LUAS PENAMPANG TULANGAN BAJA PER METER PANJAN

Diameter
Batang
(mm)
6
8
9
10
12
13
14
16
18
19
20
22
25
28
29
32
36
40
50

50

75

100

125

150

175

200

225

250

565.7
1005.7
1272.9
1571.4
2262.9
2655.7
3080.0
4022.9
5091.4
5672.9
6285.7

377.1
670.5
848.6
1047.6
1508.6
1770.5
2053.3
2681.9
3394.3
3781.9
4190.5
5070.5
6547.6
8213.3

282.9
502.9
636.4
785.7
1131.4
1327.9
1540.0
2011.4
2545.7
2836.4
3142.9
3802.9
4910.7
6160.0
6607.9
8045.7

226.3
402.3
509.1
628.6
905.1
1062.3
1232.0
1609.1
2036.6
2269.1
2514.3
3042.3
3928.6
4928.0
5286.3
6436.6
8146.3

188.6
335.2
424.3
523.8
754.3
885.2
1026.7
1341.0
1697.1
1891.0
2095.2
2535.2
3273.8
4106.7
4405.2
5363.8
6788.6
8381.0

161.6
287.3
363.7
448.98
646.5
758.8
880.0
1149.4
1454.7
1620.8
1795.9
2173.1
2806.1
3520.0
3775.9
4597.6
5818.8
7183.7

141.4
251.4
318.2
392.9
565.7
663.9
770.0
1005.7
1272.9
1418.2
1571.4
1901.4
2455.4
3080.0
3303.9
4022.9
5091.4
6285.7

125.7
223.5
282.9
349.2
502.9
590.2
684.4
894.0
1131.4
1260.6
1396.8
1690.2
2182.5
2737.8
2936.8
3575.9
4525.7
5587.3
8730.2

113.1
201.1
254.6
314.3
452.6
531.1
616.0
804.6
1018.3
1134.6
1257.1
1521.1
1964.3
2464.0
2643.1
3218.3
4073.1
5028.6
7857.1

Luas Penampang (mm2)


Jarak Spasi p.k.p (mm)
275
300
325
102.9
182.9
231.4
285.7
411.4
482.9
560.0
731.4
925.7
1031.4
1142.9
1382.9
1785.7
2240.0
2402.9
2925.7
3702.9
4571.4
7142.9

94.3
167.6
212.1
261.9
377.1
442.6
513.3
670.5
848.6
945.5
1047.6
1267.6
1636.9
2053.3
2202.6
2681.9
3394.3
4190.5
6547.6

87.0
154.7
195.8
241.8
348.1
408.6
473.8
618.9
783.3
872.7
967.0
1170.1
1511.0
1895.4
2033.2
2475.6
3133.2
3868.1
6044.0

LUAS PENAMPANG TULANGAN BAJA


Diameter
Batang
(mm)

6
8
9
10
12
13
14
16
18
19
20
22
25
28
29
32
36
40
50

28.3
50.3
63.6
78.6
113.1
132.8
154.0
201.1
254.6
283.6
314.3
380.3
491.1
616.0
660.8
804.6
1018.3
1257.1
1964.3

56.6
100.6
127.3
157.1
226.3
265.6
308.0
402.3
509.1
567.3
628.6
760.6
982.1
1232.0
1321.6
1609.1
2036.6
2514.3
3928.6

84.9
150.9
190.9
235.7
339.4
398.4
462.0
603.4
763.7
850.9
942.9
1140.9
1473.2
1848.0
1982.4
2413.7
3054.9
3771.4
5892.9

113.1
201.1
254.6
314.3
452.6
531.1
616.0
804.6
1018.3
1134.6
1257.1
1521.1
1964.3
2464.0
2643.1
3218.3
4073.1
5028.6
7857.1

141.4
251.4
318.2
392.9
565.7
663.9
770.0
1005.7
1272.9
1418.2
1571.4
1901.4
2455.4
3080.0
3303.9
4022.9
5091.4
6285.7
9821.4

169.7
301.7
381.9
471.4
678.9
796.7
924.0
1206.9
1527.4
1701.9
1885.7
2281.7
2946.4
3696.0
3964.7
4827.4
6109.7
7542.9
11785.7

198.0
352.0
445.5
550.0
792.0
929.5
1078.0
1408.0
1782.0
1985.5
2200.0
2662.0
3437.5
4312.0
4625.5
5632.0
7128.0
8800.0
13750.0

226.3
402.3
509.1
628.6
905.1
1062.3
1232.0
1609.1
2036.6
2269.1
2514.3
3042.3
3928.6
4928.0
5286.3
6436.6
8146.3
10057.1
15714.3

254.6
452.6
572.8
707.1
1018.3
1195.1
1386.0
1810.3
2291.1
2552.8
2828.6
3422.6
4419.6
5544.0
5947.1
7241.1
9164.6
11314.3
17678.6

Luas Penampang (mm2)


Jumlah Batang
10
11
12
282.9
502.9
636.4
785.7
1131.4
1327.9
1540.0
2011.4
2545.7
2836.4
3142.9
3802.9
4910.7
6160.0
6607.9
8045.7
10182.9
12571.4
19642.9

311.1
553.1
700.1
864.3
1244.6
1460.6
1694.0
2212.6
2800.3
3120.1
3457.1
4183.1
5401.8
6776.0
7268.6
8850.3
11201.1
13828.6
21607.1

339.4
603.4
763.7
942.9
1357.7
1593.4
1848.0
2413.7
3054.9
3403.7
3771.4
4563.4
5892.9
7392.0
7929.4
9654.9
12219.4
15085.7
23571.4

R METER PANJANG PLAT

g (mm2)
p (mm)
350

375

400

80.8
143.7
181.8
224.5
323.3
379.4
440.0
574.7
727.3
810.4
898.0
1086.5
1403.1
1760.0
1888.0
2298.8
2909.4
3591.8
5612.2

75.4
134.1
169.7
209.5
301.7
354.1
410.7
536.4
678.9
756.4
838.1
1014.1
1309.5
1642.7
1762.1
2145.5
2715.4
3352.4
5238.1

70.7
125.7
159.1
196.4
282.9
332.0
385.0
502.9
636.4
709.1
785.7
950.7
1227.7
1540.0
1652.0
2011.4
2545.7
3142.9
4910.7

GAN BAJA

g (mm2)
ang
13

14

15

367.7
653.7
827.4
1021.4
1470.9
1726.2
2002.0
2614.9
3309.4
3687.4
4085.7
4943.7
6383.9
8008.0
8590.2
10459.4
13237.7
16342.9
25535.7

396.0
704.0
891.0
1100.0
1584.0
1859.0
2156.0
2816.0
3564.0
3971.0
4400.0
5324.0
6875.0
8624.0
9251.0
11264.0
14256.0
17600.0
27500.0

424.3
754.3
954.6
1178.6
1697.1
1991.8
2310.0
3017.1
3818.6
4254.6
4714.3
5704.3
7366.1
9240.0
9911.8
12068.6
15274.3
18857.1
29464.3

