BINA - KURWAI - SIRONJ BOT ROAD PROJECT

EARTH WORKS FOR 10.0 KM FROM CH 36+000 TO CH 46+000

TENDER NO : TCIL/BHS/NIT/BKS/11-12/CIVIL/51
Item No.

Description

Unit

Estimated
Quantity

Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto
1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum
bucket capacity including cutting and loading in tippers, trimming bottom and side
slopes, in accordance with requirements of lines, grades and cross sections, and
transporting to the embankment location within all lifts and lead upto 1000m)

cum

Construction of embankment with approved material obtained from approved borrow


areas with all leads and lifts, transporting to site, spreading, grading to required slope
and compacted to meet requirement of Table 300-2, satisfying the soaked CBR value
of not less than 7%, all complete as per drawing and Technical Specifications Clause
305.

cum

57200

Construction of embankment with suitable materials deposited at site from roadway


and drainage excavation with CBR not less than 7% complete as per Technical
Specifications Clause 305, including all leads and lifts.

cum

6800

Loosening and re-compacting of existing ground where the existing ground is


serving/suitable as subgrade complete as per Technical Specifications Clauses 301 &
305.

Cum

27500

Scarifying and disposal existing bituminous surface layer(s) as per


Specifications 202.

Technical

Sqm

55000

Construction of subgrade with approved material obtained from approved borrowpits


with all leads and lifts, transporting to site, spreading, grading to required slope and
compacted to meet requirement of Table 300-2, satisfying the soaked CBR value of
not less than 7%, all complete as per drawing and Technical Specifications Clause
305.

cum

67000

5000

Rates in Rs.

Rate in Rs. (words)

AMOUNT

Construction of earthen shoulders with approved material obtained from approved


borrowpits with CBR more than 12% with all leads and lifts, transporting to site,
spreading, grading to required slope and compacted to meet requirement of Table 3002, all complete as per drawing and Technical Specifications Clause 305.
TOTAL AMOUNT

cum

17000