"Classic Limitations" of Tendering NRW Projects?: Arjun Thapan Waterloss 2012 Manila, Philippines
"Classic Limitations" of Tendering NRW Projects?: Arjun Thapan Waterloss 2012 Manila, Philippines
Separation Vs Continuity
If Continuity for downstream work is essential, then
Initial RFP will specifically say so
Factors used in selection of consultant will take likelihood
of continuation into account
Technical approach, Experience acquired, and continued
Professional Liability will be key in determining rationale
for continuing with the same consultant