Professional Documents
Culture Documents
WS Calculation
WS Calculation
Location : Jeddah
Project :
Date
Designed by :
Assumed Data
Calculated data
No. of Rooms
1
1
0
10
1
Project
Location
:
:
XXX
Jeddah
private
FIXTURES / POINT NO.
B3
B2
B1
Date
Designed by
Assumed Data
Calculated data
G.F.
F.F
:
:
2nd.F
3rd F
4th F.
5th F
6th F
7th F
8th F
9th F
10th F
11th F
12th F
13th F
14th F
Total fixtures
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Project
Location
:
:
XXX
Jeddah
private
FIXTURES / POINT NO.
B3
B2
B1
Water Bidet
Janitor Sink
Service sink
Shower
Bath tub
Kitchen sink
Dishwashing machine
Laundry
Ablution (Public)
Hot
Water Bidet
0.75
0.75
0.75
0.75
0.75
0.75
Janitor Sink
0.75
0.75
Service sink
1.5
1.5
Shower
1.5
1.5
Bath tub
1.5
1.5
Kitchen sink
1.5
1.5
1.5
1.5
Ablution (Public)
10
Dishwashing machine
Laundry
flush tank
valve
0.0
0.0
0.0
0.0
0
6
8
10
12
14
16
18
20
25
30
35
40
45
50
60
70
80
90
100
120
140
160
180
200
225
250
275
300
400
500
750
1000
1250
1500
1750
2000
2250
2500
2750
0
5
6.5
8
9.2
10.4
11.6
12.8
14
17
20
22.5
24.8
27
29
32
35
38
41
43.5
48
52.5
57
61
65
70
75
80
85
105
125
170
208
240
267
294
321
348
375
402
0
27
27
27
28.6
30.2
31.8
33.4
35
38
41
43.8
46.5
49
51.5
55
58.5
62
64.8
67.5
72.5
77.5
82.5
87
91.5
97
101
105.5
110
126
142
178
208
240
267
294
321
348
375
402
3000
4000
5000
6000
7000
8000
9000
10000
432
525
593
643
685
718
745
769
432
525
593
643
685
718
745
769
Public
Cold
Hot
Total
10
10
Water Bidet
1.5
1.5
1.5
1.5
1.5
1.5
Janitor Sink
1.5
1.5
Service sink
2.25
2.25
Shower
Bath tub
Kitchen sink
Dishwashing machine
Laundry
Ablution (Public)
1.5
10
10
Date
Designed by
Assumed Data
Calculated data
:
:
G.F.
F.F
2nd.F
3rd F
4th F.
5th F
6th F
Fixtures type :
private
in Fixture units
Total
Quantity
Hot
Total
1.5
10
0.0 GPM
0.0 GPM
0.00 m3/h
0.00 m3/h
0.0 GPM
0.00 m3/h
Private
Cold
Hot
Total
6
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
10
10
7th F
8th F
9th F
10th F
11th F
12th F
13th F
14th F
Total fixtures
Project : XXX
Location : Jeddah
Date
: August 31, 2009
Designed by : SAK-EC
Assumed Data
Calculated data
Given Data:
Number of persons
= 1
Design Basis of Water Supply System
= 400
= 1
= 0.000
= 2
= 150
= 3
= 153
= 3
= 10
= 6
=
=
=
=
51
3
10
6
= 0.5
= 1
31, 2009
ED to change
Project : XXX
Location : Jeddah
Date
:
Designed by :
Assumed Data
Calculated data
Q (m3/day)
Pump working hours
= 1
= 12
Then
Lifting Pump Calculations
Pump Discharge
Q (GPM)
= 1
Pump Head
Static Head Hs (m)
= 11
Losses
= 5.55
= 19
= 4.64
Power
Pump Efficiency
Power (Hp)
= 0.8
= 1
= 0
= 11
Power
Pump Efficiency
= 0.8
Power (Hp)
= 0
XXX
Jeddah
Date
:
Designed :
Assumed Data
Calculated data
Head loss calculation using
(1)
COLBROOK Formula
m/s
1/1
1/1
1/1
7.4
DH Total loss
RE Reynolds number
V Mean Velocity
GH Static head
2.646
42
0.01
2.0 Strainer
10
0.5 reducer
l/s
53.6
0.9 tee
GPM
PVC
DN
mm
63
no.