A. DATA BANGUNAN
1. Jenis bangunan
2. Panjang bangunan
3. Jarak portal
4. Jenis tanah
5. Wilayah gempa
6. Mutu beton (fc`)
7. Mutu baja (fy)
8. Dimensi kolom (b=h)

9. Tinggi kolom :

10. Dimensi balok


11. Bentang Balok :

= Laboratorium
=
42 m
=
6m
= Lunak
= Manado
=
25 Mpa
=
400 Mpa
Lt.1 =
45 cm
Lt.2 =
45 cm
Lt.3 =
45 cm
Lt.1 =
4m
Lt.2 =
4m
Lt.3 =
4m
= 1/12 - 1/14
L1 =
3m
L2 =
4.75 m
L3 =
3.5 m
L4 =
6m

gambar 1

B. PRELIMINARY DESIGN
1. Preliminary Design Balok
a. Balok memanjang lantai 2, lantai 3 (L=600cm & L4= 600cm), B1
h=
1/12
x
L
=
1/12
x
600
=
50.00
b=
2/ 3
x
h
=
2/ 3
x
50.00
=
33

50 cm

35 cm

b. Balok melintang lantai 2, lantai 3 (L1=300 cm), B2


h=
1/12
x
L
=
1/12
x
300
=
b=
2/ 3
x
h
=
2/ 3
x
30
=

25.00

30

cm

20

20

cm

c. Balok melintang lantai 2 & lantai 3 (L2 = 475 cm), B3


h=
1/12
x
L
=
1/12
x
475
=
b=
2/ 3
x
h
=
2/ 3
x
40
=

39.58

40

cm

27

30

d. Balok melintang lantai 2 & lantai 3 (L3= 350cm), B2


h=
1/12
x
L
=
1/12
x
350
=
b=
2/ 3
x
h
=
2/ 3
x
30
=

29.17

30

20

20

e. Balok melintang atap (L1+L2=775cm), B5


h=
1/12
x
L
=
1/12
x
775
b=
2/ 3
x
h
=
2/ 3
x
65

64.58

65

cm

43

45

cm

f. Balok melintang atap (L3 & L4 =950 cm) B6


h=
1/14
x
L
=
1/14
x
950
b=
2/ 3
x
h
=
2/ 3
x
65

67.86

65

cm

43

45

cm

f. Balok anak (L=600 cm) B6


h=
1/14
x
=
1/14
x
b=
2/ 3
x
=
2/ 3
x

42.86

45

cm

30

30

cm

L
600
h
45

Dimensi Balok
a. Balok memanjang lantai 2, lantai 3 (L=600cm & L4= 600cm), B1
b. Balok melintang lantai 2, lantai 3 (L1=300 cm), B2
c. Balok melintang lantai 2 & lantai 3 (L2 = 475 cm), B3

cm

cm
cm

=
=
=

d. Balok melintang lantai 2 & lantai 3 (L3= 350cm), B2

e. Balok melintang atap (L1+L2=775cm), B5


f. Balok melintang atap (L3 & L4 =950 cm) B6
f. Balok anak (L=600 cm) B6

2. Preliminary Design Kolom


a. Balok memanjang lantai 2, lantai 3 dan atap (30/45), L=500cm & L=400cm, B2
I kolom
I balok
1/12.bh
1/12.30.45

L kolom
L balok
450
500
=
500.b

30 x 45 x 450

=
b
2460375

=
b
39.605028 cm

=
=
=
=

b. Balok melintang lantai 2, lantai 3 dan atap (30/45), L=500cm & L=400cm, B1
Ikolom
Ibalok
1/12.bh
1/12.30.45

Lkolom
Lbalok
450
500
=
500.b

30 x 45 x 450

=
b
2460375

=
b
39.605028 cm
c. Balok melintang lantai 2 (20/30), L=300cm & L=350cm, B3
Ikolom
Ibalok
1/12.bh

=
Lkolom
Lbalok
450
=
350.b
=
b
=
b
d. Balok melintang lantai 3 dan atap (40/60), L=650cm, B4
Ikolom
Ibalok
1/12.bh

=
Lkolom
Lbalok
450
=
650.b
=
b
=
b
c. Balok anak lantai 3 dan atap (30/40), L=500cm, Ba
Ikolom
Ibalok
1/12.bh

=
Lkolom
Lbalok
450
=
500.b
=
b
=
b
Dimensi kolom
a. Dimensi Kolom Lantai 1 = 50 cm
b. Dimensi Kolom Lantai 2 = 45 cm
c. Dimensi Kolom Lantai 3 = 45 cm

1/12.20.30
350
20 x30 x 450
972000
31.399054 cm

1/12.40.60
650
40 x 60 x 450
5981538.46153846
49.454205 cm

1/12.30.40
500
30 x 40 x 450
1728000
36.256505 cm

35/50
20/30
30/40

20/30
45/65
45/65
30/45

C. Perhitungan pelat atap

Untuk perhitungan diambil contoh plat yang terbesar (plat A) maka :


Jenis plat yang ada :
Balok 1 :
Balok 2 :

ly
lx

h=
h=

45 cm
45 cm

b=
b=

5000
=
5000
30 cm
30 cm

1.00

Bentang bersih plat :


Arah memanjang (lny)

=
ly
=
5000
=
4700 mm
Arah melintang (lnx)
=
lx
=
5000
=
4700 mm
Mencari nilai (rasio bentang bersih arah memanjang terhadap arah memendek) :
nilai
=
lny
=
4700
=
lnx
4700
Menentukan tebal minimum plat (hmin) :
Balok arah melintang
Tebal plat atap diasumsikan

bW

=
=
=
=

Lebar efektif (bE) arah melintang

Lebar flens
Syarat : lebar flens

bE

4t

0.5
0.5

x
x

(lebar balok 1 + lebar ba


300

0.5
0.5

x
x

(lebar balok 1 + lebar ba


300

1.00

120 mm
2 (h t) + bw
2
x
960 mm
960
2
480 mm

lx
=
ly
=
Plat 2 arah karena 1 < 2

hbalok
bw

=
=

330

300

300

330

OK

Mencari nilai K :

bE
t
k 1
1

b
w

t
t
4

4 6
h

960
120
1
1

300
4 5 0

=
=

{ 1.59
3.290

120

4 6

4 5 0

b E 1 t

bw

120

4 5 0

960

120

1

300

4 5 0

{ 2.07 }

gambar potongan balok 30/45

Mencari Ib balok arah melintang :


