+250 in Girithale Scheme in Minneriya Division in Polonnaruwa Range.
Division
: Minneriya.
Package No : CRIP/WORKS/ID-POL/NCB/113
DAYWORKS SCHEDULE
Item
1
1.1
1.2
1.3
1.4
1.5
1.6
2
2.1
2.2
Description
Labour
Skilled Laborer
Unskilled Laborer
Mason
Carpenter
Steel Fixer
Painter
Materials
Cement
Sand
Unit
Qty
Day
Day
Day
Day
Day
Day
1
1
1
1
1
1
50kg bag
m3
1
10
2.3
Gravel
m3
10
2.4
Metal 25mm
10
2.5
Metal 40 mm
10
2.6
Metal 20 mm
m3
2.7
m3
m
ton
ton
m2
1
1
1
4
hr
hr
hr
hr
hr
hr
hr
1
1
1
1
1
1
1
2.8
2.9
2.10
2.11
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Prepared By :
P.D.T. Goonathilake. E.A.
3
3
Rate
Amount
1,750.00
1,200.00
1,750.00
1,750.00
1,750.00
1,400.00
1,750.00
1,200.00
1,750.00
1,750.00
1,750.00
1,400.00
900.00
1,059.00
900.00
10,590.00
706.00
7,060.00
2,030.00
20,300.00
1,942.00
19,420.00
2,472.00
2,472.00
1,236.00
1,236.00
1,236.00
90,000.00
100,000.00
823.00
1,236.00
90,000.00
100,000.00
823.00
3,950.00
4,300.00
4,500.00
1,375.00
469.00
275.00
500.00
3,950.00
4,300.00
4,500.00
1,375.00
469.00
275.00
500.00