Q Flow rate
PUMP TO A
L Pipe length
mm
K Pipe roughness
DN Nominal diameter
m
0.788
Accumulative Pressure
:
:
Project
Location
5.788 5.78795
A TO B
50
PVC
42.6
2.5
0.01
40
2.52
0.9
B TO C
50
PVC
42.6
25
0.01
28
1.764
2.5
C TO D
40
PVC
34
15
0.01
19
1.197
1.9
D TO E
25
PVC
21.2
15
0.01
0.378
1.9
E TO F
20
PVC
17
0.01
0.315
2.7
17.3
10
TOTAL
73
1.387787
23592.3798 0.0261851
0.111
1.192
1.192 8.35343
1.021
1.021 9.37446
15.55
###
Static head
10.00 m
###
5.00 m
###
5.55 m
###
20.55 m
###
Add 10 % safety
0.00 =
22.61 m
###
Hs1 + Hs2
Where:
. (1)
Hs1
Hs2
J = l . V / ( 2 g D ) .... (3)
Where:
J
L
l
V
g
D
1
sqr(l)
Where:
= - 2 x log [
K
D
RE
k
3.7 x D
2.51
Re x sqr( l )
RE = V x D / n . ( 5 )
Where:
V = Q /A
Where:
: water viscosity= ( n =
V
D
0.000001
.... ( 6 )
Q
A
m2/s)
300 PVC
D =
K =
Flow :
#N/A mm
0.2674 m
0.00001 m
V = Q /A =
Re = V x D / n =
0.449 m/s
0.449 x 0.2674 / 0.000001 = 119991.16
0.00001
3.7 x 0.267
= - 2 log [
m/sec
A = p x D2 / 4 =
1
sqr(l)
300
#N/A mm
2.51
x sqr( l )
119991.2
0.01754
0.01754 x 0.4487 x 0.449
2 x 9.81 x 0.2674
J = l . V / ( 2 g D ) =
= 0.00067 m/m
m / 100m
Where:
G
V
SUM ZE
SUM ZE =
gate valve
Multimedia filter
Foot valve
check valve
elbow ( 45 leg.)
elbow ( 90 leg.)
tee
reducer
3
1
1
1
1
0
0
0
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
=
=
=
=
=
=
=
=
0.6
1
1
2
0.3
0
0
0
Strainer
discharge outlet
6.90
SUM ZE . V / ( 2 . g )
6.9 x
0.4487 X 0.4487
2 x 9.81
= 0.0708 m
300
D =
K =
Flow :
PVC
#N/A mm
0.2674 m
0.00001 m
V = Q /A =
Re = V x D / n =
= - 2 log [
m/sec
A = p x D2 / 4 =
1
sqr(l)
=f_loss!B11
#N/A mm
0.177 m/s
.177 x 0.2674 / 0.000001 = 37694.59
0.00001
3.7 x 0.267
l=
2.51
0.02241
J = l . V / ( 2 g D ) =
x sqr( l )
37694.6
= 0.00017 m/m
m / 100m
SUM ZE . V / ( 2 . G )
SUM ZE =
HS2
gate valve
Multimedia filter
Foot valve
check valve
elbow ( 45 leg.)
elbow ( 90 leg.)