Ib
=
1/12 x K x bw x h3
=

1
12

3.290

=
7496143200
Mencari Ip arah melintang :
1/12 x lnx x h3
Ip
=
=

1/12

4700

676800000

bE

Syarat : lebar flens


Mencari nilai K :

bE
t
k 1
1

bw
h

bW

=
=
=
=

4t

{ 1.59
3.290

120

120 mm

hbalok
bw

2 (h t) + bw
2
x
960 mm
960
2
480 mm

t
t
4

4 6

h
h

960
120
1
1

3
0
0

4 5 0

=
=

450 3

mm4

Lebar efektif (bE) arah memanjang

mm4

Balok arah memanjang


Tebal plat atap diasumsikan

Lebar flens

300

330

300

300

330

{ 2.07 }

OK

b E 1 t

bw

120
120
4

4 6
4
5
0

4 5 0

=
=

9 6 0 1 1 2 0

300

4 5 0

gambar potongan balok 30/45

Mencari Ib balok arah memanjang :


Ib

=
=

1/12 x K x bw x h3
1

3.290

300

450 3

12
=

7496143200

mm4

Mencari Ip arah memanjang :


Ip

1/12 x lny x h3

1/12

4700

=
676800000
mm
Nilai untuk arah melintang bangunan (1) :
nilai
1
=
Ib melintang
Ip melintang
Nilai untuk arah memanjang bangunan (2) :
nilai
2
=
Ib memanjang
Ip memanjang
Nilai rata-rata :
m
=
2 1
+
4

120

7496143200
676800000

11.08

7496143200
676800000

11.08

2 2

2.00 11.08

2.00
4

=
Ternyata m
=
11.08

Sehingga untuk hmin plat agar memenuhi syarat lendutan digunakan :


hmin
=
ln x (0.8+(fy/1500)

90 mm

11.08
2.00
{ SNI 03-2847-2002 Pasal 11.5.3 (3(c)) hal. 278-279}

36+9
=

4700
36

4700

0.8

0.24

0.8
36
+
hmin
=
108.622 mm

Maka diambil tebal plat atap sebesar =

360
1500
1.0

9.0
90 mm
110 mm

11 cm

Pembebanan pada plat :


Beban mati :
(PPIUG 1983 hal. 11-12)
berat sendiri plat t. 11 cm

0.11

2400

264.00

berat plafond dan rangka

18

18.00

berat lapisan aspal + pasir t. 1 cm

14

14.00

Wdl

296.00

Wll

100

(PPIUG 1983 hal. 13)


Beban hidup atap untuk gedung sekolah :
Beban ultimate / beban berfaktor :

Wu

=
=
=

1.2
Wdl
1.20 296.0
515.2 kg/m2

+
+

1.6
1.6

Perhitungan momen tumpuan dan momen lapangan :


Plat terjepit penuh pada keempat sisinya maka momen plat : (Tabel 13.3.1 -PBI 1971, hal 202)
nilai

=
=

Lx
=

lny
lnx
4700
4700
1.00

Ly
Untuk perhitungan diambil contoh plat yang terbesar (plat A) maka :
Mutx

Muty

MuLx

MuLy

=
=
=
=
=
=
=
=
=
=
=
=

-0.001
-0.001
-669.76
-0.001
-0.001
-669.76
0.001
0.001
270.48
0.001
0.001
270.48

x
x
kg-m
x
x
kg-m
x
x
kg-m
x
x
kg-m

Wu
515.20

x
x
=
-6697600
Wu
x
515.20
x
=
-6697600
Wu
x
515.20
x
=
2704800
Wu
x
515.20
x
=
2704800

lx2
25
N-mm
lx2
25
N-mm
lx2
25
N-mm
ly2
25
N-mm

x
x

Lx
Ly
X
52

x
x

X
52

x
x

X
21

x
x

X
21

=
=

Perhitungan tulangan lapangan dan tumpuan :

(Lentur murni plat, Gideon ha

Diasumsikan menggunakan tulangan

=
10 mm
Selimut beton diasumsikan dengan tebal
=
20 mm
dx
=
Tebal plat - Selimut beton - (0,5 x diameter tulangan)
=
110
20
0.5
x
10
=
85 mm
dy
=
Tebal plat - Selimut beton - diameter tulangan - (0,5 x diameter tulangan)
=
110
20
10
0.5
x
10
=
75 mm
Tulangan lapangan arah X :
Mn
=
Mu
=
2704800
=
3381000
N-mm
0.8

Rn
=
Mn
=
3381000
=
3381000
2
b x dx
1000
x
85 2
7225000
(Chu Kia Wang Hal. 54 - 55)
m
=
fy
=
0.85 x fc'

1
1
m

=
1
18.82
=
0.00118
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
400
0.0271
0.75
*
0.75
*
0.00350

400
x

0.85

25

1.4
400

600
600 fy

0.85

18.82

2 Rn m

fy

1
1

baik untuk arah x atau y

25

0.85

18.82

0.0035

(SI, ACI 318-83M dalam Chu-Kia wang hal 49)

600
b

0.468
400

600
+

400

(ACI 10.3.3 dalam Chu-Kia wang hal 49)


0.0271
>

0.00350

0.0203
=
max
=
0.00118
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00350
x
1000
x
85
2
=
297.50
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)
Tulangan lapangan arah Y :

Mn

Mu

Rn

Mn
b x dy2
fy
0.85 x fc'

2704800
0.8

=
1000
=
0.85

1
1
m

=
1
18.82
=
0.00152
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

=
=
=
=
=

max
min
Digunakan

3381000

3381000
x
75
400
x
25

1.4
400

18.82

25

600
600 fy

x
400
0.0271
0.75
*
0.75
*
0.00350

3381000
5625000

0.85

N-mm
=

(Chu Kia Wang Hal. 54 - 5

2 Rn m

fy

1
1

0.85

0.601
400

18.82

0.00350

( Chu-Kia wang hal 49)

x
600

600
+

400

b
0.0271
>

0.00350

=
0.0203
max
=
0.00152
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00350
x
1000
x
75
2
=
262.50
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)
Tulangan tumpuan arah X :
Mn
=
Mu
=

6697600
0.8

Rn
m

=
=

Mn
b x dx2
fy
0.85 x fc'

=
1000
=

1
1
m

=
1
18.82
=
0.00298
Cek rasio penulangan :
min
=
1.4

0.85

1
1

8372000

N-mm

8372000
x
85
400
x
25

8372000
7225000

18.82

(Chu Kia Wang Hal. 54 - 5

2 Rn m

fy

1.4

1.159
400

0.00389

18.82

fy

=
=
=
=
=

max
min

360

0,85 fc

600
1

fy

600 fy

Digunakan

0.85

x
360
0.0339
0.75
*
0.75
*
0.00389

27

( Chu-Kia wang hal 49)

0.85

x
600

600
+

360

b
0.0339
>

0.00389

=
0.0254
max
=
0.00298
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00389
x
1000
x
85
2
=
330.56
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)
Tulangan tumpuan arah Y :
Mn
=
Mu
=
6697600
=
8372000
N-mm
0.8

Rn
=
Mn
=
8372000
=
8372000
2
b x dy
1000
x
75 2
5625000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25

1
1
m

=
1
18.82
=
0.00386
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
360
0.0339
0.75
*
0.75
*
0.00389

1.4
360

600
600 fy

0.85

2 Rn m

fy

1
1

(Chu Kia Wang Hal. 54 - 5

27

0.85

1.488
400

18.82

0.00389

( Chu-Kia wang hal 49)

x
600

600
+

360

Menentukan tulangan yang terpakai :


As
=
.b.d
=
=

0.0339
<

0.00386

0.00386
289.59

=
0.0254
max
=
0.00386
<
=
untuk menghitung kebutuhan luas penampang tulangan.

x
mm2

1000

75

Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)

Tulangan susut :
Tulangan susut untuk fy =
Assusut
=
.b.h

400 Mpa
0.0018

1000

110

=
198.00
mm2
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
8 - 200 mm
(as =
251.43
mm2)
Syarat : spasi tulangan susut 5x tebal plat atau 550 mm.

