HANDBOOK
SP POWERGRID LTD
Table of Content
1.0 Switchgear Room
Removable Stainless Steel Hand Railings..3
Switchgear Louvred Door5
HT Openings & Floor Frame....12
Opening for Marshaling Box, Pilot Box & Battery Charger.15
Equipment Dimension.......................16
LT Openings...17
DB Box19
Trap Door...20
Lightings.24
Isolator25
2.0 Cable Basement
Cable Basement Door26
Red Luminous Paint..27
Cable Ramp And Entry Pipes...29
3.0 Transformer Room
Transformer Room Door...31
Transformer Plinth32
4.0 Substation w/o cable basement.34
5.0 Temporary Substation...35
6.0 Earthing for s/s Lighting...40
SP POWERGRID LTD
7.0 Fencing41
8.0 Draw Pit..42
9.0 Substation Main Gate44
Butterfly Lock.44
10.0 Others
10.1 Signage46
10.2 MCT47
10.3 Cable Lugs..48
10.4 Hot Gland...51
11.0 Arrangement of single core cable..52
12.0 Backfill of sand at trench (for substation w/o cable basement)53
13.0 Things to include in Handover Letter..54
SP POWERGRID LTD
Switchgear Room
Removable Stainless Steel Hand Railings
Reference: Appendix 11, Railings
100mm
SP POWERGRID LTD
SP POWERGRID LTD
50mm
SP POWERGRID LTD
55mm
150mm
55mm
40mm
18mm
65mm
20mm
15mm
SP POWERGRID LTD
30mm
SP POWERGRID LTD
1m
SP POWERGRID LTD
SP POWERGRID LTD
All doors to be fitted with good quality door hook and must be able to open fully.
SP POWERGRID LTD
SP POWERGRID LTD
Screed the floor 5mm below the floor frame, after the floor frame had been fixed
SP POWERGRID LTD
SP POWERGRID LTD
30mm gap
SP POWERGRID LTD
IDS
RTU
Marshalling
Pilot
Battery
Tools & Key Cabinet
Charger
Box
Box
SP POWERGRID LTD
Equipment Dimension
Item
DIMENSION
(L X B X H)mm
BATTERY CHARGER
RTU
MARSHALLING BOX
PILOT BOX
IDS
SP POWERGRID LTD
LT Openings
To provide (2x25mm2)+16mm2 cu cable with 1m of flexi hose and hot gland from DB box to
right side of the LT opening.
SP POWERGRID LTD
SP POWERGRID LTD
Distribution Box
Reference: Appendix 15, Electrical Installation
SP POWERGRID LTD
Trap Door
Reference: Appendix 11, Aluminum Trap Door & Cat Ladder
860mm x 860mm
Alum Trap Door
760mm x 760mm
opening
250mm
SP POWERGRID LTD
1500mm
375mm
SP POWERGRID LTD
200mm
SP POWERGRID LTD
300mm
200mm
SP POWERGRID LTD
Lightings
Reference: Appendix 15, Electrical Installation
Wall Lighting
2.4m
Ceiling Lighting 3m
SP POWERGRID LTD
Isolator
Isolator
1.5m
SP POWERGRID LTD
Cable Basement
Cable Basement Door
Reference: Appendix 12, Switchgear & Cable Chamber Exit Door
SP POWERGRID LTD
To paint front and back of all beam with 50mm Red Luminous Paint
SP POWERGRID LTD
SP POWERGRID LTD
200mm
150mm
SP POWERGRID LTD
200mm
SP POWERGRID LTD
2x50mm
SP POWERGRID LTD
Transformer Plinth
Appendix 11, Layout Plan
75mm x 25mm
Deep Grove
SP POWERGRID LTD
Angled-iron to be
solidly welded
across the trench
All cable trenches to be covered by removable hot-dipped galvanized mild steel gratings
Angled-iron to be
solidly welded
across the trench
SP POWERGRID LTD
SP POWERGRID LTD
Temporary Substation
SP POWERGRID LTD
LT Opening (OGB)
200mm
SP POWERGRID LTD
SP POWERGRID LTD
Trap Door
SP POWERGRID LTD
SP POWERGRID LTD
To DB Box
SP POWERGRID LTD
Fencing
Reference: Appendix 15, Fencing (where required)
SP POWERGRID LTD
Draw Pit
SP POWERGRID LTD
SP POWERGRID LTD
Butterfly Lock
Reference: Appendix 13, Gate Details
SP POWERGRID LTD
SP POWERGRID LTD
Signage
SP POWERGRID LTD
MCT
SP POWERGRID LTD
Cable Lugs
SP POWERGRID LTD
SP POWERGRID LTD
SP POWERGRID LTD
Hot Gland
SP POWERGRID LTD
L3
L2
L1
L1
L2
L3
280mm
380mm
200mm
280mm
Arrangement 2
L3
L2
L3
L1
L1
L2
SP POWERGRID LTD
SP POWERGRID LTD