tee
reducer
Strainer
discharge outlet
Total local factors
=
0
0
0
0
0
0
1
0
0
0
x
x
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
2
1
=
=
=
=
=
=
=
=
=
=
=
0
0
0
0
0
0
0.9
0
0
0
0.90
SUM ZE . V / ( 2 . g )
0.9 x
0.1771 X 0.1771
= 0.0018 m
0.9 x
2 x 9.81
= 0.0018 m
350
D =
K =
Flow :
PVC
#N/A mm
#N/A mm
0.3024 m
0.00001 m
A = p x D2 / 4 =
V = Q /A =
Re = V x D / n =
1
sqr(l)
0.307 m/s
.307 x 0.3024 / 0.3 = 92840.38
0.00001
3.7 x 0.302
= - 2 log [
m/sec
l=
2.51
+
0.01844
J = l . V / ( 2 g D ) =
Loss m per 100 m = J x 100 =
x sqr( l )
47129.3
= 0.0 m/m
m / 100m
SUM ZE . V / ( 2 . G )
SUM ZE =
HS2
gate valve
Multimedia filter
Foot valve
check valve
elbow ( 45 leg.)
elbow ( 90 leg.)
tee
reducer
Strainer
discharge outlet
0
=
0
0
0
0
0
8
0
1
0
0
x
x
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
2
1
=
=
=
=
=
=
=
=
=
=
=
0
0
0
0
0
2.4
0
0.5
0
0
2.90
SUM ZE . V / ( 2 . g )
2.9 x
0.307 X 0.307
2 x 9.81
= 0.0 m
250
D =
K =
Flow :
PVC
#N/A mm
0.2128 m
0.00001 m
V = Q /A =
Re = V x D / n =
m/sec
A = p x D2 / 4 =
1
sqr(l)
250
#N/A mm
0.177 m/s
.177 x 0.2128 /
= 92840.38
0.00001
3.7 x 0.213
= - 2 log [
2.51
x sqr( l )
0.0
0.02241
0.02241 x 0.1771 x 0.177
2 x 9.81 x 0.2128
J = l . V / ( 2 g D ) =
= 0.0 m/m
m / 100m
Where:
G
V
SUM ZE
SUM ZE =
gate valve
Multimedia filter
Foot valve
check valve
elbow ( 45 leg.)
elbow ( 90 leg.)
tee
reducer
0
0
0
0
0
2
0
1
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
=
=
=
=
=
=
=
=
0
0
0
0
0
0.6
0
0.5
Strainer
discharge outlet
1.10
SUM ZE . V / ( 2 . g )
1.1 x
0.1771 X 0.1771
2 x 9.81
= 0.0018 m
200
D =
K =
Flow :
PVC
#N/A mm
0.1702 m
0.00001 m
V = Q /A =
Re = V x D / n =
m/sec
A = p x D2 / 4 =
1
sqr(l)
200
#N/A mm
0.277 m/s
0.277 x 0.1702 /
= 47129.31
0.00001
3.7 x 0.17
= - 2 log [
2.51
x sqr( l )
47129.3
0.02137
0.02137 x 0.2769 x 0.277
2 x 9.81 x 0.1702
J = l . V / ( 2 g D ) =
= 0.00049 m/m
m / 100m
Where:
G
V
SUM ZE
SUM ZE =
gate valve
Multimedia filter
Foot valve
check valve
elbow ( 45 leg.)
elbow ( 90 leg.)