Rekapitulasi penulangan plat atap :


Tulangan lapangan arah X
Tulangan lapangan arah Y
Tulangan tumpuan arah X
Tulangan tumpuan arah Y
Tulangan susut

=
=
=
=
=

10 - 200 mm
10 - 200 mm
10 - 200 mm
10 - 200 mm
8 - 200 mm

OK

5000 mm
5000 mm
rah karena 1 < 2

(lebar balok 1 + lebar balok 2)


+
300
(lebar balok 1 + lebar balok 2)
+
300

450
300

mm

mm
mm

960

120
1

300

4 5 0

450
300

mm
mm

mm

60

1 20
1

00

4 5 0

11.08

.5.3 (3(c)) hal. 278-279}

kg/m2
kg/m2
kg/m2
+

kg/m2
kg/m2
Wll
100

5.00
5.00

m
m

(Lentur murni plat, Gideon hal.93)

baik untuk arah x atau y.

0.468

Chu-Kia wang hal 49)

a wang hal 49)


0.02032

0.601
(Chu Kia Wang Hal. 54 - 55)

0.02032

1.159
(Chu Kia Wang Hal. 54 - 55)

0.02540

(Chu Kia Wang Hal. 54 - 55)

1.488

0.02540

D. Perhitungan pelat lantai 2 dan lantai 3

Untuk perhitungan diambil contoh plat yang terbesar (plat A) maka :


Jenis plat yang ada :
Balok 1 :
Balok 2 :

ly
lx

h=
h=

45 cm
45 cm

b=
b=

5000
=
5000
30 cm
30 cm

1.00

Bentang bersih plat :


Arah memanjang (lny)

=
ly
=
5000
=
4700 mm
Arah melintang (lnx)
=
lx
=
5000
=
4700 mm
Mencari nilai (rasio bentang bersih arah memanjang terhadap arah memendek) :
nilai
=
lny
=
4700
=
lnx
4700
Menentukan tebal minimum plat (hmin) :
Balok arah melintang
Tebal plat atap diasumsikan

bW

=
=
=
=

Lebar efektif (bE) arah melintang

Lebar flens
Syarat : lebar flens

bE

4t

0.5
0.5

x
x

(lebar balok 1 + lebar ba


300

0.5
0.5

x
x

(lebar balok 1 + lebar ba


300

1.00

120 mm
2 (h t) + bw
2
x
960 mm
960
2
480 mm

lx
=
ly
=
Plat 2 arah karena 1 < 2

hbalok
bw

=
=

330

300

300

330

OK

Mencari nilai K :

bE
t
k 1
1

b
w

t
t
4

4 6
h

96 0
120
1
1

30 0
4 5 0

=
=

{ 1.59
3.290

12 0

4 6

4 5 0

b E 1 t

bw

120

4 5 0

960

120

1

300

4 5 0

{ 2.07 }

gambar potongan balok 30/45

Mencari Ib balok arah melintang :


Ib
=
1/12 x K x bw x h3
=

1
12

3.290

=
7496143200
Mencari Ip arah melintang :
1/12 x lnx x h3
Ip
=
=

1/12

4700

676800000

bE

Syarat : lebar flens


Mencari nilai K :

bE
t
k 1
1

bw
h

bW

=
=
=
=

4t

{ 1.59
3.290

120

120 mm

hbalok
bw

2 (h t) + bw
2
x
960 mm
960
2
480 mm

t
t
4

4 6

h
h

960
120
1
1

3
0
0

4 5 0

=
=

450 3

mm4

Lebar efektif (bE) arah memanjang

mm4

Balok arah memanjang


Tebal plat atap diasumsikan

Lebar flens

300

330

300

300

330

{ 2.07 }

OK

b E 1 t

bw

120
120
4

4 6
4
5
0

4 5 0

=
=

9 6 0 1 1 2 0

300

4 5 0

gambar potongan balok 30/45

Mencari Ib balok arah memanjang :


Ib

=
=

1/12 x K x bw x h3
1

3.290

300

450 3

12
=

7496143200

mm4

Mencari Ip arah memanjang :


Ip

1/12 x lny x h3

1/12

4700

=
676800000
mm
Nilai untuk arah melintang bangunan (1) :
nilai
1
=
Ib melintang
Ip melintang
Nilai untuk arah memanjang bangunan (2) :
nilai
2
=
Ib memanjang
Ip memanjang
Nilai rata-rata :
m
=
2 1
+
4

120

7496143200
676800000

11.08

7496143200
676800000

11.08

2 2

=
Ternyata m
=
11.08

Sehingga untuk hmin plat agar memenuhi syarat lendutan digunakan :


hmin
=
ln x (0.8+(fy/1500)

90 mm

2.00 11.08

+
4

2.00

11.08
2.00

{ SNI 03-2847-2002 Pasal 11.5.3 (3(c)) hal. 278-27

36+9
=

4700
36

4700

0.8

0.24

0.8
36
+
hmin
=
108.622 mm

Maka diambil tebal plat atap sebesar =

360
1500
1.0

9.0
90 mm
110 mm

11 cm

Pembebanan pada plat :


Beban mati :
(PPIUG 1983 hal. 11-12)
berat sendiri plat t. 11 cm

0.11

2400

264.00

berat plafond dan rangka

18

18.00

berat spesi t. 2 cm

21

42.00

berat keramik t. 1 cm

24

24.00

Wdl

348.00

Wll

250

(PPIUG 1983 hal. 17)


Beban hidup atap untuk gedung sekolah :
Beban ultimate / beban berfaktor :

Wu

=
=
=

1.2
Wdl
1.20 348.0
817.6 kg/m2

+
+

1.6
1.6

Perhitungan momen tumpuan dan momen lapangan :


Plat terjepit penuh pada keempat sisinya maka momen plat : (Tabel 13.3.1 -PBI 1971, hal 202)
nilai

=
=

Lx

lny
lnx
4700
4700
1.00

Ly
Untuk perhitungan diambil contoh plat yang terbesar (plat A) maka :
Mutx

Muty

MuLx

MuLy

=
=
=
=
=
=
=
=
=
=
=
=

-0.001
-0.001
-1062.88
-0.001
-0.001
-1062.88
0.001
0.001
429.24
0.001
0.001
429.24

x
x
kg-m
x
x
kg-m
x
x
kg-m
x
x
kg-m

Wu
817.60

x
x
=
-10628800
Wu
x
817.60
x
=
-10628800
Wu
x
817.60
x
=
4292400
Wu
x
817.60
x
=
4292400

lx2
25
N-mm
lx2
25
N-mm
lx2
25
N-mm
ly2
25
N-mm

x
x

Lx
Ly
X
52

x
x

X
52

x
x

X
21

x
x

X
21

=
=

Perhitungan tulangan lapangan dan tumpuan :

(Lentur murni plat, Gideon ha

Diasumsikan menggunakan tulangan

=
10 mm
Selimut beton diasumsikan dengan tebal
=
20 mm
dx
=
Tebal plat - Selimut beton - (0,5 x diameter tulangan)
=
110
20
0.5
x
10
=
85 mm
dy
=
Tebal plat - Selimut beton - diameter tulangan - (0,5 x diameter tulangan)
=
110
20
10
0.5
x
10
=
75 mm
Tulangan lapangan arah X :
(Chu Kia Wang Hal. 54 - 55)
Mn
=
Mu
=
4292400
=
5365500
N-mm
0.8

Rn
=
Mn
=
5365500
=
5365500
2
b x dx
1000
x
85 2
7225000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25

1
1
m

=
1
18.82
=
0.00189
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
400
0.0271
0.75
*
0.75
*
0.00350

1.4
400

600

600 fy

25

0.85

0.743
400

18.82

0.00350
( Chu-Kia wang hal 49)

0.85

2 Rn m

fy

1
1

baik untuk arah x atau y

x
600

600
+

400

b
0.0271
>

0.00350

=
0.0203
max
=
0.00189
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00350
x
1000
x
85
2
=
297.50
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)

Tulangan lapangan arah Y :


Mn
=
Mu
=

4292400
0.8

Rn

Mn
b x dy2
fy
0.85 x fc'

=
1000
=
0.85

1
1
m

=
1
18.82
=
0.00244
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

=
=
=
=
=

max
min
Digunakan

5365500

N-mm

5365500
x
75
400
x
25

5365500
5625000

(Chu Kia Wang Hal. 54 - 5

18.82

2 Rn m

fy

1
1

1.4
400

0.954
400

0.00350

18.82

( Chu-Kia wang hal 49)

600

600 fy

0.85

x
400
0.0271
0.75
*
0.75
*
0.00350

25

0.85

x
600

600
+

400

b
0.0271
>

0.00350

=
0.0203
max
=
0.00244
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00350
x
1000
x
75
2
=
262.50
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 200 mm
(as =
392.86
mm2
)
Tulangan tumpuan arah X :
Mn
=
Mu
=

10628800
=
0.8
13286000
1000
x
85
400
0.85
x
25

Rn
m

=
=

Mn
b x dx2
fy
0.85 x fc'

=
=

1
1
m

=
1
18.82
=
0.00482
Cek rasio penulangan :

1
1

13286000

N-mm

=
2

(Chu Kia Wang Hal. 54 - 5

13286000
7225000

1.839
400

18.82

18.82

2 Rn m

fy

min

1.4
fy

1.4
360

0,85 fc

600
1
fy

600 fy

=
=
=
=

max
min
Digunakan

0.85

x
360
0.0339
0.75
*
0.75
*
0.00389

27

( Chu-Kia wang hal 49)

b
=

0.00389

0.85

x
600

600
+

360

b
0.0339
>

0.00482

=
0.0254
max
=
0.00482
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00482
x
1000
x
85
=
409.32
mm2
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 125 mm
(as =
628.57
mm2
)
Tulangan tumpuan arah Y :
Mn
=
Mu
=
10628800
=
13286000
N-mm
0.8

Rn
=
Mn
=
13286000
=
13286000
2
b x dy
1000
x
75 2
5625000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25

1
1
m

=
1
18.82
=
0.00628
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
360
0.0339
0.75
*
0.75
*
0.00389

2 Rn m

fy

1
1

(Chu Kia Wang Hal. 54 - 5

1.4
360

2.362
400

0.00389

18.82

( Chu-Kia wang hal 49)

600

600 fy

0.85

27

0.85

x
600

600
+

360

Menentukan tulangan yang terpakai :


As
=
.b.d
=

0.0339
<

0.00628

0.00628

=
0.0254
max
=
0.00628
<
=
untuk menghitung kebutuhan luas penampang tulangan.

1000

75

=
470.67
mm2
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
10 - 125 mm
(as =
628.57
mm2
)
Tulangan susut :
Tulangan susut untuk fy =
Assusut
=
.b.h

400 Mpa
0.0018

1000

110

=
198.00
mm2
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
8 - 200 mm
(as =
251.43
mm2)
Syarat : spasi tulangan susut 5x tebal plat atau 550 mm.

Rekapitulasi penulangan plat atap :


Tulangan lapangan arah X
Tulangan lapangan arah Y
Tulangan tumpuan arah X
Tulangan tumpuan arah Y
Tulangan susut

=
=
=
=
=

10 - 200 mm
10 - 200 mm
10 - 125 mm
10 - 125 mm
8 - 200 mm

OK

5000 mm
5000 mm
arah karena 1 < 2

(lebar balok 1 + lebar balok 2)


+
300
(lebar balok 1 + lebar balok 2)
+
300

450
300

mm

mm
mm

960

120
1

300

4 5 0

450
300

mm
mm

mm

60

120
1

00

4 5 0

11.08

Pasal 11.5.3 (3(c)) hal. 278-279}

kg/m2
kg/m2
kg/m2
kg/m2
+

kg/m2
kg/m2

(PPIUG 1983)

Wll
250

5.00
5.00

m
m

(Lentur murni plat, Gideon hal.93)

baik untuk arah x atau y.

ng tulangan.

0.743

0.02032

(Chu Kia Wang Hal. 54 - 55)

0.954

( Chu-Kia wang hal 49)

0.02032

ng tulangan.

(Chu Kia Wang Hal. 54 - 55)

1.839

( Chu-Kia wang hal 49)

0.02540

ng tulangan.

(Chu Kia Wang Hal. 54 - 55)

2.362

( Chu-Kia wang hal 49)

ng tulangan.