tee
reducer
0
0
0
0
0
3
0
1
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
=
=
=
=
=
=
=
=
0
0
0
0
0
0.9
0
0.5
Strainer
discharge outlet
3.40
SUM ZE . V / ( 2 . g )
3.4 x
0.2769 X 0.2769
2 x 9.81
= 0.0133 m
150
D =
K =
Flow :
PVC
#N/A mm
#N/A mm
0.1362 m
0.00001 m
Re = V x D / n =
1
sqr(l)
0.216 m/s
0.216 x 0.1362 /
= 29447.17
0.00001
3.7 x 0.136
= - 2 log [
m/sec
A = p x D2 / 4 =
V = Q /A =
150
2.51
x sqr( l )
0.0
0.02377
0.02377 x 0.2162 x 0.216
2 x 9.81 x 0.1362
J = l . V / ( 2 g D ) =
Loss m per 100 m = J x 100 =
= 0.0 m/m
m / 100m
Where:
G
V
SUM ZE
SUM ZE =
HS2
0
0
0
0
0
2
0
1
0
0
x
x
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
2
1
=
=
=
=
=
=
=
=
=
=
=
0
0
0
0
0
0.6
0
0.5
0
0
1.10
SUM ZE . V / ( 2 . g )
1.1 x
0.2162 X 0.2162
2 x 9.81
= 0.0026 m
63
D =
K =
Flow :
PVC
#N/A mm
#N/A mm
0.0536 m
0.00001 m
Re = V x D / n =
1
sqr(l)
1.396 m/s
1.396 x 0.0536 /
= 74826.58
0.00001
3.7 x 0.054
= - 2 log [
m/sec
A = p x D2 / 4 =
V = Q /A =
63
2.51
x sqr( l )
0.0
0.01993
0.01993 x 1.396 x 1.396
2 x 9.81 x 0.0536
J = l . V / ( 2 g D ) =
Loss m per 100 m = J x 100 =
= 0.0 m/m
m / 100m
Where:
G
V
SUM ZE
SUM ZE =
HS2
0
0
0
0
0
1
0
1
0
1
x
x
x
x
x
x
x
x
x
x
0.2
1
1
2
0.3
0.3
0.9
0.5
2
1
=
=
=
=
=
=
=
=
=
=
=
0
0
0
0
0
0.3
0
0.5
0
1
1.80
SUM ZE . V / ( 2 . g )
1.8 x
1.396 X 1.396
2 x 9.81
= 0.1788 m
0.00067 m/m
0.0708 m
0.00017 m/m
0.0018 m
0.0018 m
0.0 m/m
0.0 m
0.0 m/m
0.0018 m
0.00049 m/m
0.0133 m
0.0 m/m
0.0026 m
0.0 m/m
0.1788 m
Project : XXX
Location : Jeddah
Date
Designed by : SAK-EC
= 1
Boiler Design
Water Consumption(L/person/day)
Hot Water Consumption (L)
= 400
= 120
=
=
=
=
=
= 4
= 2
= 2
1
1
3
3
25%
Project : XXX
Location : Jeddah
Date
:
Designed by :
=
=
=
=
=
1
1
11
0.8
1
Project : XXX
Location : Jeddah
Date
:
Designed by :
= 0
= 0
= 30
No. of cars
= 20
= 1
Laundry Drainage
Laundry Demand (L / bed / day)
= 130
No. of beds
Laundry Drainage (L / min)
= 1
= 1
Kitchen Drainage
Kitchen Demand (L / person / day)
= 160
No. of persons
Kitchen Drainage (L / min)
= 1
= 1
= 3
= 10
= 0
= 1.5
= 1
= 40%
= 60%
= 2
Sump Dimension
= 2
= 2
= 2
Project : XXX
Location : Jeddah
Date
:
Designed by :
= 8
= 10
=
=
=
=
14
0.014
1
140
Pump Head
Static Head Hs (m)
Assume Losses (m)
Losses
= 6
= 0.1
= 0.6
= 8
Power
Pump Efficiency
Power (Hp)
= 0.8
= 2
Project : XXX
Location : Jeddah
Date
: August 31, 2009
Designed by : SAK-EC
= 1
= 1
= 1
Assume
Reaction Tank Dimension
3
= 3
= 3
Length (m)
Width (m)
Depth (m)
Water Dimensions
Depth (m)
3
= 3
= 2.5
= 22.5
= 1
Length (m)
Width (m)
Filter Design
Filtration Rate (m3/m2/h)
Qpump (m3/h)
Filter Area (m2)
= 22.5
= 4
= 5.63
Filter Diameter
(m)
= 2.68
Project : XXX
Location : Jeddah
Date
:
Designed by :
= 23
= 12
= 12.0
= 1
= 11
= 0.8
= 1