0.02540

TABEL PERHITUNGAN PELAT ATAP


Fc =
Fy =
Type
Pelat
A1

A2

A3

A4

25
390
Daerah
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y

Mpa
Mpa
Ly/lx
1.68
1.68
1.68
1.68
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17

min =
maks =
Wu
(kg/m2)
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2
515.2

Ly
(m)
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20

Lx
(m)
2.50
2.50
2.50
2.50
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60

0.00350
0.02032
X
21
21
52
52
34
18
73
57
38
14
81
57
31
19
69
57

M
(Kgm)
67.62
190.85
167.44
472.58
227.02
163.59
487.42
518.02
253.73
127.23
540.84
518.02
206.99
172.67
460.71
518.02

b Pelat =
h Pelat =

(mm)
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

h
(mm)
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100

d
(mm)
75
65
75
65
75
65
75
65
75
65
75
65
75
65
75
65

1000
100
Rn
(N/mm2)
0.150
0.565
0.372
1.398
0.504
0.484
1.083
1.533
0.564
0.376
1.202
1.533
0.460
0.511
1.024
1.533

perlu
0.00039
0.00147
0.00096
0.00371
0.00131
0.00126
0.00285
0.00409
0.00147
0.00097
0.00318
0.00409
0.00119
0.00133
0.00269
0.00409

TABEL PERHITUNGAN PELAT LANTAI 2 DAN 3


Fc =
Fy =
Type
Pelat
A6

A7

A8

A9

25
390
Daerah
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y
Lap x
Lap y
Tum x
Tum y

Mpa
Mpa
Ly/lx
1.68
1.68
1.68
1.68
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17
1.17

min =
maks =
Wu
(kg/m2)
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6
817.6

Ly
(m)
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20
4.20

Lx
(m)
2.50
2.50
2.50
2.50
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60

0.0035
0.0203
X
21
21
52
52
34
18
73
57
38
14
81
57
31
19
69
57

M
(Kgm)
107.31
302.87
265.72
749.97
360.27
259.60
773.52
822.08
402.65
201.91
858.28
822.08
328.48
274.03
731.13
822.08

b Pelat =
h Pelat =

(mm)
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10

h
(mm)
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120
120

d
(mm)
95
85
95
85
95
85
95
85
95
85
95
85
95
85
95
85

1000
120
Rn
(n/mm2)
0.149
0.524
0.368
1.298
0.499
0.449
1.071
1.422
0.558
0.349
1.189
1.422
0.455
0.474
1.013
1.422

perlu
0.00038
0.00136
0.00095
0.00344
0.00130
0.00116
0.00282
0.00378
0.00145
0.00090
0.00314
0.00378
0.00118
0.00123
0.00266
0.00378

m=

mm
mm

Pakai
0.00350
0.00350
0.00350
0.00371
0.00350
0.00350
0.00350
0.00409
0.00350
0.00350
0.00350
0.00409
0.00350
0.00350
0.00350
0.00409

As hitung
(mm2)
262.50
227.50
262.50
241.47
262.50
227.50
262.50
265.65
262.50
227.50
262.50
265.65
262.50
227.50
262.50
265.65

As pakai
(mm2)
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86
392.86

18.82

Tulangan
pakai
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200
10 -200

Tulangan
susut
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200

mm
mm

Pakai
0.00350
0.00350
0.00095
0.00344
0.00350
0.00350
0.00350
0.00378
0.00350
0.00350
0.00350
0.00378
0.00350
0.00350
0.00350
0.00378

m=

As hitung
(mm2)
332.50
297.50
90.46
292.25
332.50
297.50
332.50
321.42
332.50
297.50
332.50
321.42
332.50
297.50
332.50
321.42

As pakai
(mm2)
392.86
392.86
628.57
628.57
392.86
392.86
628.57
628.57
392.86
392.86
628.57
628.57
392.86
392.86
628.57
628.57

18.82

Tulangan
pakai
10 -200
10 -200
10 -125
10 -125
10 -200
10 -200
10 -125
10 -125
10 -200
10 -200
10 -125
10 -125
10 -200
10 -200
10 -125
10 -125

Tulangan
susut
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200
8 - 200

PERHITUNGAN TANGGA
Preliminary tangga
Data material tangga
fy
=
360 Mpa
f'c
=
27 Mpa
Jenis bangunan
=
Sekolah
Lokasi bangunan
=
Tanah Sedang
Wilayah gempa
=
3.00

gambar tampak atas tangga

gambar rencana tangga


menentukan dimensi balok bordes, L = 400 Cm
h=
1/12
x
L
=
1/12
x
400
=

33.3

35

Cm

b=
2/ 3
x
h
35
=
2/ 3
x
=
23

25
jadi ukuran balok bordes = 25/35
perhitungan tangga
direncanakan :
Penentuan dimensi anak tangga menggunakan rumus : 2.O+1.a=58-63 cm
dimana :
O
=
optrade (langkah naik).
a
=
aantrade (langkah datar).
Anak tangga di rancang dengan dimensi :
optrade (langkah naik)
(O)
=
18 cm
aantrade (langkah datar)
(a)
=
25 cm
maka :
2.O + 1.a =
2
x
18
+
1
x
= 36
+
25
= 61
cm

OK
Beda tinggi
:
450 cm
Tinggi bordes
:
225 cm
banyak anak tangga :
450/18 = 25.00
25 buah
jadi, tangga terdiri dari 26 anak tangga dan bordes

berat sendiri pelat tangga

0.12 x 2400 kg/m3

berat anak tangga

berat spesi t. 2 cm
berat keramik t.1cm

beban hidup ( Wll )

25

25 cm

18
cm

kemiringan tangga :
bawah tangga ( a1 )
a1= arc tang (18/25)
= 34
lebar tangga =
180 cm
tabal pelat anak tangga :
luas segi tiga ABC
= (1/2) 25 x 18
=
225 cm
AC= (25+18)
=
31 cm
t (tinggi )
luas segitiga
t (tinggi )
tebal anak tangga = tebal pelat + tinggi anak tangga
= 12 + 14.61 =
26.61
pembebanan struktur tangga
Tebal plat tangga diasumsikan dengan tebal =
(PPIUG 1983 hal. 11-12)
Beban mati ( Wdl )

Cm

gambar sketsa anak tangga


=
=

0.5 x 31 x t
225/(0,5*31)

27.00 Cm
12 cm

120

288.00 Kg/m

0.5 x 0.1461 x 2400 kg/m

175.29 Kg/m

2 x 21 kg/m2

42 Kg/m

1 x 24 kg/m

24 Kg/m
529.29 Kg/m

(PPIUG 1983 hal. 17)

Beban hidup tangga

14.61 cm

300 Kg/m

beban ultimate ( Wu )
=
Wu

qu

1.2

Wdl

1.6

Wll

1.20 529.3

1.6

300

1115.15

kg/m

1115.15

Lebar tangga

1115.15

1.8

2007.27

kg/m

Pembebanan bordes
Tebal plat bordes diasumsikan dengan tebal =

12 cm

(PPIUG 1983 hal. 11-12)

Beban mati ( Wdl )


berat sendiri pelat tangga

0.12 x 2400 kg/m3

288.00 Kg/m

berat spesi t. 2 cm

2 x 21 kg/m

42 Kg/m

berat keramik t. 1 cm

1 x 24 kg/m2

24 Kg/m
354.00 Kg/m

(PPIUG 1983 hal. 17)

beban hidup ( Wll )

Beban hidup tangga


beban ultimate ( Wu )
=
Wu
=
qu

120

=
=
=
=

1.2
Wdl
1.20 354.0
904.8 kg/m2
904.80
904.80
3619.20

300 Kg/m

+
+
x
x
kg/m

1.6
1.6

Wll
300

Panjang bordes
4

PERHITUNGAN TULANGAN STRUKTUR TANGGA BAGIAN BAWAH DAN ATAS :

Diasumsikan menggunakan tulangan

=
12 mm
baik untuk arah x atau y
Selimut beton diasumsikan dengan tebal
=
20 mm
dx
=
Tebal plat - Selimut beton - (0,5 x diameter tulangan)
=
120
20
0.5
x
12
=
94 mm
dy
=
Tebal plat - Selimut beton - diameter tulangan - (0,5 x diameter tulangan)
=
120
20
12
0.5
x
12
=
82 mm
Tulangan arah X :
Mu
=
1717.78
kg-m
=
17177800
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
Mn
=
Mu
=
17177800
=
21472250
N-mm
0.8

Rn
=
Mn
=
21472250
=
21472250
=
2
b x dx
1000
x
94 2
8836000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25

1
1
m

=
1
18.82
=
0.00647
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
400
0.0271
0.75
*
0.75
*
0.00350

2 Rn m

fy

1
1

1.4
400

2.430
400

0.00350

18.82

( Chu-Kia wang hal 49)

600

600 fy

0.85

25

0.85

x
600

600
+

400

b
0.0271
>

0.00647

=
0.0203
max
=
0.00647
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00647
x
1000
x
94
2
=
608.09
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
12 - 125 mm
(as =
905.14
mm2
)
Tulangan arah Y :
Mu
=
1717.78
kg-m
=
17177800
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
Mn
=
Mu
=
17177800
=
21472250
N-mm
0.8

Rn
=
Mn
=
21472250
=
21472250
=
2
b x dy
1000
x
82 2
6724000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25

1
1
m

=
1
18.82
=
0.00869
Cek rasio penulangan :
min
=
0.00350
max
=
0.0203

min
Digunakan

0.00350

1
1

2 Rn m

fy

>

0.00869

3.193
400

18.82

max
=
0.00869
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00869
x
1000
x
82
2
=
712.99
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
12 - 125 mm
(as =
905.14
mm2
)
PERHITUNGAN TULANGAN STRUKTUR PLAT BORDES :

Diasumsikan menggunakan tulangan

=
12 mm
Selimut beton diasumsikan dengan tebal
=
20 mm
dx
=
Tebal plat - Selimut beton - (0,5 x diameter tulangan)
=
120
20
0.5
x
12
=
94 mm
dy
=
Tebal plat - Selimut beton - diameter tulangan - (0,5 x diameter tulangan)
=
120
20
12
0.5
x
12
=
82 mm

baik untuk arah x atau y

Tulangan arah X :
Mu
=
1356.44
Mn
=
Mu
=

kg-m
=
13564400
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
13564400
=
16955500
N-mm
0.8
16955500
=
16955500
=
1000
x
94 2
8836000
400
=
18.82
0.85
x
25

Rn

Mn
b x dx2
fy
0.85 x fc'

=
=

1
1
m

=
1
18.8
=
0.00504
Cek rasio penulangan :
min
=
1.4
fy
0,85 fc
b
fy

max
min
Digunakan

=
=
=
=

x
400
0.0271
0.75
*
0.75
*
0.00389

2 Rn m

fy

1
1

1.4
360

1.919
400

0.00389

600

600 fy

( Chu-Kia wang hal 49)

0.85

25

0.85

18.82

x
600

600
+

400

b
0.0271
>

0.00504

=
0.0203
max
=
0.00504
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00504
x
1000
x
94
2
=
473.38
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
12 - 150 mm
(as =
754.29
mm2
)
Tulangan arah Y :
Mu
=
1356.44
kg-m
=
13564400
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
Mn
=
Mu
=
13564400
=
16955500
N-mm
0.8

Rn
=
Mn
=
16955500
=
16955500
=
2
b x dy
1000
x
82 2
6724000
m
=
fy
=
400
=
18.82
0.85 x fc'
0.85
x
25


1
1
m

=
1
18.82
=
0.00673
Cek rasio penulangan :
min
=
0.00389
max
=
0.0203

min
Digunakan

1
1

0.00389

2 Rn m

fy

>

0.00673

2.522
400

=
=
=
=

18.82

max
=
0.00673
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00673
x
1000
x
82
2
=
551.90
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan ;
12 - 150 mm
(as =
754.29
mm2
)
Jadi tulangan yang dipakai adalah
plat tangga arah x
plat tangga arah y
bordes arah x
bordes arah y

12 - 125 mm
12 - 125 mm
12 - 150 mm
12 - 150 mm

mm

Kg/m

mm

baik untuk arah x atau y.

ungan SAP 2000 V.11.0.0)


(Chu Kia Wang Hal. 54 - 55)

2.430

( Chu-Kia wang hal 49)

ng tulangan.

0.02032

ungan SAP 2000 V.11.0.0)


(Chu Kia Wang Hal. 54 - 55)

3.193

0.02032

ng tulangan.

baik untuk arah x atau y.

ungan SAP 2000 V.11.0.0)


(Chu Kia Wang Hal. 54 - 55)

1.919

( Chu-Kia wang hal 49)

0.02032

ng tulangan.

ungan SAP 2000 V.11.0.0)


(Chu Kia Wang Hal. 54 - 55)

2.522

ng tulangan.

0.02032

10,85fc 2Rn60m
b 1

PERHITUNGAN BALOK BORDES

menentukan dimensi balok bordes, L = 400 Cm


h=

1/12

1/12

400

b=

2/ 3

2/ 3

35

33.3

35

Cm

23

25

Cm

jadi ukuran balok bordes = 25/35


Pembebanan balok bordes
(PPIUG 1983 hal. 11-12)
berat sendiri balok bordes

0.35 x 0.25 x 2400 kg/m3

210.00 Kg/m

berat plat bordes

qu plat bordes

3619.20 Kg/m

PERHITUNGAN TULANGAN BALOK BORDES


dimensi
=
250
/
350
selimut beton
=
40 mm
tul utama
=
16 mm
sengkang
=
10 mm
Mu tumpuan
Mu lapangan
Vu
d

=
=
=

=
=
=

h
350
292

5105.60
2552.80
7658.40

Mn
b x d2
fy
0.85 x fc'

=
=

1
1
m

=
1
18.82
=
0.00810

kg-m
kg-m
kg

=
=
=

Selimut beton
40

51056000
25528000
76584

sengkang
10

N-mm
N-mm
N
-

(perhitungan SAP 2000 V.11.0.0


(perhitungan SAP 2000 V.11.0.0
(perhitungan SAP 2000 V.11.0.0
0,5 tulangan utama
8

kg-m
=
51056000
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
51056000
=
63820000
N-mm
0.8
63820000
=
63820000
=
2.994
250
x
292 2
21316000
400
=
18.82
0.85
x
25

mm

mm

Tulangan tumpuan :
Mu
=
5105.60
Mn
=
Mu
=
Rn

3829.20 Kg/m

2 Rn m

fy

2.994
400

18.82

mfy 6f0y

Cek rasio penulangan :


min
=

1.4
fy

1.4
400

0,85 fc

600
1
fy

600 fy

max
min

=
=
=
=
=

Digunakan

0.85

x
400
0.0271
0.75
*
0.75
*
0.00350

25

0.85

0.00350

( Chu-Kia wang hal 49)

x
600

600
+

400

0.0271

>

0.00810

=
0.0203
max
=
0.00810
<
=
untuk menghitung kebutuhan luas penampang tulangan.

Menentukan tulangan yang terpakai :


As
=
.b.d
=
0.00810
x
250
x
292
2
=
591.51
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan :
mm2
4 16 mm
(as =
804.57
)
>
Asperlu =

0.02032

591.51

As'
=
0.5As
=
591.51
*
0.5
=
295.76
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan :
mm2
2 16 mm
(as =
402.29
)
>
Asperlu =

295.76

Cek rasio momen nominal penampang :


=
T
C

As . fy 0,85 . fc . 1.x.b

x
x

As . fy
0,85 . fc . 1.b
0.85

Mn 4-D16

=
=

Mn perlu
Mn 4-D16

=
=
=

804.57
25

*
*

As . fy d

804.57

84225836.56182 N-mm
N-mm
63820000
84225836.56182 N-mm

400
0.85
=

=
*

71.27

mm

250

1. x

As . fy d

400

292

Mn perlu

0.85

*
2

71.27

63820000

N-mm

Tulangan lapangan :
Mu
=
2552.80
Mn
=
Mu
=

Rn

Mn
b x d2
fy
0.85 x fc'

=
=

kg-m
=
25528000
N-mm
(perhitungan SAP 2000 V.11.0.0
(Chu Kia Wang Hal. 54 - 5
25528000
=
31910000
N-mm
0.8
31910000
=
31910000
=
1.497
250
x
292 2
21316000
400
=
18.82
0.85
x
25

1
2 Rn m

1 1

m
fy

=
1
2
x
1.497
x
18.82
1
1
18.82
400
=
0.00388
Cek rasio penulangan :
min
=
0.00350
max
=
0.0203
min
max
=
0.00350
>

=
0.00388
<
=
Digunakan

=
0.00388
untuk menghitung kebutuhan luas penampang tulangan.
Menentukan tulangan yang terpakai :
As
=
.b.d
=
0.00388
x
250
x
292
=
283.57
mm2
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan :
mm2
2 16 mm
(as =
402.29
)
>
Asperlu =

As'
=
0.5As
=
283.57
*
0.5
=
141.78
mm
Berdasarkan tabel luas penampang tulangan baja per meter panjang plat, dipakai tulangan :
mm2
2 16 mm
(as =
402.29
)
>
Asperlu =

0.02032

283.57

141.78

Cek rasio momen nominal penampang :


=
T
C

As . fy 0,85 . fc . 1.x.b

x
x

As . fy
0,85 . fc . 1.b

=
0.85

Mn 2-D16

=
=

Mn perlu
Mn 2-D16

=
=
=

402.29
*
27

*
*

As . fy d

402.29

40460504.35534 N-mm
N-mm
31910000
40460504.35534 N-mm

360
0.85
=

=
*

29.70

mm

250

1. x

As . fy d

360

292

Mn perlu

0.85

*
2

29.70

31910000

N-mm

TULANGAN GESER BALOK BORDES


=
kg
=
76584
Vu
7658.40
=
Ln
L
0.5(bkolom+bkolom)
=
=
4
0.25
3.75
kontrol dimensi balok

0.75

5
6
5
6

N
m

=
Vc

1
6
1
6
0.75

fc

>

5.20

250

292

>

76584

>

76584

fc

*
*

5.20

penulangan tumpuan
Vumax
=
76584.0
=
X=d
292 mm
=
Vu
ln
ln

250

292

63219.9

N
x

(ACI 318-83M dalam Chu Kia Wang ha

47415

>

Vc

Vumax

Vu
Vc

=
70620.66
63219.85
0.75
menentukan jarak tulangan
direncanakan menggunakan tulangan sengkang
=
Av
2
*
As
=
2
*
1
*
3.14
4
=
S
Av
*
fy
*
d
Vs
=
592.663 mm
Vs

Vumax

237074.5
menentukan Vc
=
Vc

(perhitungan SAP 2000 V.11.0.0

63219.85

47415
3750

N
-

(perlu tulangan geser)

292

76584.0

3750

70620.66

30941.02

10

10^2

157

mm
157

mm2

400
30941.02

292

(Chu Kia Wang hal 137)

kontrol jarak sengkang


(SNI 03-2847-2002 pasal 23.3.3.2 hal. 209)
Smax

d
=
292
=
73 mm
4
4
Smax

24
*
s
=
240 mm
Smax

300 mm
diambil yang terkecil sehingga sengkang di pasang

10

70

mm

penulangan lapangan
=
X
1.00
Vu

Vu
Vs

ln

(1/4 bentang)
ln

=
=

Vumax

3750

1000

76584

3750

=
=

56161.60
47415

56161.6
N
>
Vc
Vu
Vc

=
56161.60
63219.85
=
11662.28
0.75
menentukan jarak tulangan
direncanakan menggunakan tulangan sengkang
=

10
=
Av
2
*
As
=
=
2
*
1
*
3.14
*
10^2
4
=
=
S
Av
*
fy
*
d
157
*
Vs
=
1572.39 mm
kontrol jarak sengkang
(SNI 03-2847-2002 pasal 23.3.10.4.3)
Smax

d
=
292
=
146 mm
2
2
diambil yang terkecil sehingga sengkang di pasang

(perlu tulangan geser)

mm
157

mm2

400
11662.28

10

140

292

AP 2000 V.11.0.0)
AP 2000 V.11.0.0)
AP 2000 V.11.0.0)

AP 2000 V.11.0.0)

a Wang Hal. 54 - 55)

ia wang hal 49)

0.02032

591.51

mm2

295.76

mm2

(OK)

AP 2000 V.11.0.0)

a Wang Hal. 54 - 55)

0.02032

283.57

mm2

141.78

mm2

(OK)

AP 2000 V.11.0.0)

(dimensi OK)

m Chu Kia Wang hal. 139)

tulangan geser)
76584.0

76584

tulangan geser)

Daftar Pustaka

Chu Jia Wang, Charles G Salmon.1990.Desain Beton Bertulang.Jakarta: Erlangga

Gideon, W.C. Vis.1993.Dasar-Dasar Perencanaan Beton Bertulang (Seri Beton 1).

Jakarta: Erlangga

Gideon, W.C. Vis.1993.Grafik dan Tabel Perhitungan Beton Bertulang (Seri Beton 4). Jakarta: Erlangga
Peraturan Pembebanan Indonesia Untuk Gedung (PPIUG) tahun 1983
Peraturan Beton Bertulang Indonesia (PBI) tahun 1971
Sardjono.1991.Pondasi Tiang Pancang.Surabaya: Sinar Wijaya
SNI 03-2847-2002 Tentang Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung
SNI-1726 - 2002 Standar Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung

arta: Erlangga

karta: Erlangga